Fernie building permits: when you need one and how to apply
Do I need a building permit, and how do I apply?
Usually yes. The City of Fernie requires a building permit to build, alter, repair, move or demolish a building or structure, change how a building is used, or install a wood-burning appliance or chimney. Applications are made online only, through the City's Cloudpermit portal.
Key facts
| Needed for | A permit is needed before constructing, repairing or altering a building or structure (including a pool), moving or demolishing one, changing its occupancy, or installing a wood-burning appliance, chimney or plumbing. Retaining walls 1.2 m or higher need one. The City also lists decks, finishing a basement and enclosing a carport.Building and Plumbing Bylaw No. 2526, 2025, s. 8.1; Building Permits and Inspections, Building Permit Requirements · Wording matched the official text retrieved 2026-11-06Official wordingconstructing, repairing or altering a building or structure, unless exempted by this bylaw or including a pool or retaining wall exceeding 1.2 metres in height; moving a building or structure into or within the boundaries of the City; demolishing a building or structure; changing the occupancy of a building; is greater than or equal to 1.2 meters in height without first obtaining a building permit. (e) constructing a masonry fireplace or installing a wood-burning appliance or chimney, A Building Permit is required when you plan to: construct a deck; enclose your carport or change your garage to living space; finish existing basement; |
|---|---|
| Not needed for | Per the Building and Plumbing Bylaw: fences, landscaping and retaining walls (except as Part 12 requires); an accessory building under 10 m² with no plumbing fixtures, sleeping or cooking facilities; an unenclosed deck or raised platform under 0.6 m above grade; and maintenance. The City web page adds that a shed must also be under 3.048 m (10 ft) tall, for storage, on residential land only.Sources differ: The bylaw sets no height limit or residential-zone condition for the shed exemption; the web page adds both. Bylaw wins. The web page also says a shed must meet zoning setbacks and parcel coverage, and a development permit may be needed in a Development Permit Area. Retaining walls 1.2 m or higher need a permit (s. 12.1).Building and Plumbing Bylaw No. 2526, 2025, s. 4.4; Building Permits and Inspections, Building Permit Exemptions · Wording matched the official text retrieved 2026-11-06Official wordingThis bylaw does not apply to fences and landscaping and retaining walls, excepting as set out in Part 12 of this bylaw; an accessory building or structure with a building area of less than 10 square metres that does not contain plumbing fixtures, sleeping or cooking facilities; An unenclosed deck or raised platform less than 0.6m above finished grade; and maintenance. A building permit is not required for detached accessory buildings (sheds) less than 10 m2 (107 sq ft) in building area and 3.048 m2 (10 ft) tall, when used for the purpose of storage on a residential zoned property only. |
| How to apply | Online only, through the City's Cloudpermit portal (register at ca.cloudpermit.com). Paper and emailed applications are not accepted. If a development permit is required, apply for that first.Apply with Cloudpermit, How to Submit a Permit Application; Building Permits and Inspections, Building Permit Application Process · Wording matched the official text retrieved 2026-11-06Official wordingBoth building & planning permit applications are no longer accepted in paper or by email and must be submitted through Cloudpermit. If a development permit is required for your project, you must apply for this permit first. To get started, register for a Cloudpermit account online: https://ca.cloudpermit.com/gov/login Starting June 4, 2025, building permit applications are accepted and issued online through Cloudpermit. |
| What to submit | The application form with the plan check fee, a land title search dated within 30 days, copies of covenants, rights of way and easements, any development permits, one set of scaled design drawings and a site plan. New homes also need an energy compliance report (Step 3), new home warranty registration and engineered truss and beam layouts. Requirements vary by project type.Required Documents for All Building Permit Applications and Renewals · Wording matched the official text retrieved 2026-11-06Official wordingCompleted Building Permit Application Form (and payment of Plan Check Fee, if applicable) Land Title Search (dated within 30 days of application submission) Copies of all covenants, right of ways, and easements registered on title. One set of design drawings, to scale, and suitable for construction * 9.39 Pre-Construction Energy Compliance Report from a Certified Energy Advisor – Step 3 required New Home Warranty Registration Form – refer to BC Housing |
| Processing time | Not confirmed. The City does not state a processing time. |
| Inspections | Book through Cloudpermit. Inspections are offered Tuesdays to Thursdays (not statutory holidays) and must be requested at least 2 days ahead; Building Officials confirm the time within 10 working days. For simple buildings the bylaw requires at least 2 business days' notice.Booking Inspections; Building Permits and Inspections, Arranging an Inspection; Building and Plumbing Bylaw No. 2526, 2025, s. 11.34 · Wording matched the official text retrieved 2026-11-06Official wordingCity of Fernie offers inspections on Tuesdays, Wednesdays and Thursdays (excluding Stat Holidays), and must be requested at least 2 days prior to schedule. Building Officials will contact the requestor within 10 working days to confirm the time. Inspections can be booked by logging into Cloudpermit and sending a request. For all work in respect of simple buildings the owner must give at least 2 business days notice to the City when requesting an inspection |
| Contact | City of Fernie Building Department (Building Officials): building@fernie.ca, phone 250-423-6817 (City Hall, 501 3rd Ave).Apply with Cloudpermit, How to Request an Inspection; Required Documents for All Building Permit Applications and Renewals, Page 1 · Wording matched the official text retrieved 2026-11-06Official wordingwe’ll get you set up online - building@fernie.ca Fernie, B.C. V0B 1M0 Phone: 250-423-6817 |
| Bylaw | Building and Plumbing Bylaw No. 2526, 2025Building and Plumbing Bylaw No. 2526, 2025, Title page and adoption; Building Permits and Inspections, Building Permit Application Process · Wording matched the official text retrieved 2026-11-06Official wordingBuilding and Plumbing Bylaw No. 2526 ADOPTED this 15th day of April, 2025. On April 15, 2025, Council adopted a new City of Fernie Building and Plumbing Bylaw. |
How it works
Under the Building and Plumbing Bylaw 2526, you need a permit before constructing, repairing or altering a building or structure (including a pool), moving or demolishing one, changing its occupancy, or installing a wood-burning appliance or chimney. A retaining wall 1.2 m or higher also needs one. The City's page also lists decks, finishing a basement and enclosing a carport. Plumbing-only work needs a separate plumbing permit.
Steps
- Find out whether your property is in a Development Permit Area. If it is, get the development permit first, and apply for it before the building permit.
- Register for a Cloudpermit account at ca.cloudpermit.com. Paper and emailed applications are not accepted.
- Gather the documents on the City's checklist. Requirements vary by project type.
- Submit the application in Cloudpermit with the plan check fee. The City emails an invoice within 2 business days.
- Book inspections through Cloudpermit. They are offered Tuesdays to Thursdays (not statutory holidays) and must be requested at least 2 days ahead. Building Officials confirm the time within 10 working days.
Good to know
- Each building needs its own permit application, such as a house and a detached garage.
- The City does not state a processing time. Check its weekly Permit Timelines page for the current queue.
- Permits issued before Cloudpermit launched: email building@fernie.ca to be set up online.
- Registered-professional letters of assurance and other items apply to some projects; see the checklist.
What you'll need
- Application form with the plan check fee
- Land title search dated within 30 days
- Copies of covenants, rights of way and easements, and any development permits
- One set of scaled design drawings and a site plan
- For new homes, an energy compliance report, new home warranty registration and engineered truss and beam layouts
Official forms and pages
The same question in other places
Sparwood · Cranbrook · Elkford · Kimberley · Canal Flats · Creston
Building permits in British Columbia: how to apply, by municipality →
Sources
- Building Permits and Inspections, City of Fernie (read 2026-11-05)
- Apply with Cloudpermit, City of Fernie (read 2026-11-05)
- Building and Plumbing Bylaw No. 2526, 2025 (PDF), City of Fernie (read 2026-11-05)
- Required Documents for All Building Permit Applications and Renewals (PDF), City of Fernie (read 2026-11-05)
- Booking Inspections (PDF), City of Fernie (read 2026-11-05)
- Permit Timelines, City of Fernie (read 2026-11-05)
Checked by script, not yet by a person: the official wording behind 7 of 8 facts was matched to the official text; 1 could not be confirmed. How answers are checked.