GovHandbook

CS2 zone in Oliver: Service Commercial Two

Oliver, British ColumbiaDraft, not yet reviewedBylaw read 2026-11-07

In short

Service commercial areas that include services for industrial and retail sales auxiliary to the permitted uses.

Zone rules

PurposeService commercial areas that include services for industrial and retail sales auxiliary to the permitted uses.
Main uses
  • Construction services
  • Food and beverage processing
  • Manufacturing (provided the use is entirely contained within a building)
  • Service industry establishment, minor
  • Veterinary clinic
  • Wholesale store, warehouses and freight terminals
Also allowed (secondary uses)
  • Dwelling Unit
  • Retail Sales
  • Accessory Buildings or Structures
Extra uses on specific lotsLot A, Plan KAP21469, District Lot 2450S, SDYD (5801 Sawmill Road): also abattoirs, car and truck wash, and service industry establishment, major (including a septic service operation with drying ponds up to 200.0 m²); offices as an accessory use
Minimum lot area1.0 ha (not on municipal sewer); 0.1 ha (on municipal sewer), for subdivision
Minimum lot width30.0 m (for subdivision)
Maximum lot coverage40%
Maximum densityOne dwelling unit per parcel; floor area ratio not applicable
Maximum height15.0 m
Maximum height, accessory buildings7.0 m
Front setback10.0 m
Rear setback15.0 m
Interior side setback15.0 m
Street side setback10.0 m
Accessory building setbacksfront 10.0 m, rear 3.0 m, interior side 3.0 m, exterior side 4.5 m
Other rules
  • Dwelling units must be at least 30.0 m²
  • Dwelling units may be no larger than 125.0 m² or 25% of the gross floor area of all buildings on the parcel, whichever is less

Source: Town of Oliver Zoning Bylaw 1423 (adopted June 24, 2024), s. 14.5 (read 2026-11-07)

Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. This is the Town's bylaw library copy (Laserfiche portal, DocView id 36093). The text carries only the 2024 adoption dates and no consolidation notice, so later amendments may not be included. Schedule B (zoning map) and Schedule C (floodplain map) are separate documents. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.

This zone as Markdown · JSON · all Oliver zones · Report an error