Short answer

In Golden a building permit costs $8 per $1,000 (or part) of construction value up to $100,000, then $6 per $1,000 above that, with a $40 minimum. Plumbing is $6 per fixture, minimum $25. Fees are in Schedule A of Building Regulation Bylaw No. 1299.

Key facts

Lowest fee$40 per permit application (minimum building permit fee).Building Regulation Bylaw No. 1299, 2012, Schedule A, item 1.3 · Wording matched the official text retrieved 2026-11-08
Official wording
1.3. A minimum fee of $40.00 per permit application; and
How the fee is worked out$8 per $1,000 (or part) of estimated construction value up to $100,000, then $6 per $1,000 (or part) above that; minimum $40. Starting work without a permit adds a charge: Schedule A says double the permit fee (up to $500), s. 12.6 says 25% of the fee (up to $500).Building Regulation Bylaw No. 1299, 2012, Schedule A, item 1 · Wording matched the official text retrieved 2026-11-08
Official wording
of the estimated construction value up to
1.2. $6.00 per $1,000.00 or part thereof thereafter,
Double the permit fee, for any work undertaken on a project without a valid permit or
1.1. $8.00 per $1000.00, or pafithereof of the estimated construction value up to
1.4. Double the permit fee, for any work undertaken on a project without a valid permit or
the person must pay an additional charge equal to twenty-five pelcent (25 %)
Application or plan review feeNone set. The Building Regulation Bylaw states no separate application or plan review fee.Read: Building Regulation Bylaw No. 1299, 2012
Other feesPlumbing $6 per fixture (minimum $25); demolition $50; moving a building $100; temporary building $100; re-inspection $50; permit renewal $50; solar or geothermal $25. Damage deposit $500 per single-family home (to $5,000). After-hours inspection $200 for the first 2 hours, then $100 per hour.Building Regulation Bylaw No. 1299, 2012, Schedule A · Wording matched the official text retrieved 2026-11-08
Official wording
fixture, with a minimum fee of $25.00.
4. Demolition: To demolish a building or structure, the fee shall be $50.00.
5. Moving: To move a building or structure, the fee shall be $100.00
8. Re-inspection: For the inspection of rejected work, the fee shall be $50.00
$500.00 for each Single Family Residence or for each residential unit in a
inspections outside normal office hours, the fee shall be $200 for the first
How to payThe permit fee must be paid in full before the permit is issued; re-inspection charges must be paid before further inspections.Building Regulation Bylaw No. 1299, 2012, s. 12.1, 12.4 · Wording matched the official text retrieved 2026-11-08
Official wording
calculated in accordance with Schedule A to this bylaw, must be paid in full prior to
a re-inspection charge as set out in Schedule A to this bylaw must be paid prior
BylawTown of Golden Building Regulation Bylaw No. 1299, 2012, Schedule A (Permit Fees)Building Regulation Bylaw No. 1299, 2012, s. 1; Building Regulation Bylaw No. 1299, 2012, s. 12.1 · Wording matched the official text retrieved 2026-11-08
Official wording
Town of Golden Building Regulation Bylaw No. 1299,2012
calculated in accordance with Schedule A to this bylaw, must be paid in full prior to

How it works

Fees are set in Schedule A of the Town's Building Regulation Bylaw No. 1299, 2012. The building permit fee is $8 per $1,000 (or part) of estimated construction value up to $100,000, then $6 per $1,000 (or part) above that. The minimum is $40 per permit application.

The bylaw states no separate application or plan-review fee.

Other fees in Schedule A: plumbing $6 per fixture (minimum $25); demolition $50; moving a building $100; temporary building $100; re-inspection $50; permit renewal $50; solar or geothermal $25; a damage deposit of $500 per single-family home (up to $5,000); and after-hours inspection $200 for the first 2 hours, then $100 per hour. Water turn-on, connection, meter deposit, landscaping security, parking payment in lieu and development cost charges may also apply.

Steps

  1. Estimate the construction value of your project.
  2. Apply to the Building Official (see the building-permit answer).
  3. The Town tells you the fee; pay it in full before the permit is issued.
  4. Pay any re-inspection charge before further inspections.

Good to know

  • Starting work without a permit adds a charge. Schedule A says double the permit fee (up to $500 extra), but s. 12.6 says 25% of the fee (up to $500). The two parts of the bylaw differ, so confirm with the Town.
  • A 5% reduction applies where letters of assurance are given (up to $500).
  • Building without a permit can also bring a $500 bylaw notice under the Town's Bylaw Notice Enforcement bylaw.
  • These fees come from the 2012 text as posted. No later fee schedule was found, so confirm the current amount with the Town.
  • Payment methods for permits are not stated in the bylaw.

Official forms and pages

The same question in other places

Revelstoke · Radium Hot Springs · Invermere · Nakusp · New Denver · Sicamous

Building permit fees in British Columbia, by municipality →

Sources

  1. Building Regulation Bylaw No. 1299, 2012 (PDF) (read 2026-11-08)
  2. Building and Demolition Permits, Town of Golden (read 2026-11-08)

Checked by script, not yet by a person: the official wording behind 5 of 6 facts was matched to the official text; 1 is recorded as not set. How answers are checked.