Invermere building permits: when you need one and how to apply
Do I need a building permit in Invermere, and how do I apply?
In Invermere you need a District building permit to construct, alter, repair or demolish a building or structure, and no stage of the work may start until it is issued. Accessory buildings under 10 m² are outside the Building Bylaw. Apply with the form, dropped off at 914 8th Avenue.
Key facts
| Needed for | A permit is needed to construct, alter, repair or demolish a building or structure, and no stage (including demolition or excavation) may start before it is issued. Building a retaining wall over 1.22 m or a swimming pool also needs a building permit.Building Services, Building Services page; Building Bylaw No. 1677, 2026, ss. 11.1, 14.1; definition of retaining wall · Wording matched the official text retrieved 2026-11-08Official wordingBuilding permits are required in order to construct, alter, repair or demolish a building or structure within the District of Invermere. You may not start any stage of a project, including demolition or excavation, until a building permit has been obtained. No person may construct, or structurally repair, a retaining wall without a building a person must not construct, or structurally repair, a swimming pool without a valid building permit retaining wall means a structure exceeding 1.22 metres in height that holds or retains soil |
|---|---|
| Not needed for | The Building Bylaw does not apply to: a fence (except retaining walls); an accessory building with a floor area under 10 m²; a trellis, arbour, wall holding soil under 1.22 m or similar landscape structure on a single-family parcel; and CSA Z240/Z241/A277 units except as the Building Code regulates them.Building Bylaw No. 1677, 2026, s. 3.3 · Wording matched the official text retrieved 2026-11-08Official wordingThis bylaw does not apply to except as set out in Part 11 [Retaining Walls] of this bylaw, a fence; an accessory building with a floor area of less than 10 square metres; a trellis, an arbour, a wall supporting soil that is less than 1.22 metres in height, or |
| How to apply | Complete the Building Permit Application Form and drop it off in person at 914 8th Avenue, Invermere. A plan check deposit is required at that time.Building Services, Building Services page · Wording matched the official text retrieved 2026-11-08Official wordingTo make an application please complete the Building Permit Application Form and drop it off in person to 914 8th Avenue, Invermere. A plan cheque deposit is required at that time. |
| What to submit | Signed application form, owner's acknowledgment (Appendix B), title search within 30 days, survey plan (may be waived), site plan and floor plans, in duplicate. The form also asks for a BC Energy Step Code pre-construction compliance report, and a development permit application if the site is in a development permit area.Building Bylaw No. 1677, 2026, ss. 10.2 and 10.4; Building Permit Application Form, Application form, page 3 'Documents to be included' · Wording matched the official text retrieved 2026-11-08Official wordingbe accompanied by the owner’s acknowledgment of responsibility and undertaking include a copy of a title search for the relevant property made within 30 days of the include a copy of a survey plan prepared by a British Columbia land surveyor except include a site plan showing include floor plans showing the dimensions and uses of all areas, including: the Title search. A copy of a title search, accompanied by referenced covenants, made within 30 days Plans, in duplicate, which include: Application for a development permit is also required |
| Processing time | Not confirmed. The official pages do not state this detail. |
| Inspections | Book by calling the District office at 250-342-9281. For simple buildings the owner must give at least 48 hours' notice and request each inspection in writing.Building Services, Building Services page; Building Bylaw No. 1677, 2026, ss. 10.32-10.33 · Wording matched the official text retrieved 2026-11-08Official wordingTo book an inspection, please contact the District of Invermere office at 250-342-9281. the owner must give at least 48 hours’ notice to the District of Invermere when requesting an inspection has requested the inspection in writing in accordance |
| Contact | Building Services: Manager of Building and Protective Services, 250-342-9281 ext. 1226, inspections@invermere.net; Building Official, 250-342-9281 ext. 1227, building@invermere.net.Building Services, Building Services page · Wording matched the official text retrieved 2026-11-08Official wordingManager of Building and Protective Services 250-342-9281 ext. 1226 inspections@invermere.net Building Official 250-342-9281 ext. 1227 building@invermere.net |
| Bylaw | Building Bylaw No. 1677, 2026Building Bylaw No. 1677, 2026, s. 1.1 · Wording matched the official text retrieved 2026-11-08Official wordingBuilding Bylaw No. 1677, 2026 |
How it works
The District of Invermere's building staff check your plans against the Building Bylaw No. 1677, 2026 and the BC Building Code. A permit is needed to construct, alter, repair or demolish a building or structure, and you may not start any stage, including demolition or excavation, before it is issued. A retaining wall over 1.22 m and a swimming pool also need a building permit.
The bylaw does not apply to a fence (except retaining walls), an accessory building under 10 m², a trellis, an arbour, a wall holding soil under 1.22 m or similar landscape structure on a single-family parcel. Being outside the bylaw does not exempt the work from zoning setbacks or heights.
Steps
- Call the Building Official (250-342-9281 ext. 1227) before you apply to confirm what your project needs.
- Fill in the Building Permit Application Form and gather the documents listed above.
- Drop the application off at 914 8th Avenue and pay the plan check deposit.
- Pay the permit fee before the permit is issued.
- To book an inspection, call 250-342-9281. For simple buildings give at least 48 hours' notice and request each inspection in writing.
Good to know
- If the site is in an Official Community Plan development permit area, a development permit is needed first.
- The bylaw lists the stages that must be inspected before work is covered (s. 10.32).
- The District's page and the bylaw do not say how building permit fees can be paid; ask the office.
What you'll need
- Signed Building Permit Application Form and owner's acknowledgment (Appendix B)
- Title search made within 30 days
- Survey plan (may be waived)
- Site plan and floor plans, in duplicate
- BC Energy Step Code pre-construction compliance report (the form asks for it)
- Development permit application, if the site is in a development permit area
- Letters of assurance from registered professionals, for complex buildings
Official forms and pages
The same question in other places
Radium Hot Springs · Canal Flats · Kaslo · Elkford · Kimberley · Cranbrook
Building permits in British Columbia: how to apply, by municipality →
Sources
- Building Services, District of Invermere (read 2026-11-08)
- Building Bylaw No. 1677, 2026 (PDF), District of Invermere (read 2026-11-08)
- Building Permit Application Form (PDF), District of Invermere (read 2026-11-08)
- Fees and Charges Amendment Bylaw No. 1687, 2026, Schedule G (PDF), District of Invermere (read 2026-11-08)
Checked by script, not yet by a person: the official wording behind 7 of 8 facts was matched to the official text; 1 could not be confirmed. How answers are checked.