---
title: "M-4 zone in Maple Ridge: Extraction Industrial"
place: Maple Ridge, British Columbia, Canada
place_path: ca/bc/maple-ridge
zone: M-4
bylaw: Maple Ridge Zoning Bylaw No. 7600-2019 (consolidated to July 28, 2026)
bylaw_read: 2026-11-07
review: draft
canonical: "https://govhandbook.com/ca/bc/maple-ridge/zoning/m-4/"
json: "https://govhandbook.com/ca/bc/maple-ridge/zoning/m-4.json"
---

# M-4 zone in Maple Ridge: Extraction Industrial

High impact resource based industrial uses and primary processing of bulk goods generated on the lot.

## Zone rules

- **Purpose:** High impact resource based industrial uses and primary processing of bulk goods generated on the lot.
- **Main uses:** Extraction Industrial
- **Also allowed (secondary uses):** asphalt plant and product manufacturing, specific to the following Lot; Caretaker Residential; concrete plant and product manufacturing, specific to the following Lot; Industrial Repair Services; Office, provided that; Primary Processing
- **Extra uses on specific lots:** Asphalt plant and concrete plant: 13790 256 Street; Lot 1, District Lot 5326, Group 1 New Westminster District Plan LMP13975. PID: 018-603-785
- **Minimum lot area:** 2.0 hectares
- **Minimum lot width:** 60.0 m
- **Maximum lot coverage:** 10%
- **Maximum density:** No density requirement
- **Maximum height:** 15.0 m
- **Front setback:** 7.5 m
- **Rear setback:** 7.5 m
- **Interior side setback:** 7.5 m
- **Street side setback:** 7.5 m

## Source

- [Maple Ridge Zoning Bylaw No. 7600-2019 (consolidated to July 28, 2026), s. 804](https://www.mapleridge.ca/media/file/zoning-bylaw-7600-2019#page=255) (read 2026-11-07)

Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply. All zones in Maple Ridge: https://govhandbook.com/ca/bc/maple-ridge/zoning/index.json

_Draft: taken from the bylaw text by a research agent and not yet reviewed by a person. Gov Handbook is an independent guide. Canonical page: https://govhandbook.com/ca/bc/maple-ridge/zoning/m-4/_
