Do I need a permit for a deck, shed, carport, or garage in Qualicum Beach?
In Qualicum Beach you need a building permit for a deck (unless it is uncovered and not more than 0.5 m above grade), a new accessory building such as a shed over 10 m², and a new garage or carport. Zoning limits on size and setbacks apply to every accessory building.
Key facts
| Sheds | A building permit is needed for a new accessory building (shed) greater than 10 m². The Town's FAQ does not list sheds of 10 m² or less as needing one.Building Applications and Resources, Building Permit FAQ · Wording matched the official text retrieved 2026-11-06Official wordingConstruct a new accessory building (greater than 10 m²) |
|---|---|
| Decks | A building permit is needed to remodel or construct a deck. The Building Bylaw does not apply to uncovered decks not more than 0.5 m above finished grade with no walls or roof. The Town has a Guide for Building a Deck.Building Applications and Resources, Building Permit FAQ; Building Bylaw No. 903, 2024, s. 3.3(b); Guide for Building a Deck · Wording matched the official text retrieved 2026-11-06Official wordingRemodel or construct a deck uncovered decks, steps, landings, ramps and patios not more than 0.5 GUIDE FOR BUILDING A DECK |
| Garages and carports | A building permit is needed to construct any new building or structure, and to enclose a carport or change a garage to living space. A garage is not named separately as exempt.Building Applications and Resources, Building Permit FAQ · Wording matched the official text retrieved 2026-11-06Official wordingConstruct any new building or structure Enclose your carport or change your garage to living space |
| Zoning limits | In R1 and R2 zones: accessory buildings total up to 75 m², height 4.5 m, parcel coverage 55%. An accessory building of 10 m² or less and 3 m or less in height may sit at 0 m from rear and interior side lot lines; other accessory buildings are 4.0 m from an exterior side lot line. In rural zones A1 to A3, accessory buildings total up to 200 m², parcel coverage 20%, 7.5 m from other lot lines.Zoning Bylaw No. 900, 2024 (Combined Version), s. 3.4.111 (R1), s. 3.4.112 (R2), s. 3.4.11 (A1) · Wording matched the official text retrieved 2026-11-06Official wordingAccessory buildings - combined floor area of 75m2 Accessory Building 4.5m Parcel coverage 55% Interior side lot line 1.5m Accessory Building 4.0m Accessory Buildings Combined floor area 200m2 Parcel Coverage 20% |
| Bylaw | Town of Qualicum Beach Building Bylaw No. 903, 2024; Zoning Bylaw No. 900, 2024Building Applications and Resources, Building Resources; Zoning Bylaw No. 900, 2024 (Combined Version), title · Wording matched the official text retrieved 2026-11-06Official wordingBuilding Bylaw No. 903, 2024 Town of Qualicum Beach Zoning Bylaw No. 900, |
How it works
Qualicum Beach requires a building permit under the Building Bylaw No. 903, 2024 for these:
- Deck: a permit is needed to build or remodel a deck. The bylaw does not apply to uncovered decks not more than 0.5 m above finished grade with no walls or roof. The Town has a Guide for Building a Deck.
- Shed: a permit is needed for a new accessory building greater than 10 m². The Town's FAQ does not list sheds of 10 m² or less as needing one.
- Garage or carport: a permit is needed for any new building or structure, and to enclose a carport or change a garage to living space. The Town gives no size threshold for garages and carports.
Zoning also applies, even where no building permit is needed. In the R1 and R2 zones under the Zoning Bylaw No. 900, 2024: accessory buildings total up to 75 m², height 4.5 m, parcel coverage 55%. An accessory building of 10 m² or less and 3 m or less in height may sit at 0 m from rear and interior side lot lines; other accessory buildings are 4.0 m from an exterior side lot line. In rural zones A1 to A3: up to 200 m², parcel coverage 20%, 7.5 m from other lot lines. Other zones differ.
Steps
- Find your zone and check the limits above (see zoning-lookup).
- If a permit is needed, follow the steps in building-permit.
- If you are unsure whether your shed, deck or garage needs one, call Building Inspection before you build.
Good to know
- Work cannot start until the permit is issued.
- A fence is a separate question; see fence-rules.
Official forms and pages
The same question in other places
Parksville · Lantzville · Port Alberni · Nanaimo · Sechelt · Comox
Deck and shed permit thresholds in British Columbia, by municipality →
Sources
- Building Applications and Resources, Town of Qualicum Beach (read 2026-11-06)
- Building Bylaw No. 903, 2024 (PDF), Town of Qualicum Beach (read 2026-11-06)
- Guide for Building a Deck (PDF), Town of Qualicum Beach (read 2026-11-06)
- Zoning Bylaw No. 900, 2024 (Combined Version) (PDF), Town of Qualicum Beach (read 2026-11-06)
Checked by script, not yet by a person: the official wording behind 5 of 5 facts was matched to the official text. How answers are checked.