{"title":"I-1 zone in Hope: Heavy Industrial","code":"I-1","slug":"i-1","name":"Heavy Industrial","group":"Industrial","section":"12.1","site_specific_zone":false,"summary":"Industrial uses for primary processing, transport and manufacture of natural resource products, materials handling, and uses needing ample outdoor storage space and buffers.","fields":{"purpose":{"value":"Industrial uses for primary processing, transport and manufacture of natural resource products, materials handling, and uses needing ample outdoor storage space and buffers.","quotes":["The purpose of this zone is to accommodate industrial uses associated with the primary processing,","transport and manufacture of products from natural resource, materials handling, and those uses"]},"primary_uses":{"value":["Bulk oil, natural gas and fuel storage","Gravel and rock sorting, screening and crushing","Log booming, storage, sorting and debarking","Manufacture and storage of asphalt pavement and concrete products","Mineral processing","Municipal sewage treatment and disposal facility","Primary processing of forest products"],"quotes":["Bulk oil, natural gas and fuel storage","Gravel and rock sorting, screening and crushing","Log booming, storage, sorting and debarking","Manufacture and storage of asphalt pavement and concrete products","Mineral processing","Municipal sewage treatment and disposal facility","Primary processing of forest products"]},"secondary_uses":{"value":["Accessory buildings or structures","Office accessory to the operation of any of the principal uses permitted in this zone","One family residence","Outdoor storage"],"note":"Only 1 one family residence per parcel, located behind the principal use; an accessory office may be no more than 25% of the floor area of the principal uses.","quotes":["Accessory buildings or structures","Office accessory to the operation of any of the principal uses permitted in this zone","One family residence","Outdoor storage","There shall be no more than 1 one family residence on a parcel.","The one family residence shall be located behind the principal use.","An accessory office shall not exceed 25% of the floor area of the principal uses on the parcel."]},"min_parcel_area":{"value":"0.8 hectares (~2 acres) with community water and sewer; 2 hectares (~4.9 acres) with only one of the two; 4 hectares (~10 acres) with neither","quotes":["a) 0.8 hectares (~2 acres) where there is a community water system and a community sanitary","b) 2 hectares (~4.9 acres) where there is either a community water system or a community sanitary","c) 4 hectares (~10 acres) where there is neither a community water system nor community"]},"min_parcel_width":{"value":"10% of the parcel perimeter or 40 metres (~131 feet), whichever is greater","quotes":["The minimum frontage of a parcel shall be 10% of the perimeter of that parcel or 40 metres (~131","feet) whichever is greater."]},"max_parcel_coverage":{"value":"No maximum","quotes":["Maximum Site Coverage No maximum"]},"max_height":{"value":"15 metres (~49.5 feet)","quotes":["15 metres (~49.5 feet) 15 metres (~49.5 feet)"]},"max_height_accessory":{"value":"15 metres (~49.5 feet)","quotes":["15 metres (~49.5 feet) 15 metres (~49.5 feet)"]},"setback_front":{"value":"7.5 metres (~25 feet)","quotes":["Front Lot Line 7.5 metres (~25 feet) 7.5 metres (~25 feet)"]},"setback_rear":{"value":"7.5 metres (~25 feet)","quotes":["Rear Lot Line 7.5 metres (~25 feet) 7.5 metres (~25 feet)"]},"setback_side_interior":{"value":"7.5 metres (~25 feet)","quotes":["Interior Side Lot Line 7.5 metres (~25 feet) 7.5 metres (~25 feet)"]},"setback_side_exterior":{"value":"7.5 metres (~25 feet)","quotes":["7.5 metres (~25 feet) 7.5 metres (~25 feet)"]},"accessory_setbacks":{"value":"7.5 metres (~25 feet) from all lot lines","quotes":["Front Lot Line 7.5 metres (~25 feet) 7.5 metres (~25 feet)","Rear Lot Line 7.5 metres (~25 feet) 7.5 metres (~25 feet)","Interior Side Lot Line 7.5 metres (~25 feet) 7.5 metres (~25 feet)"]},"other":{"value":["Buildings next to a Residential or Commercial Zone must be at least 15 metres (~49.5 feet) from the boundary of the adjoining parcel","Bulk oil, natural gas and fuel storage must be approved by the Fire Commissioner"],"quotes":["buildings and structures in the I-1 Zone shall be setback a minimum of 15 metres (~49.5 feet) from","Bulk oil, natural gas and fuel storage shall be approved by the Fire Commissioner pursuant to the"]}},"bylaw":{"title":"Zoning Bylaw No. 1324, 2012 (consolidated to March 20, 2025)","url":"https://hope.ca/uploads/dm/86919/Zoning_Bylaw_No._1324_2012_Consolidated_March_20_2025","accessed":"2026-11-07","note":"The District's consolidation has no legislative sanction and is for convenience of reference only; the original bylaw and all amending bylaws must be consulted for interpreting and applying the law. The District says its Zoning Bylaw is being updated alongside the new OCP (Bylaw 1617, adopted February 9, 2026). An older consolidation (to July 1, 2024) also exists at hopebc.web.catalisgov.ca/uploads/dm/72314/Zoning_Bylaw.pdf."},"source_url":"https://hope.ca/uploads/dm/86919/Zoning_Bylaw_No._1324_2012_Consolidated_March_20_2025#page=88","place":{"path":"ca/bc/hope","name":"Hope","region":{"code":"bc","name":"British Columbia"},"country":{"code":"ca","name":"Canada"}},"urls":{"html":"https://govhandbook.com/ca/bc/hope/zoning/i-1/","markdown":"https://govhandbook.com/ca/bc/hope/zoning/i-1.md","json":"https://govhandbook.com/ca/bc/hope/zoning/i-1.json","index":"https://govhandbook.com/ca/bc/hope/zoning/index.json"}}