GovHandbook

R-3 zone in Port Hardy: Mobile Home Residential

Port Hardy, British ColumbiaDraft, not yet reviewedBylaw read 2026-11-08

In short

Main uses: Mobile Home Dwelling, Mobile Home Park.

Zone rules

Main uses
  • Mobile Home Dwelling
  • Mobile Home Park
Also allowed (secondary uses)
  • Accessory Buildings and Structures
  • Minor Home Occupation
  • Major Home Occupation (only on a parcel in a subdivision where each Manufactured Home Dwelling is on its own parcel)
  • Single Detached Dwelling for the operator / manager of a Manufactured Home Park
  • Small Scale Urban Agriculture
  • Urban Hens (only on a parcel in a subdivision where each Manufactured Home Dwelling is on its own parcel)
  • Short Term Vacation Rental
Minimum lot area300.0 m² (Mobile Home Dwelling); 1.0 hectare (Mobile Home Park)
Minimum lot width10.0 m (Mobile Home Dwelling); 30.0 m (Mobile Home Park)
Maximum lot coverage40%
Maximum densityMobile Home Park: maximum 20 Mobile Home Dwellings per hectare; otherwise one Manufactured Home Dwelling per parcel
Maximum height5.0 m
Front setback4.5 m
Rear setback4.5 m
Interior side setback1.8 m
Street side setback3.0 m
Accessory building setbacksfront 4.5 m, rear 1.0 m, interior side 1.0 m, exterior side 3.0 m
Other rules
  • One Single Detached Dwelling (manager) allowed for a minimum of 10 Mobile Home Dwellings in a Manufactured Home Park
  • Every Mobile Home Dwelling must be on a foundation and fully skirted to match its exterior finish
  • Minimum gross floor area of the principal building: 67.8 m²
  • Minimum building width: 4.2 m; minimum parcel depth: 20.0 m (Mobile Home Dwelling), 30.0 m (Mobile Home Park)

Source: Zoning Bylaw No. 1010-2013 (consolidated for convenience, December 2025), s. 6.4 (read 2026-11-08)

Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. The document is headed "Consolidated for Convenience". A draft Zoning Amendment Bylaw No. 1192-2026 is posted on the District's documents page but is not part of the consolidation. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.

This zone as Markdown · JSON · all Port Hardy zones · Report an error