M2 zone in Houston: Heavy Industrial
In short
Heavy industrial and manufacturing uses not compatible with other land uses and requiring access to a major roadway.
Zone rules
| Purpose | Heavy industrial and manufacturing uses not compatible with other land uses and requiring access to a major roadway. |
|---|---|
| Main uses |
|
| Also allowed (secondary uses) |
|
| Minimum lot area | 1.0 ha |
| Maximum lot coverage | 60% |
| Maximum density | 1 dwelling unit |
| Maximum height | 15.0 m |
| Maximum height, accessory buildings | 12.0 m |
| Front setback | 15.0 m |
| Rear setback | 15.0 m |
| Interior side setback | 15.0 m |
| Street side setback | 15.0 m |
| Accessory building setbacks | front 15.0 m, interior side 15.0 m, exterior side 15.0 m, rear 15.0 m |
| Other rules |
|
Source: Zoning Bylaw No. 1225, 2026 (adopted October 6, 2026), s. 12.2 (read 2026-11-08)
Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. Schedule A of the bylaw is the text; Schedule B (the zoning map) is a separate PDF at https://houston.civicweb.net/document/149524. The document shows "Updated - N/A". Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.
This zone as Markdown · JSON · all Houston zones · Report an error