GovHandbook

District of North Vancouver building permit fees

How much does a building permit cost in the District of North Vancouver?

District of North Vancouver, British ColumbiaChecked against official textSources read 2026-11-06

Short answer

In the District of North Vancouver (not the City), a building permit costs $99.80 for the first $1,000 of work value, then $20.30 per $1,000 up to $15,000, $17.60 from $15,000 to $50,000 and $16.00 above $50,000. Half is paid at application and the rest before the permit is issued.

Key facts

Lowest fee$99.80, for the first $1,000 of the value of the work.Fees and Charges Bylaw 6481, Schedule B, Building Permit Fee · Wording matched the official text retrieved 2026-11-06
Official wording
First $1,000 value of the work $99.80
How the fee is worked out$99.80 for the first $1,000 of work value; then $20.30 per $1,000 (or part) up to $15,000; $17.60 per $1,000 from $15,000 to $50,000; $16.00 per $1,000 above $50,000. The fee increases if construction starts before the permit is issued.Fees and Charges Bylaw 6481, Schedule B, Building Permit Fee; Construction Bylaw 8271, 2017, s. 4.9 · Wording matched the official text retrieved 2026-11-06
Official wording
Each $1,000 or part thereof by which the value of work exceeds the sum of $1,000 up to a maximum of $15,000, add $20.30
exceeds the sum of $15,000 up to a maximum of $50,000, add $17.60
exceeds the sum of $50,000, add $16.00
The Building Permit Fee is increased where construction commenced before the Building Inspector issued a permit by:
The Building Permit Fee will increase as prescribed in the Fees and Charges Bylaw 6481
Application or plan review feeNo separate application fee found. Half (50%) of the total fees is paid when the application is made and the balance before the permit is issued. Revision fees: $127 per hour, with minimums for second and later revisions. Preliminary plan review: $127 per hour, two-hour minimum.Construction Bylaw 8271, 2017, s. 16.1; Fees and Charges Bylaw 6481, Schedule B, Revision Fees · Wording matched the official text retrieved 2026-11-06
Official wording
50% of the total applicable fees must be paid at the time of the building permit
the full balance of the total applicable fees must be paid prior to issuance of the
Revision from the time of application submission to permit
Preliminary Plan Review
Other feesRe-inspection (each inspection over two): $165.50. Green demolition permit: $290.80. Permit transfer, single-family: $99.80. Security deposit (single-family): $2,500 or 1% of work value (max $5,000) for additions and renovations; $10,000 or 1% (max $20,000) for a new house or demolition.Fees and Charges Bylaw 6481, Schedule B; Construction Bylaw 8271, 2017, s. 5.7.1, 5.7.2 · Wording matched the official text retrieved 2026-11-06
Official wording
Green Demolition Permit Fee $290.80
Single Family Residential Building $99.80
For each inspection exceeding two in number where a re-
$10,000 or 1.0 percent of the value of the work, whichever is greater, to a maximum
$2,500 or 1.0 percent of the value of the work, whichever is greater, to a maximum
How to pay50% of the fees at application, the balance before the permit is issued. The owner or agent pays any outstanding fees to collect the permit. Payment methods are not stated in the PDFs read.Construction Bylaw 8271, 2017, s. 16.1; Building permit guide, Pick up your permit · Wording matched the official text retrieved 2026-11-06
Official wording
50% of the total applicable fees must be paid at the time of the building permit
To collect your building permit, the owner or owner
BylawFees and Charges Bylaw 6481, Schedule B (Development and Permitting Fees); consolidation includes Bylaw 8777, February 2, 2026Fees and Charges Bylaw 6481, cover and Schedule B · Wording matched the official text retrieved 2026-11-06
Official wording
FEES AND CHARGES BYLAW
DEVELOPMENT AND PERMITTING FEES
Bylaw 8777 February 2, 2026

How it works

Fees are set in Schedule B (Development and Permitting Fees) of the Fees and Charges Bylaw 6481. The building permit fee is based on the estimated value of the work:

  • $99.80 for the first $1,000.
  • Then $20.30 per $1,000 (or part) up to $15,000.
  • $17.60 per $1,000 from $15,000 to $50,000.
  • $16.00 per $1,000 above $50,000.

The fee increases if construction starts before the permit is issued: $408.70 for work up to $15,000, rising to $16,449 for work over $1,000,000.

Steps

  1. Work out the estimated value of the work for the application form.
  2. Pay 50% of the total fees when you apply. Under the Construction Bylaw, the balance is paid before the permit is issued.
  3. Pay the security deposit (single-family): $2,500 or 1% of the work value (maximum $5,000) for additions and renovations; $10,000 or 1% (maximum $20,000) for a new house or demolition.

Good to know

  • No separate application fee was found. The 50% at application is part of the permit fee, not an extra charge.
  • Other fees: re-inspection (each inspection over two) $165.50; green demolition permit $290.80; permit transfer, single-family, $99.80.
  • Revision fees are $127 per hour, with minimums for second and later revisions. A preliminary plan review is $127 per hour, with a two-hour minimum.
  • The permit fee is reduced by 2.5% (maximum $500) where letters of assurance are relied on.
  • Plumbing, electrical, gas and heating permits have their own fee schedules in the same bylaw.
  • Payment methods are not stated in the documents we read. Call the Building Department on 604-990-2480.

Official forms and pages

The same question in other places

North Vancouver · Belcarra · West Vancouver · Port Moody · Vancouver · Burnaby

Building permit fees in British Columbia, by municipality →

Sources

  1. Fees and Charges Bylaw 6481 (PDF) (read 2026-11-06)
  2. Construction Bylaw 8271, 2017 (PDF) (read 2026-11-06)
  3. Building permit guide (PDF) (read 2026-11-06)

Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.