GovHandbook

P2 zone in Cache Creek: Public Utilities

Cache Creek, British ColumbiaDraft, not yet reviewedBylaw read 2026-11-08

In short

Government services and utilities.

Zone rules

PurposeGovernment services and utilities.
Main uses
  • Public Utility
  • Fire Hall
  • Police Station
  • Animal Pound
  • Accessory Use
  • Sanitary Landfill
Also allowed (secondary uses)Accessory Buildings and Structures to a permitted use
Maximum height15.0 m (49 ft)
Maximum height, accessory buildings1.5 m (5 ft) less than the principal building
Front setback10.0 m (33 ft)
Rear setback10.0 m (33 ft)
Interior side setback10.0 m (33 ft) (side parcel line)
Street side setback10.0 m (33 ft) (side parcel line)

Source: Village of Cache Creek Zoning Bylaw No. 6-010, 2026, s. 8.12 (read 2026-11-08)

Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. The Village adopted this bylaw in 2026 and says it replaces the old Zoning Bylaw (parts dating from the 1980s). The zoning map is Schedule A, on pages 73 onward of the PDF. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.

This zone as Markdown · JSON · all Cache Creek zones · Report an error