Port Alice building permits: when you need one and how to apply
Do I need a building permit in Port Alice, and how do I apply?
In Port Alice you need a building permit to build a new building, add to or renovate one, build a deck or pool, or change plumbing. Apply at the Village office on the Application for Building or Plumbing Permit form. The 2021 guide says about 21 days is normally maintained.
Key facts
| Needed for | A building permit is needed to construct any new building or accessory building, locate a temporary building, alter, renovate or repair an existing building, finish an unfinished area, demolish or relocate a building, locate a manufactured home, build or remodel a deck, build a swimming pool, install or alter plumbing, connect to sewer, storm drain or water, install a chimney, fireplace or wood stove, change a building's occupancy type, or install an irrigation system or on-site water collection.Residential Building Permit Guide 2021, Villages of Port Hardy, Port McNeill, Port Alice and Coal Harbour, p. 2, What work requires a building permit? · Wording matched the official text retrieved 2026-11-08Official wordingYou will need a building permit when you wish to: construct any new building construct a new accessory building remodel or construct a deck construct a swimming pool change the occupancy type of a building install an irrigation or sprinkler system |
|---|---|
| Not needed for | Non-structural or minor work: installing cupboards, painting, roofing repairs or replacement with no structural change, landscaping or sidewalks, fences, and a storage shed under 10 m² (such as a pump-house) as long as it is sited correctly.Residential Building Permit Guide 2021, Villages of Port Hardy, Port McNeill, Port Alice and Coal Harbour, p. 2, What work does not require a building permit? · Wording matched the official text retrieved 2026-11-08Official wordingNon-structural or minor modifications do not require a permit, including: installing cupboards landscaping or sidewalks constructing a storage shed less than 10 m2 in size |
| How to apply | Apply to the Village of Port Alice office (1061 Marine Drive, 8:30 a.m. to 4:30 p.m., Monday to Friday) using the Application for Building or Plumbing Permit form. Permits are issued only when the property is correctly zoned for the use, registered at the Land Title Office, accessible, and the plans, application and fees are complete.Residential Building Permit Guide 2021, Villages of Port Hardy, Port McNeill, Port Alice and Coal Harbour, p. 3, How do I obtain a building permit?; Planning, Planning page · Wording matched the official text retrieved 2026-11-08Official wordingApply to the municipal office in the jurisdiction where your property is correctly zoned for your intended 8:30 am to 4:30 pm, Monday to Friday Port Alice Building Permit Application |
| What to submit | The completed application signed by the owner or agent, plus plans to scale: for a house, site plan, foundation plan, floor plan, cross section and all elevations. Other items may be needed: property assessment notice and title search, survey certificate for new homes, and engineered drawings for manufactured products.Residential Building Permit Guide 2021, Villages of Port Hardy, Port McNeill, Port Alice and Coal Harbour, p. 4-5 · Wording matched the official text retrieved 2026-11-08Official wordingSite Plan Foundation Plan All Elevations (all sides of the buildings) A survey certificate will be required for new homes. A copy of the current Property Assessment Notice and Title Search. |
| Processing time | About 21 days is normally maintained, per the guide.Residential Building Permit Guide 2021, Villages of Port Hardy, Port McNeill, Port Alice and Coal Harbour, p. 5 · Wording matched the official text retrieved 2026-11-08Official wordingapproximately 21 days for applications is normally |
| Inspections | Request an inspection by phoning the Village office; requests generally must be received 48 hours in advance. Have your contact name and phone, address, type of inspection, permit number and requested day ready.Residential Building Permit Guide 2021, Villages of Port Hardy, Port McNeill, Port Alice and Coal Harbour, p. 9, How do I obtain inspections? · Wording matched the official text retrieved 2026-11-08Official wordingA telephone call to your local government office is required requests for inspections must be received 48 hours in advance |
| Contact | Village of Port Alice office, 250-284-3391, info@portalice.ca.Contact, Contact page · Wording matched the official text retrieved 2026-11-08Official wordingPort Alice, BC. V0N 2N0 Contact Us P: (250) 284-3391 F: (250) 284-3416 info@portalice.ca Get in Touch Today! P: (250) 284-3391 F: (250) 284-3416 info@portalice.ca Get in Touch Today! Our team will get back to you as soon as possible. |
| Bylaw | Village of Port Alice Building Bylaw No. 610, 2010 (per the Planning page)Sources differ: CONFLICT-ish: the library lists a Bylaw for the Administration and Enforcement of the Building Code as No. 560 (scanned), and the building permit application is file-named 560, while the Planning page names Bylaw No. 610, 2010. Which is current could not be confirmed. Neither bylaw text is readable.Planning, Planning page; Bylaws library, Bylaws library page · Wording matched the official text retrieved 2026-11-08Official wordingVillage’s Building Bylaw No 610, 2010 Bylaw for the Administration and Enforcement of the Building Code |
How it works
The Village of Port Alice issues building permits. The Village's 2021 Residential Building Permit Guide (shared with Port Hardy, Port McNeill and Coal Harbour) says it does not replace current bylaws. A permit is needed to:
- construct any new building or accessory building, or locate a temporary building
- alter, renovate or repair an existing building, or finish an unfinished area
- demolish or relocate a building, or locate a manufactured home
- build or remodel a deck, or build a swimming pool
- install or alter plumbing, connect to sewer, storm drain or water, or install a chimney, fireplace or wood stove
- change a building's occupancy type, or install an irrigation system or on-site water collection
No permit is needed for non-structural work such as cupboards, painting, roofing repairs with no structural change, landscaping, sidewalks, fences, or a storage shed under 10 m² (such as a pump-house) that is sited correctly. Exempt work must still meet the BC Building Code, zoning and other rules.
Steps
- Check that the property is correctly zoned for your use (see zoning-lookup).
- Fill in the Application for Building or Plumbing Permit and sign it as owner or agent.
- Attach plans to scale. For a house: site plan, foundation plan, floor plan, cross section and all elevations (the guide asks for two sets). You may also need a property assessment notice and title search, a survey certificate for a new home, and engineered drawings for manufactured products.
- Submit at the Village office, 1061 Marine Drive, with the fees.
- To book an inspection, phone the Village office, generally 48 hours ahead. Have your name, phone, address, type of inspection, permit number and requested day ready.
Good to know
- Permits are issued only when the property is correctly zoned, registered at the Land Title Office and accessible, and the plans, application and fees are complete.
- The Planning page names Building Bylaw No. 610, 2010, but the Bylaws library lists the Building Code administration bylaw as No. 560. Confirm with the Village which one applies.
Official forms and pages
The same question in other places
Port Hardy · Port McNeill · Alert Bay · Tahsis · Sayward · Gold River
Building permits in British Columbia: how to apply, by municipality →
Sources
- Residential Building Permit Guide 2021 (PDF), Villages of Port Hardy, Port McNeill, Port Alice and Coal Harbour (read 2026-11-08)
- Application for Building or Plumbing Permit (PDF), Village of Port Alice (read 2026-11-08)
- Planning, Village of Port Alice (read 2026-11-08)
- Contact, Village of Port Alice (read 2026-11-08)
- Bylaws library, Village of Port Alice (read 2026-11-08)
- Rates and Fees Bylaw No. 695-2025 (PDF), Village of Port Alice (read 2026-11-08)