GovHandbook

M2 zone in Lytton: Heavy Industrial

Lytton, British ColumbiaDraft, not yet reviewedBylaw read 2026-11-08

In short

Main uses: All uses permitted in a M1 Zone, Cogeneration plant, Plants for ready-mix concrete and asphalt, Processing of aggregate materials extraction, Railyard and freight terminal, and 6 more.

Zone rules

Main uses
  • All uses permitted in a M1 Zone
  • Cogeneration plant
  • Plants for ready-mix concrete and asphalt
  • Processing of aggregate materials extraction
  • Railyard and freight terminal
  • Recycling of materials
  • Sawmill and associated landfill
  • Scales
  • Stockyard, slaughterhouse and packing house
  • Storage of logs, lumber, wood chips, sand, gravel, ore, concentrates, gas and
  • Wrecking yard
Also allowed (secondary uses)
  • Accessory buildings or structures
  • Dwelling units in combination with industrial uses
  • Restaurant
Minimum lot area1 ha (2.47ac)
Minimum lot width30m (98.4ft)
Maximum lot coverage40%
Maximum density1 single detached dwelling per lot
Maximum height7.2m (23.6ft) for buildings containing a dwelling unit
Front setback6m (19.7ft)
Rear setback6m (19.7ft); 0m (0ft) where the rear lot line abuts a railway
Interior side setback3m (9.8ft)
Street side setback6m (19.7ft)
Other rules
  • 30m (98.4ft) lot line setback where the lot abuts a R, C1, C2 or P Zone
  • Dwelling units only where clearly an integral part of the principal use; 10 metres (32.8ft) from any industrial use other than storage
  • Any use not inside a building or screened must be at least 20 metres (65.6ft) from any lot line
  • Screening (fence, wall, hedge or berm) required where the lot abuts a R, C1, C2 or P Zone

Source: Zoning Bylaw No. 484, 1998 (consolidated February 19, 2025), s. 12 (read 2026-11-08)

Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. The Village's consolidation is for convenience and reference purposes only. Sections 15 (CR-M) and 16 (CR-T) are not in Table 4-1 but are zone sections in the bylaw. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.

This zone as Markdown · JSON · all Lytton zones · Report an error