Short answer

In Kitimat the building permit base fee is $40 for the first $1,000 of construction value, then $6 per $1,000 up to $100,000. A plan-processing fee also applies, from $35 to $250. Fence permits are $10; shed and deck permits are $40.

Key facts

Lowest feeFence permit $10; shed or deck permit $40; building permit base fee $40 for construction value up to $1,000, plus the plan-processing fee ($35 for a detached building under 10 m²).Kitimat Municipal Code, consolidated 2026-02, Part 13, Schedule A · Wording matched the official text retrieved 2026-11-06
Official wording
Fence or Security Fence $10.00
A Shed or Deck $40.00
Base Fee – up to $1000 $40.00
Detached Building <10m2 $35.00
How the fee is worked outBase fee $40 for the first $1,000 of construction value, then per $1,000 of value, accumulative: $6 from $1,001 to $100,000; $5.50 from $100,001 to $1,000,000; $5 from $1,000,001 to $2,000,000; $4 over $2,000,000.Kitimat Municipal Code, consolidated 2026-02, Part 13, Schedule A; Kitimat Municipal Code, consolidated 2026-02, s. 13.4.1.4; Kitimat Municipal Code, consolidated 2026-02, s. 13.4.1.5 · Wording matched the official text retrieved 2026-11-06
Official wording
Building Permit (per $1000 construction value accumulative)
Base Fee – up to $1000 $40.00
$1,001 to $100,000 $6.00
$100,001 to $1,000,000 $5.50
$1,000,001 to $2,000,000 $5.00
Over $2,000,000 $4.00
Standard buildings – 50% up to a maximum of $1000;
pay double the fees set out in Schedule A
Application or plan review feeA plan-processing fee is part of the building permit fee and is payable when the application is submitted; it is not refundable. Schedule A amounts: new standard building $150; new complex building $250; addition/renovation standard building $100, complex $200; detached building under 10 m² $35.Kitimat Municipal Code, consolidated 2026-02, s. 13.4.1.2; Kitimat Municipal Code, consolidated 2026-02, Schedule A · Wording matched the official text retrieved 2026-11-06
Official wording
The plan-processing component of the building permit fee is not refundable.
is payable when owner’s submit an application for a
New Standard Building $150.00
New Complex Building $250.00
Addition/Renovation Standard Building $100.00
Addition/Renovation Complex Building $200.00
Other feesPlumbing permit (min. $25): $10 for 5 fixtures, $4 each additional. Demolition $50. Solid fuel appliance $50. Re-inspection $50. Damage deposit: Schedule G form (Oct 2024) $500 under $25,000 construction value, $1,000 over, $5,000 commercial/industrial; Code Schedule A (2020) lists $1,000 standard, $5,000 complex.Sources differ: Schedule A also lists: demolition basic fee $50; solid fuel burning appliance basic fee $50; fire sprinkler permit $50 plus $.50 per sprinkler head; driveway and parking areas 65 m² or less $10; construction trailer $100 per unit with $1,000 deposit. A damage deposit is required where work over $10,000 involves excavation or construction abutting municipal property (s. 13.4.2.1). The application guide also mentions sewer and water hook-up and water turn-on fees (amounts not given there).Kitimat Municipal Code, consolidated 2026-02, Schedule A; Kitimat Municipal Code, consolidated 2026-02, s. 13.4.2.1; Schedule G Damage Deposit Form, October 2024, Schedule G Damage Deposit form, Standard Building Deposits · Wording matched the official text retrieved 2026-11-06
Official wording
Plumbing Permit (min. $25)
5 Fixtures $10.00
Each additional Fixture $4.00
Re-Inspection $50.00
New Standard Building $1,000.00
Complex Building $5,000.00
Demolition Permit (if required) $1,000.00
before the owner is issued a permit which proposes work of a value greater than $10,000
<$25,000 construction value = $500 deposit amount required
>$25,000 = $1,000 deposit amount required
Commercial/Industrial = $5,000 deposit amount required
How to payThe permit fee must be paid in full before the permit is issued; the plan-processing part is payable when the application is submitted.Kitimat Municipal Code, consolidated 2026-02, s. 13.4.1.1 and 13.4.1.2 · Wording matched the official text retrieved 2026-11-06
Official wording
shall be paid in full before issuance of any permit under this Part
is payable when owner’s submit an application for a
BylawKitimat Municipal Code, Part 13 - Building, Division 4 (Issuance of Permits and Permit Fees) and Schedule A - Fees & ChargesKitimat Municipal Code, consolidated 2026-02, Part 13 Div 4, Schedule A · Wording matched the official text retrieved 2026-11-06
Official wording
Subdivision 1 - Permit Fees 13.4.1. 1. Permit Fees Payable - in addition to applicable fees and charges that may be required under other Divisions, a permit fee, in the
Page 48 SCHEDULE A DISTRICT OF KITIMAT FEES AND CHARGES BUILDING INSPECTION DEPARTMENT Ph. 250-632-8900 Fax: 250-632-4995 Plan Processing
SCHEDULE A DISTRICT OF KITIMAT FEES AND CHARGES BUILDING INSPECTION DEPARTMENT Ph. 250-632-8900 Fax: 250-632-4995 Plan Processing Detached Building <10m2 $35.00

How it works

Building permit fees are in Division 4 and Schedule A (Fees and Charges) of Part 13 of the Kitimat Municipal Code. The base fee is $40 for construction value up to $1,000. Above that, the fee is charged per $1,000 of value, accumulative: $6 from $1,001 to $100,000; $5.50 from $100,001 to $1,000,000; $5 from $1,000,001 to $2,000,000; and $4 over $2,000,000.

A plan-processing fee is part of the permit fee. It is paid when you submit the application and is not refundable. Schedule A amounts: new standard building $150; new complex building $250; addition or renovation $100 (standard) or $200 (complex); detached building under 10 m² $35. A further plan-processing fee is payable if you amend or revise the application.

Steps

  1. Work out the construction value and building type.
  2. Ask the Building Inspection Department to confirm your fee (250-632-8900, Building@kitimat.ca).
  3. Pay the plan-processing fee when you apply.
  4. Pay the remainder in full before the permit is issued.

Good to know

  • Minimums: fence permit $10; shed or deck permit $40.
  • Plumbing permit (minimum $25): $10 for 5 fixtures, $4 for each additional. Demolition $50. Solid fuel appliance $50. Re-inspection $50.
  • Damage deposit: the Code's Schedule A (2020) lists $1,000 for a standard building and $5,000 for a complex one. The District's October 2024 Schedule G form lists $500 for construction under $25,000, $1,000 over that, and $5,000 for commercial or industrial. Confirm which applies to you.
  • A deposit is required where work over $10,000 involves excavation or construction abutting municipal property.
  • Fees are reduced when the permit relies on professional plan certification: 20% up to $1,000 for complex buildings and 50% up to $1,000 for standard buildings.
  • If work starts without a permit and a stop-work notice is issued, the Schedule A fees double.
  • Schedule A is dated 2020-03-17, so check with the Building Department that it is still current.
  • Payment methods are not stated in the documents we read.

Official forms and pages

The same question in other places

Terrace · Port Edward · Prince Rupert · Telkwa · Smithers · Houston

Building permit fees in British Columbia, by municipality →

Sources

  1. Kitimat Municipal Code, consolidated 2026-02 (PDF) (read 2026-11-06)
  2. Schedule G Damage Deposit Form, October 2024, District of Kitimat (PDF) (read 2026-11-06)

Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.