---
title: Grand Forks building permit fees
question: "How much does a building permit cost?"
place: Grand Forks, British Columbia, Canada
place_path: ca/bc/grand-forks
category: Building, renovating and your property
owner: municipal
owner_body: City of Grand Forks
sources_read: 2026-11-05
review: machine_checked
canonical: "https://govhandbook.com/ca/bc/grand-forks/building-permit-fees/"
json: "https://govhandbook.com/ca/bc/grand-forks/building-permit-fees.json"
---

# Grand Forks building permit fees

**Question:** How much does a building permit cost?

**Short answer:** In the City of Grand Forks, Building Bylaw 2070 sets the permit fee at 1.0% of construction value ($10 per $1,000) for residential, commercial, industrial and institutional work, and 0.7% for low-occupancy farm buildings. Some permits have flat fees. A $50 minimum applies to single inspections.

**Who handles it:** Municipal (City of Grand Forks, https://www.grandforks.ca)  
**Cost:** 1.0% of construction value (residential including garages, carports and patios, commercial, industrial, institutional); 0.7% for farm buildings; $50 minimum plus taxes for a single inspection or minor alteration or repair; flat fees for other types (see below).  
**How long:** Not applicable.  
**Where:**
- Phone: Building Inspection, City of Grand Forks, 250-442-8266
- Email: City of Grand Forks, info@grandforks.ca

## Key facts

- **Lowest fee:** $50 minimum plus applicable taxes for voluntary or other single inspections, including minor alterations or repairs. Other permit types have no stated minimum; they are 1.0% of construction value, or a flat fee.
  - Source: [Building Bylaw No. 2070, Appendix A, A(i)](https://www.grandforks.ca/wp-content/uploads/Bylaw2070Building-Bylaw.pdf)
  - Official wording: "Voluntary or other single" … "$50.00 minimum plus" … "alterations or repairs"
  - Check: wording matched the official text retrieved 2026-11-06
- **How the fee is worked out:** Residential (including garages, carports and patios) and commercial, industrial or institutional: 1.0% of construction value ($10 per $1,000). Farm buildings with low human occupancy: 0.7% ($7 per $1,000). Value of work is the greater of the Marshall Valuation figure or, for houses, row housing and duplexes, the Appendix B $ per ft2.
  - Source: [Building Bylaw No. 2070, Appendix A, A(a)-(c)](https://www.grandforks.ca/wp-content/uploads/Bylaw2070Building-Bylaw.pdf)
  - Official wording: "1.0% of construction value" … "0.7% of construction value" … "($7.00 per $1,000)" … "This Appendix applies to single family dwellings, row housing, semi-detached and duplex" … "(b) the values assigned in Appendix B."
  - Source: [Building Bylaw No. 2070, s. 1.2, 'value of the work'](https://www.grandforks.ca/wp-content/uploads/Bylaw2070Building-Bylaw.pdf)
  - Official wording: "(a) the value calculated using a method stipulated in the "Marshall Valuation" … "(b) the values assigned in Appendix B."
  - Check: wording matched the official text retrieved 2026-11-06
- **Application or plan review fee:** None set. Appendix A of the Building Bylaw lists no application fee.
- **Other fees:** Single-wide mobile or modular home site preparation $100, double-wide $200, each plus the construction value of new on-site work; temporary building $100; new wood-burning appliance or chimney $100; move a building $100 plus 1.0% of value; change of occupancy $100 plus 0.7%; re-inspection or off-hour inspection $100; permit renewal $100; remove notice on title $200. Security deposit: set by the CAO.
  - Source: [Building Bylaw No. 2070, Appendix A](https://www.grandforks.ca/wp-content/uploads/Bylaw2070Building-Bylaw.pdf)
  - Official wording: "Single-wide mobile or modular" … "(f) Temporary Buildings $100.00" … "New Wood Burning Appliances, or" … "Change of Occupancy $100.00 plus 0.7% of" … "Inspections or off-hour" … "Permit Renewal Fee $100.00" … "Administrative Charge to Remove $200.00" … "Plus construction values of new work on-site such as foundations, basements, additions and" … "(c) for a new single family dwelling or standard building: As determined by the CAO or"
  - Check: wording matched the official text retrieved 2026-11-06
- **How to pay:** The building permit fee must be paid before the permit is issued, together with any other City fees, charges, levies or taxes payable at that time. A security deposit is paid at the time of application.
  - Source: [Building Bylaw No. 2070, s. 10.7](https://www.grandforks.ca/wp-content/uploads/Bylaw2070Building-Bylaw.pdf)
  - Official wording: "10.7 Before receiving a building permit for a building or structure, the owner must first pay to" … "(a) the building permit fee prescribed in Appendix A; and"
  - Source: [Building Bylaw No. 2070, s. 10.8](https://www.grandforks.ca/wp-content/uploads/Bylaw2070Building-Bylaw.pdf)
  - Official wording: "10.8 An applicant for a building permit must pay to the City, at the time of the application, the"
  - Check: wording matched the official text retrieved 2026-11-06
- **Bylaw:** Building Bylaw No. 2070, Appendix A (Fees) and Appendix B (Value of Work)
  - Source: [Building Bylaw No. 2070, Appendix A](https://www.grandforks.ca/wp-content/uploads/Bylaw2070Building-Bylaw.pdf)
  - Official wording: "City of Grand Forks Building Bylaw No.2070" … "A. BUILDING PERMIT FEES"
  - Check: wording matched the official text retrieved 2026-11-06

## How it works

The fee is set in Appendix A of the City of Grand Forks [Building Bylaw 2070](https://www.grandforks.ca/wp-content/uploads/Bylaw2070Building-Bylaw.pdf). It is 1.0% of construction value ($10 per $1,000) for residential work (including garages, carports and patios) and for commercial, industrial or institutional work, and 0.7% ($7 per $1,000) for farm buildings with low human occupancy. The bylaw sets no minimum for these percentage fees.

The value of the work is the greater of the Marshall Valuation figure or, for houses, row housing, semi-detached homes and duplexes only, the Appendix B rate per square foot (as of January 1, 2021): first storey with full or partial basement $150, with no basement $120, each additional storey $100, attached garage $50, attached carport $30, accessory building over 10 m² $40, deck $25, covered deck $30, finishing a basement $50.

## Good to know

- $50 minimum plus taxes applies to voluntary or other single inspections, including minor alterations or repairs.
- Flat fees: single-wide mobile or modular home site preparation $100 and double-wide $200 (each plus the value of new on-site work); temporary building $100; new wood-burning appliance or chimney $100; moving a building $100 plus 1.0% of value; change of occupancy $100 plus 0.7%; re-inspection or off-hour inspection $100; permit renewal $100; removing a notice on title $200.
- The permit fee is paid before the permit is issued, along with any other City fees, charges or taxes then due. A security deposit, set by the Chief Administrative Officer, is paid when you apply.
- Starting construction before the permit is issued doubles the fee, up to $10,000.
- The fee is reduced by 10% (maximum $5,000) in some cases (Appendix A, part C).
- Refund: 75% of the fee if construction has not started, with no refund under $50, requested within 12 months.
- No application fee or plumbing fee is listed in Appendix A. Ask Building Inspection at 250-442-8266.

## Official forms and pages

- [Building Bylaw No. 2070, Appendix A Fees (PDF)](https://www.grandforks.ca/wp-content/uploads/Bylaw2070Building-Bylaw.pdf)

## Related questions

- [Grand Forks building permits: when you need one and how to apply](https://govhandbook.com/ca/bc/grand-forks/building-permit.md)
- [Grand Forks permits for decks, sheds, carports and garages](https://govhandbook.com/ca/bc/grand-forks/deck-shed-garage-permit.md)

## The same question elsewhere

- [Building permit fees in British Columbia, by municipality](https://govhandbook.com/ca/bc/building-permit-fees.md)
- [Midway](https://govhandbook.com/ca/bc/midway/building-permit-fees.md)
- [Rossland](https://govhandbook.com/ca/bc/rossland/building-permit-fees.md)
- [Warfield](https://govhandbook.com/ca/bc/warfield/building-permit-fees.md)
- [Trail](https://govhandbook.com/ca/bc/trail/building-permit-fees.md)
- [Montrose](https://govhandbook.com/ca/bc/montrose/building-permit-fees.md)
- [Castlegar](https://govhandbook.com/ca/bc/castlegar/building-permit-fees.md)

## Sources

- [Building Bylaw No. 2070 (PDF), City of Grand Forks](https://www.grandforks.ca/wp-content/uploads/Bylaw2070Building-Bylaw.pdf) (read 2026-11-05)
- [Building Inspections & Bylaw Services, City of Grand Forks](https://www.grandforks.ca/building-inspections/) (read 2026-11-05)

_Checked by script, not yet by a person: the official wording behind 5 of 6 facts was matched to the official text; 1 is recorded as not set. Gov Handbook is an independent guide, not affiliated with City of Grand Forks. How answers are checked: https://govhandbook.com/methods/ · Canonical page: https://govhandbook.com/ca/bc/grand-forks/building-permit-fees/_
