Creston permits for decks, sheds, carports and garages
Do I need a permit for a deck, shed, carport, or garage in Creston?
In Creston a building permit is required for any change, alteration or addition to a structure, and the Town lists detached sheds, garages and workshops as a permit type. No size below which a shed or deck is exempt is stated. Zoning limits also apply.
Key facts
| Sheds | The Town lists 'Detached Sheds, Garages & Workshops' as a building permit type, and says a permit is required for any changes, alterations or additions to a structure. No size below which a shed is exempt is stated.Apply for a Building Permit, Apply for a Building Permit page; Building permit: detached sheds, garages and workshops, Detached Sheds, Garages & Workshops page · Wording matched the official text retrieved 2026-11-06Official wordingA building permit is required for any changes, alterations, or additions to a structure. Detached Sheds, Garages & Workshops For more information, please review the Accessory Building Checklist |
|---|---|
| Decks | Decks are handled under the 'Home Additions or Renovations' building permit page, which points to the BC Housing guide for safe and durable decks. No height below which a deck is exempt is stated.Building permit: home additions or renovations, Home Additions or Renovations page; Apply for a Building Permit, Apply for a Building Permit page · Wording matched the official text retrieved 2026-11-06Official wordingFor information about decks, please review BC Housing Illustrated Guide for safe and durable decks A building permit is required for any changes, alterations, or additions to a structure. |
| Garages and carports | Garages need a building permit: the Town lists 'Detached Sheds, Garages & Workshops' as a permit type. No separate carport rule was found; the fee schedule lists a carport construction value.Apply for a Building Permit, Apply for a Building Permit page; Fees and Charges Bylaw No. 1763 (PDF, consolidated to May 12, 2026), Schedule 3A · Wording matched the official text retrieved 2026-11-06Official wordingDetached Sheds, Garages & Workshops Attached or Detached Garage $50.00 |
| Zoning limits | In R1, an accessory building may be up to 5.0 m high, with setbacks of 6.1 m front, 1.5 m rear, 1.5 m interior side and 3.7 m exterior side, within 50% lot coverage. Accessory buildings under 10.0 sq. m. are exempt from interior side and rear setbacks. Uncovered decks may project up to 2.0 m into front and rear setbacks, never within 1 m of a property line.Zoning Bylaw No. 1958, 2022 (PDF, consolidated to June 16, 2026), R1 zone s. 7.2.4.2, 7.2.5.6, 7.2.3.4; Zoning Bylaw No. 1958, 2022 (PDF, consolidated to June 16, 2026), s. 3.5.3 (ii), (vi), (vii) · Wording matched the official text retrieved 2026-11-06Official wording7.2.4.2 Accessory buildings 6.1m 1.5m 1.5m 3.7m 7.2.3.4 Maximum Lot Coverage: 50% 7.2.5.6 Accessory buildings and Structures 9.2m 11.0m 11.0m 9.2m 5.0m 7.5m building or Structure having an area of less than 10.0 sq. m. on a Lot is exempt from the Interior side and Rear setback requirements Uncovered decks are permitted to project into the Front setback and Rear setback a maximum of 2.0 metres. be located closer than 1 metre from any property line. |
| Bylaw | Building Bylaw Number 1394, 1997; Zoning Bylaw No. 1958, 2022Building Bylaw No. 1394, 1997 (PDF, consolidated to June 28, 2022), s. 1.1; Zoning Bylaw No. 1958, 2022 (PDF, consolidated to June 16, 2026), s. 1.1 · Wording matched the official text retrieved 2026-11-06Official wordingThis Bylaw may be cited for all purposes as the "Building Bylaw Number 1394, 1997". This Bylaw may be cited as "Zoning Bylaw No. 1958, 2022". |
How it works
The Town says a building permit is required for any changes, alterations or additions to a structure, and lists "Detached Sheds, Garages & Workshops" as a permit type (sheds, garages and workshops page). Decks are handled under the Home Additions or Renovations page, which points to the BC Housing guide for safe and durable decks. No size or height below which a shed or deck is exempt is stated in the Building Bylaw. No separate carport rule was found, but the fee schedule lists a carport value.
Zoning limits apply as well. In the R1 zone, an accessory building may be up to 5.0 m high, with setbacks of 6.1 m front, 1.5 m rear, 1.5 m interior side and 3.7 m exterior side, within 50% lot coverage. Uncovered decks may project up to 2.0 m into front and rear setbacks, never within 1 m of a property line.
Steps
- Check your zone and setbacks in the Zoning Bylaw. Other zones differ; for example R5 has accessory height 5.0 m and setbacks of 7.6 m, 7.6 m, 1.8 m and 7.6 m.
- Ask the Building Department whether your project needs a permit (250-428-2214, building@creston.ca).
- Use the checklist on the Apply for a Building Permit page: application form, owner's authorization, title, scaled drawings and site plan.
- Pay the fee when the permit is issued and book inspections.
Good to know
- Accessory buildings under 10.0 sq. m. are exempt from the interior side and rear setbacks. That is a zoning point, not a permit exemption.
- Shipping containers used for storage are accessory buildings (Zoning s. 4.4; Building Bylaw s. 18).
- Fee schedule construction values per sq. ft. include garage $50, carport $30, deck with roof $30 and deck with no roof $25.
Official forms and pages
The same question in other places
Salmo · Kimberley · Cranbrook · Fruitvale · Nelson · Montrose
Deck and shed permit thresholds in British Columbia, by municipality →
Sources
- Apply for a Building Permit, Town of Creston (read 2026-11-06)
- Building permit: home additions or renovations, Town of Creston (read 2026-11-06)
- Building permit: detached sheds, garages and workshops, Town of Creston (read 2026-11-06)
- Building Bylaw No. 1394, 1997 (PDF, consolidated to June 28, 2022) (read 2026-11-06)
- Zoning Bylaw No. 1958, 2022 (PDF, consolidated to June 16, 2026) (read 2026-11-06)
- Fees and Charges Bylaw No. 1763 (PDF, consolidated to May 12, 2026) (read 2026-11-06)
- Contact Directory, Town of Creston (read 2026-11-06)
Checked by script, not yet by a person: the official wording behind 5 of 5 facts was matched to the official text. How answers are checked.