P-1 zone in Port Hardy: Parks and Open Space
Main uses: Activities Directed at Protecting and / or Enhancing the Natural Environment, Boat Launch, Campground, Cemetery, Fish Hatchery and Enhancement Works, and 6 more.
Zone rules
| Main uses |
|
|---|---|
| Also allowed (secondary uses) |
|
| Minimum lot area | Not applicable |
| Minimum lot width | Not applicable |
| Maximum lot coverage | 50% |
| Maximum height | 10.0 m (principal and accessory buildings and structures) |
| Maximum height, accessory buildings | 10.0 m (principal and accessory buildings and structures) |
| Front setback | 7.0 m |
| Rear setback | 7.0 m |
| Interior side setback | 3.0 m |
| Street side setback | 5.0 m |
| Accessory building setbacks | front 7.0 m, rear 3.0 m, interior side 1.5 m, exterior side 5.0 m |
| Other rules |
|
Source: Zoning Bylaw No. 1010-2013 (consolidated for convenience, December 2025), s. 10.1 (read 2026-11-08)
Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. The document is headed "Consolidated for Convenience". A draft Zoning Amendment Bylaw No. 1192-2026 is posted on the District's documents page but is not part of the consolidation. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.
This zone as Markdown · JSON · all Port Hardy zones · Report an error