M3 zone in Port Edward: Heavy Industrial
Main uses: Asphalt Manufacturing and Processing, Auction Sales, Automobile Wrecking Yard, Concrete Mixing, Contractor, Trade, and 9 more.
Zone rules
| Main uses |
|
|---|---|
| Also allowed (secondary uses) |
|
| Minimum lot area | 1 hectare |
| Minimum lot width | 60 m |
| Maximum lot coverage | 60% of the Lot Area |
| Maximum height | 60 m |
| Front setback | 10 m |
| Rear setback | 10 m |
| Interior side setback | 3 m |
| Accessory building setbacks | front 10 m, rear 3 m, side 3 m |
| Other rules | Automobile wrecking yards and junk yards must be at least 30 metres from abutting R or RM lots |
Source: District of Port Edward Zoning Bylaw No. 713, 2020 (consolidated, file dated 2023), s. Part 5 (read 2026-11-08)
Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. The District says its web copies are provided as-is and the certified copy at the District office is the only valid one. Zones in Part 5 are not numbered; the zone maps are Schedule B (District) and Schedule C (Townsite). PRPA land use is under federal jurisdiction. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.
This zone as Markdown · JSON · all Port Edward zones · Report an error