---
title: "P-5 zone in Lillooet: Resource Extraction"
place: Lillooet, British Columbia, Canada
place_path: ca/bc/lillooet
zone: P-5
bylaw: Zoning Bylaw No. 2025-026 (adopted January 20, 2026)
bylaw_read: 2026-11-08
review: draft
canonical: "https://govhandbook.com/ca/bc/lillooet/zoning/p-5/"
json: "https://govhandbook.com/ca/bc/lillooet/zoning/p-5.json"
---

# P-5 zone in Lillooet: Resource Extraction

Lands designated for the extraction and processing of natural resources such as sand, gravel and other aggregate, with extraction managed to minimize environmental and community impacts.

## Zone rules

- **Purpose:** Lands designated for the extraction and processing of natural resources such as sand, gravel and other aggregate, with extraction managed to minimize environmental and community impacts.
- **Main uses:** Sand and gravel mining; Topsoil removal; Forestry / logging; Associated processing operations such as screening, washing, and crushing; Temporary storage of extracted materials; Reclamation and rehabilitation activities; Utility Use and service installations necessary for extraction operations
- **Also allowed (secondary uses):** Accessory Buildings and Structures related to extraction operations; Access roads and weigh scales
- **Maximum lot coverage:** 5%
- **Maximum height:** 10.0 metres (any building or structure)
- **Front setback:** 4.5 metres
- **Rear setback:** 4.5 metres
- **Interior side setback:** 4.5 metres
- **Street side setback:** 4.5 metres

## Source

- [Zoning Bylaw No. 2025-026 (adopted January 20, 2026), s. 28.0](https://lillooet.civicweb.net/document/94551#page=98) (read 2026-11-08)

Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply. All zones in Lillooet: https://govhandbook.com/ca/bc/lillooet/zoning/index.json

_Draft: taken from the bylaw text by a research agent and not yet reviewed by a person. Gov Handbook is an independent guide. Canonical page: https://govhandbook.com/ca/bc/lillooet/zoning/p-5/_
