New Denver building permits: when you need one and how to apply

Do I need a building permit in New Denver, and how do I apply?

New Denver, British ColumbiaChecked against official textSources read 2026-11-09

Short answer

For construction or renovation in New Denver, start at the Village Office. Village staff and the regional district’s building official review the application. Check the Village building bylaw for exemptions before starting work.

Key facts

Needed forNew buildings, alterations, reconstruction, demolition, moving buildings and changes of occupancy fall under the Village building bylaw. New solid-fuel appliances and chimneys are also covered.Consolidated Building Bylaw No. 595, Section 5.1, scope and exemptions · Wording matched the official text retrieved 2026-11-09
Official wording
5.1.2 the design, construction and occupancy of new buildings and structures, and the alteration, reconstruction, demolition, removal, relocation, occupancy and change of occupancy of existing buildings and structures; 5.1.3 the installation of a new or used solid fuel burning appliance, certified by a recognized agency; 5.1.4 a newly installed new metal chimney certified by a recognized agency; 5.1.5 a newly constructed masonry chimney.
Not needed forThe Village exempts buildings or structures under 9.33 m² and unroofed decks no higher than 600 mm above grade. Retaining structures under 1.5 m are also exempt under this bylaw.Consolidated Building Bylaw No. 595, Section 5.2.2–5.2.4, local exemptions · Wording matched the official text retrieved 2026-11-09
Official wording
5.2 This Bylaw does not apply to 5.2.1 buildings or structures exempted by Part 1 of the Building Code except as expressly provided herein; 5.2.2 buildings or structures less than 9.33 square meters (100 sq. ft.). 5.2.3 retaining structures less than 1.5 meters (5 ft.) in height; 5.2.4 decks without roofs having a difference in elevation to grade not exceeding 600 millimeters (2 ft.);
How to applyGet the form from the Village Office and submit it there. The owner may apply or appoint a representative in writing. The appointed representative must sign the application.New Denver Building Permit Guide, Obtaining a building permit · Wording matched the official text retrieved 2026-11-09
Official wording
OBTAINING A BUILDING PERMIT Applications for a Building Permit can be made by the legal owner of a property. If you as the owner wish to appoint a representative or agent to act on your behalf with respect to a construction project, you must complete and sign an Owner’s Representative form (available from the Village Office). The appointed owner’s representative must also sign the building permit application form. 2If your project requires a building permit, you are required to do the following:  Complete the Building Permit application form (copies available at the Village Office);  Submit the following information to the Village Office: TITLE SEARCH A current copy of your Title Search is required, dated within 30 days of the date of application and a copy of any and all covenants. The Village of New Denver can obtain
What to submitFor a standard building, include the owner-signed application and undertaking, a title search no more than 30 days old with referenced covenants, the intended use and a site plan. Check the other plan requirements for the project with the regional district.Consolidated Building Bylaw No. 595, Section 10.1, standard buildings · Wording matched the official text retrieved 2026-11-09
Official wording
10.1 An application for a building permit with respect to a standard building must 10.1.1 be made on the form provided by the Village and signed by the owner making the application, or a signing officer if the owner is a corporation; 10.1.2 be accompanied by the owner’s acknowledgment of responsibility and undertakings made in the form provided by the Village, signed by the owner, or a signing officer if the owner is a corporation; 10.1.3 include a copy of a title search, accompanied by referenced covenants, made within 30 days of the date of the application; 10.1.4 state the intended use of the building; 10.1.5 include a site plan showing 10.1.5.1 the bearing and dimensions of the parcel taken from the registered subdivision plan; 10.1.5.2 the legal description and civic address of the parcel; 10.1.5.3 the location and dimensions of all statutory rights of way, easements and setback requirements when required by the
Processing timeThe Village estimates 6–8 weeks for application review and approval. Incomplete forms or missing information can delay the decision.New Denver Building Permit Guide, Approval process · Wording matched the official text retrieved 2026-11-09
Official wording
4APPROVAL PROCESS Once your completed application and information is submitted, your application will be reviewed by Village staff and the Building Official and the permit fee will be calculated. Please note: the application review and approval process may take 6 to 8 weeks. You will be notified once your building permit is approved. Your application may be rejected or its approval delayed if the form is incomplete or there is missing information.
InspectionsCall the Village Office at least 72 hours before the requested inspection. Give the permit number, site address, owner’s name and inspection type.New Denver Building Permit Guide, Building inspections, stages and appointment booking · Wording matched the official text retrieved 2026-11-09
Official wording
BUILDING INSPECTIONS ‐ STAGES Building inspections are required by the Building Official at the following stages of construction for Single-Family Dwellings, Multiple Residential buildings; Commercial, Industrial and Institutional buildings; and for Additions to any of the above. When you are ready for an inspection please call the Village Office to book an appointment. Please give at least 72 hours prior notice of the date upon which an inspection is requested. Permit number, building site address, owner’s name and type of inspection required must be quoted when requesting inspections.
ContactSubmit through the Village Office, 115 Slocan Avenue, office@newdenver.ca. The Village guide lists the regional building official’s Nakusp office at 250-265-4111.New Denver Building Permit Guide, Contact information and application requirements · Wording matched the official text retrieved 2026-11-09
Official wording
CONTACT INFORMATION RDCK Building Official: Dan Siminoff Email: dsiminoff@rdck.bc.ca Phone (Nakusp Office): 250‐265‐4111 New Denver Office Hours: Thursdays Mail:  PO Box 40 (115 Slocan Avenue), New Denver, BC V0G 1S0 Email:  office@newdenver.ca
2If your project requires a building permit, you are required to do the following:  Complete the Building Permit application form (copies available at the Village Office);  Submit the following information to the Village Office: TITLE SEARCH A current copy of your Title Search is required, dated within 30 days of the date of
BylawVillage of New Denver Building Bylaw No. 595, as amended.Consolidated Building Bylaw No. 595, Building Bylaw No. 595, sections 5.1–5.2 · Wording matched the official text retrieved 2026-11-09
Official wording
THE CORPORATION OF THE VILLAGE OF NEW DENVER BYLAW NO. 595 & Amendments thereto A bylaw to regulate building in the Village of New Denver
5.1.2 the design, construction and occupancy of new buildings and structures, and the alteration, reconstruction, demolition, removal, relocation, occupancy and change of occupancy of existing buildings and structures; 5.1.3 the installation of a new or used solid fuel burning appliance, certified by a recognized agency; 5.1.4 a newly installed new metal chimney certified by a recognized agency; 5.1.5 a newly constructed masonry chimney. 5.2 This Bylaw does not apply to 5.2.1 buildings or structures exempted by Part 1 of the Building Code except as expressly provided herein; 5.2.2 buildings or structures less than 9.33 square meters (100 sq. ft.). 5.2.3 retaining structures less than 1.5 meters (5 ft.) in height; 5.2.4 decks without roofs having a difference in elevation to grade not exceeding 600 millimeters (2 ft.);

How it works

Describe the work in terms of what will change. An addition, an alteration inside an existing building and a change in how a space is used can raise different permitting questions at the same address. Get the form from the Village Office and submit it there. The owner may apply or appoint a representative in writing. The appointed representative must sign the application.

Steps

  1. Use the application guidance in New Denver Building Permit Guide (PDF). List the work planned for each part of the building. Identify existing construction and what you propose to add, remove or enclose.
  2. Check the application instructions for that type of project. Ask which drawings, approvals and inspection stages apply before scheduling work that would conceal it.
  3. For a standard building, include the owner-signed application and undertaking, a title search no more than 30 days old with referenced covenants, the intended use and a site plan. Check the other plan requirements for the project with the regional district.

Good to know

  • Call the Village Office at least 72 hours before the requested inspection. Give the permit number, site address, owner’s name and inspection type.
  • The Village estimates 6–8 weeks for application review and approval. Incomplete forms or missing information can delay the decision.
  • Submit through the Village Office, 115 Slocan Avenue, office@newdenver.ca. The Village guide lists the regional building official’s Nakusp office at 250-265-4111.
  • Keep a copy of the plans you submitted. If the scope changes, describe the change to the permit office before relying on the original instructions.
  • Read the applicable provisions in Consolidated Building Bylaw No. 595 (PDF).

What you'll need

  • For a standard building, include the owner-signed application and undertaking, a title search no more than 30 days old with referenced covenants, the intended use and a site plan. Check the other plan requirements for the project with the regional district.

Official forms and pages

The same question in other places

Silverton · Slocan · Kaslo · Nakusp · Nelson · Castlegar

Building permits in British Columbia: how to apply, by municipality →

Sources

  1. New Denver Building Permit Guide (PDF) (read 2026-11-09)
  2. Consolidated Building Bylaw No. 595 (PDF) (read 2026-11-09)
  3. Village forms, New Denver (read 2026-11-09)

Checked by script, not yet by a person: the official wording behind 8 of 8 facts was matched to the official text. How answers are checked.