Short answer

In Dawson Creek you need a building permit before you build, repair, alter, move or demolish a building or structure, and before plumbing work. Examples are decks, detached garages, finishing a basement and secondary suites. Email the application package to Building Inspection.

Key facts

Needed forA building permit is needed before excavating for, constructing, repairing, altering, moving or demolishing a building or structure, and before plumbing work. City examples: sheds, detached garages, decks, gazebos, secondary suites, finishing a basement, new buildings, additions, wood-burning appliances.Building Regulation Bylaw 4287 (consolidated), s. 6.1; Building and Renovating, Examples of when you need a permit · Wording matched the official text retrieved 2026-11-06
Official wording
every person shall apply for and obtain a permit before excavating for, construction, repairing, altering, moving, or demolishing a building or structure
building or altering a deck
finishing a basement, including non-structural work
adding an accessory building, equipment room, shed or detached garage
Not needed forCity page lists as not needing a permit: fencing, flooring, flower beds and boxes, painting, same-size door and window replacement, re-shingling, siding, trim, and sheds under 10 m² (108 ft²). The bylaw does not apply to retaining walls; clearing plumbing stoppages or repairing leaks needs no permit.Building and Renovating, Examples of when you do not need a permit; Building Regulation Bylaw 4287 (consolidated), s. 4.2 · Wording matched the official text retrieved 2026-11-06
Official wording
sheds under 10m2 (108 ft2)
replacing doors and windows of the same size
re-shingling or replacing roof cladding
This Bylaw does not apply to:
b. retaining walls.
No permit is required for the clearing of stoppages, or the repairing of leaks in pipes, valves or
How to applyFill out the application package for your type of work and email it to buildinginspection@dawsoncreek.ca. The bylaw requires a written application on the prescribed form filed with the building inspector.Building and Renovating, Permit Submission; Building Regulation Bylaw 4287 (consolidated), s. 5.1 · Wording matched the official text retrieved 2026-11-06
Official wording
Completed permit applications must be submitted by email to the appropriate department listed below.
Building and Demolition Permits: buildinginspection@dawsoncreek.ca
file an application in writing with the building inspector in the prescribed form
What to submitApplication signed by the owner or agent, stating the intended use, with two copies of specifications and two sets of scaled drawings including a site plan. The City has separate application packages (deck, shed, detached garage, secondary suite, single family dwelling and duplex, etc.).Building Regulation Bylaw 4287 (consolidated), s. 6.2; Residential Building Permits, Get started · Wording matched the official text retrieved 2026-11-06
Official wording
be signed by the Owner or Agent;
state the intended use or uses of the building or structure;
include two copies of the specifications and two sets of drawings to scale including:
a site plan showing the following information:
Deck Application Package
Detached Garage Application Package
Secondary Suite Application Package
Processing timeNo fixed time is given. It depends on the time of year and the size of the project; summer is busiest. The City recommends applying at least two weeks before you plan to start.Building and Renovating, Apply for a Permit · Wording matched the official text retrieved 2026-11-06
Official wording
The time it takes to get a permit depends on the time of year and how large the project is.
We recommend applying for a permit at least two weeks before you plan to start your project.
Summer months are the busiest time of year.
InspectionsBook by calling 250-743-6333 or emailing buildinginspection@dawsoncreek.ca. The owner must give at least 24 hours' notice. Inspections are done remotely by Zoom, Microsoft Teams or Google Meet.Building Inspections; Building Regulation Bylaw 4287 (consolidated), s. 14.2 · Wording matched the official text retrieved 2026-11-06
Official wording
To book an inspection, call 250-743-6333 or email buildinginspection@dawsoncreek.ca.
Remote inspections are carried out using Zoom, Microsoft Teams, or Google Meet.
at least 24 hours’ notice to the Building Inspector requesting an inspection
ContactDevelopment Services Department, building inspection: buildinginspection@dawsoncreek.ca; inspections 250-743-6333; City Hall 250-784-3600.Building and Renovating; Building Inspections · Wording matched the official text retrieved 2026-11-06
Official wording
The Development Services Department oversees building and renovating within the City of Dawson Creek.
City of Dawson Creek, BC V1G 4K6 Telephone: 250-784-3600
To book an inspection, call 250-743-6333
BylawBuilding Regulation Bylaw No. 4287, 2016Building Regulation Bylaw 4287 (consolidated), s. 1.1 · Wording matched the official text retrieved 2026-11-06
Official wording
BUILDING REGULATION BYLAW NO. 4287, 2016

How it works

Development Services oversees building in Dawson Creek. Section 6.1 of Building Regulation Bylaw 4287 says you must get a permit before excavating for, constructing, repairing, altering, moving or demolishing a building or structure, and before plumbing work. The City page also says projects must follow the current BC Building Code.

Steps

  1. Check the City's list. It names sheds, detached garages, decks, gazebos, secondary suites (new or legalized), finishing a basement, new buildings, additions and wood-burning appliances.
  2. Fill out the application package for your type of work, from the Residential Building Permits page.
  3. Email it to buildinginspection@dawsoncreek.ca.
  4. Pay the fees, get the permit, then book inspections as work proceeds.

Good to know

  • The City lists these as not needing a permit: fencing, flooring, flower beds and boxes, painting, same-size door and window replacement, re-shingling, siding, trim, and sheds under 10 m2 (108 ft2). The bylaw itself sets no shed size, so confirm with Building Inspection. Zoning rules still apply.
  • The bylaw does not apply to retaining walls. Clearing plumbing stoppages or repairing leaks needs no permit.
  • A permit expires if work does not start within 6 months, is not finished within 24 months, or stops for more than a year after the last inspection (Bylaw 4287, s. 7.2).
  • Not sure? Email Building Inspection before you start.

What you'll need

  • The application package for your type of work (deck, shed, detached garage, secondary suite, single family dwelling and duplex, and others)
  • Application signed by the owner or agent stating the intended use, two copies of specifications and two sets of scaled drawings including a site plan

Official forms and pages

The same question in other places

Pouce Coupe · Taylor · Fort St. John · Chetwynd · Tumbler Ridge · Hudson's Hope

Building permits in British Columbia: how to apply, by municipality →

Sources

  1. Building and Renovating, City of Dawson Creek (read 2026-11-05)
  2. Residential Building Permits, City of Dawson Creek (read 2026-11-05)
  3. Building Regulation Bylaw 4287 (consolidated) (read 2026-11-05)
  4. Building Inspections (read 2026-11-05)

Checked by script, not yet by a person: the official wording behind 8 of 8 facts was matched to the official text. How answers are checked.