GovHandbook

Clearwater fence rules: permits and height limits

Do I need a permit to build a fence, and how high can it be?

Clearwater, British ColumbiaChecked against official textSources read 2026-11-08

Short answer

In Clearwater a fence does not need a building permit. In the R-1, R-2 and R-3 zones a fence can be 1.2 m high in the front yard and 2 m in the side and rear yards. Retaining walls over 1.2 m do need a permit.

Key facts

PermitNo building permit: Building Regulations Bylaw 129 defines a structure as excluding fences. A retaining wall over 1.2 m (4 ft) does need a permit. Zoning Bylaw height and corner-sightline rules still apply.Building Regulations Bylaw No. 129, 2014 (PDF, consolidated to May 4, 2021), s. 2 Definitions, "Structure"; s. 1.4(h) · Wording matched the official text retrieved 2026-11-08
Official wording
but specifically excludes landscaping, fences, paving and
(h) the design and construction of retaining walls where the difference in finish
Height, front yard1.2 m (4 ft) in the R-1, R-2 and R-3 zones, in the front yard and the part of a side yard that abuts a street in front of the principal building. Subject to the corner vision triangle.Zoning Bylaw No. 133, 2016 (PDF, consolidated to April 1, 2025), s. 5.11.1(a) · Wording matched the official text retrieved 2026-11-08
Official wording
the following maximum height restrictions shall apply to fences in the R-1, R-2, R-
1.2 metres (4 feet) in the front yard and that portion of a side yard that abuts a street in
Height, side and rear yards2 m (6.5 ft) in the side yard and rear yard in the R-1, R-2 and R-3 zones.Zoning Bylaw No. 133, 2016 (PDF, consolidated to April 1, 2025), s. 5.11.1(b) · Wording matched the official text retrieved 2026-11-08
Official wording
2 metres (6.5 feet) in the side yard and rear yard.
Corner lots and sightlinesIn a residential zone at a street intersection, no landscaping, building or structure over 1 m (3.3 ft) high (above the established grade of the intersecting street) may be placed in a triangle 6 m (20 ft) along the lot lines from the intersection.Zoning Bylaw No. 133, 2016 (PDF, consolidated to April 1, 2025), s. 5.10 · Wording matched the official text retrieved 2026-11-08
Official wording
a lot in a residential zone at the intersection of any
metre (3.3 ft) in height above the established grade
triangular plane 6 metres (20 ft) along the lot lines
Other rulesHeight is measured from the base of the fence. Open mesh or chain link fences for tennis courts, schools, utilities and Civic and Industrial zones may be up to 5 m. Barbed wire is allowed in Commercial, Industrial and Public and Institutional zones if the barbed portion is at least 2.1 m above grade. A building permit is needed for a retaining wall over 1.2 m.Zoning Bylaw No. 133, 2016 (PDF, consolidated to April 1, 2025), s. 5.11.2 to 5.11.4; Building Permits and Inspections, District page · Wording matched the official text retrieved 2026-11-08
Official wording
The height of a fence shall be measured from the base of the fence.
shall not exceed a height of 5 metres (16.5 ft).
b) barbed fences are permitted in Commercial, Industrial and Public and Institutional zones
provided the barbed wire portion is a minimum of 2.1 metres (7ft) above grade at any point;
construct a retaining wall more than 1.2 metres (4 feet) in height;
BylawDistrict of Clearwater Zoning Bylaw No. 133, 2016, s. 5.11 (fence height) and s. 5.10 (corner vision triangle)Zoning Bylaw No. 133, 2016 (PDF, consolidated to April 1, 2025), cover; Zoning Bylaw No. 133, 2016 (PDF, consolidated to April 1, 2025), s. 5.11 · Wording matched the official text retrieved 2026-11-08
Official wording
ZONING BYLAW NO. 133, 2016
CONSOLIDATED APRIL 1, 2025
5.10 CORNER VISION TRIANGLE ........................................................................................................................ 22 5.11 FENCE HEIGHT RESTRICTIONS .................................................................................................................. 23 5.12 LANDSCAPING AND SCREENING REQUIREMENTS ...................................................................................... 23
DISTRICT OF CLEARWATER ZONING BYLAW NO. 133, 2016 CONSOLIDATED APRIL 1, 2025

How it works

The District's Building Regulations Bylaw No. 129 defines a structure as excluding fences, so a fence does not need a building permit. A retaining wall over 1.2 m (4 ft) does. Height rules are in section 5.11 of the Zoning Bylaw No. 133.

In the R-1, R-2 and R-3 zones:

  • Front yard (and the part of a side yard that borders a street in front of the main building): 1.2 m (4 ft).
  • Side and rear yards: 2 m (6.5 ft).

Height is measured from the base of the fence.

Steps

  1. Find your zone (see the zoning-lookup answer).
  2. Check the height limit above, and keep the fence out of the corner sightline described below.
  3. If you are building a retaining wall over 1.2 m, apply for a building permit through the TNRD (see the building-permit answer).
  4. Questions? Call TNRD Planning at 250-377-8673 or the District office at 250-674-2257.

Good to know

  • Corner lots: in a residential zone at a street corner, nothing over 1 m (3.3 ft) high may be placed in a triangle 6 m (20 ft) along the lot lines from the intersection. Fences may be placed anywhere on a lot only if they do not block vision at an intersection.
  • Open mesh or chain link fences for tennis courts, schools, utilities and Civic and Industrial zones may be up to 5 m.
  • Barbed wire is allowed in Commercial, Industrial and Public and Institutional zones if the barbed part is at least 2.1 m above the ground.
  • The bylaw sets no fence height limit for other zones, such as rural zones, in the sections we read. Ask TNRD Planning.
  • We found no rule on electric fences or pool fencing in the Zoning or Building bylaws.

Official forms and pages

The same question in other places

Barriere · Sun Peaks · 100 Mile House · Kamloops · Sicamous · Clinton

Fence height limits in British Columbia, by municipality →

Sources

  1. Zoning Bylaw No. 133, 2016 (PDF, consolidated to April 1, 2025) (read 2026-11-08)
  2. Building Regulations Bylaw No. 129, 2014 (PDF, consolidated to May 4, 2021) (read 2026-11-08)
  3. Building Permits and Inspections, District of Clearwater (read 2026-11-08)
  4. Planning Department, District of Clearwater (read 2026-11-08)

Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.