Radium Hot Springs permits for decks, sheds, carports and garages
Do I need a permit for a deck, shed, carport, or garage in Radium Hot Springs?
In Radium Hot Springs, the Village's Building Permit Guide says you need a building permit for a new shed, garage or carport over 10 m² (108 sq. ft.), and to construct, cover or enclose a deck or porch. A garden shed under 108 sq. ft. is exempt. Zoning rules still apply.
Key facts
| Sheds | Per the Village's Building Permit Guide, a permit is required for a new accessory building or structure over 10 m² (108 sq. ft.); a garden shed under 108 sq. ft. is listed as exempt. Zoning rules and the wildfire development permit area still apply.Building Permits; Fees and Charges Bylaw No. 530, 2026, Schedule B, Valuation Schedule; Building Permit Guide, When do you need a building permit? · Wording matched the official text retrieved 2026-11-08Official wordingNew construction of buildings or structures Decks/Sheds $538.20/ sq. m. ($50.00/ sq. ft.) Construct a new accessory building or accessory structure greater than 108 sq. ft. (10m2). Garden shed less than 108 sq. ft. (10m2). |
|---|---|
| Decks | Per the Village's Building Permit Guide, a permit is required to construct, cover or enclose a porch or sundeck; no height threshold is stated. For zoning, decks and porches under 0.6 m high are left out of parcel coverage.Building Permits; Fees and Charges Bylaw No. 530, 2026, Schedule B, Valuation Schedule; Zoning Bylaw No. 528, 2026, s. 3.6.1; Building Permit Guide, When do you need a building permit? · Wording matched the official text retrieved 2026-11-08Official wordingChanges, alterations, reconstruction or additions to existing buildings or structures Decks/Sheds $538.20/ sq. m. ($50.00/ sq. ft.) Decks and porches under 0.6 m in height; Construct, cover or enclose a porch or sundeck. |
| Garages and carports | A garage or carport is an accessory building: the Village's Building Permit Guide requires a permit for a new one over 10 m² (108 sq. ft.), and for completing an unfinished area such as a carport. Fee valuation: garages $861.11/m², carports $538.20/m².Building Permits; Fees and Charges Bylaw No. 530, 2026, Schedule B, Valuation Schedule; Building Permit Guide, When do you need a building permit? · Wording matched the official text retrieved 2026-11-08Official wordingNew construction of buildings or structures Garages/Shops $861.11/ sq. m. ($80.00/ sq. ft.) Carports $538.20/ sq. m. ($50.00/ sq. ft.) Construct a new accessory building or accessory structure greater than 108 sq. ft. (10m2). Complete a previously unfinished area in an existing building (basement development, carport, etc.). |
| Zoning limits | In the R2 and R3 zones an accessory building may be no taller than 6.0 m, no bigger than 80% of the principal building, and must sit at least 1.5 m from the rear and internal side lines (3.5 m external side in R2, 3.0 m in R3) and no closer to the front line than the house. Total structures: 40% of the parcel (R2) or 45% (R3). An accessory building may not contain a dwelling unit unless the bylaw allows it.Zoning Bylaw No. 528, 2026, s. 6.7.8, 6.7.5, 6.7.9 (R2); Zoning Bylaw No. 528, 2026, s. 6.8.5, 6.8.9 (R3); Zoning Bylaw No. 528, 2026, s. 3.3.1 · Wording matched the official text retrieved 2026-11-08Official wordingc) Maximum height of an Accessory Building or Structure 6.0 m b) Maximum Parcel Coverage of Accessory Building or Structure(s) No more than 80% of Principal Building d) External Side Parcel Line 3.0 m 3.5 m a) Maximum Parcel Coverage for all Structures 40% a) Maximum Parcel Coverage for all Structures 45% d) External Side Parcel Line 3.0 m 3.0 m No Accessory Building or Structure shall contain a Dwelling Unit, except as |
| Bylaw | Village of Radium Hot Springs Building and Plumbing Bylaw No. 392, 2013 (building permits) and Zoning Bylaw No. 528, 2026 (siting, height, coverage).Building and Plumbing Bylaw No. 392, 2013, s. 1; Zoning Bylaw No. 528, 2026, s. 1.1.1 · Wording matched the official text retrieved 2026-11-08Official wordingBuilding and Plumbing Bylaw No. 392, 2013 Village of Radium Hot Springs Zoning Bylaw No. 528, 2026 |
How it works
The Village's Building Permit Guide says a building permit is required for a new accessory building or structure over 10 m² (108 sq. ft.), and that a garden shed under 108 sq. ft. is exempt. A permit is also required to construct, cover or enclose a porch or sundeck; no height threshold is stated. For a garage or carport, the Guide requires a permit for a new one over 10 m², and for completing an unfinished area such as a carport. Zoning rules and the wildfire development permit area still apply.
Zoning limits are in the Zoning Bylaw No. 528. In the R2 and R3 zones an accessory building:
- may be no taller than 6.0 m and no bigger than 80% of the principal building;
- must sit at least 1.5 m from the rear and internal side lines (3.5 m from an external side line in R2, 3.0 m in R3);
- may be no closer to the front line than the house;
- may not contain a dwelling unit unless the bylaw allows it.
Total structures may cover 40% of the parcel in R2 or 45% in R3. Decks and porches under 0.6 m high are left out of parcel coverage.
Steps
- Check your zone and the limits above. See the zoning-lookup answer.
- Ask Building and Development Services whether your size and design need a permit.
- If needed, apply as described in the building-permit answer.
- Heat pumps may not sit in a required setback.
Good to know
- The Village's page and bylaws do not set a size or height threshold beyond the Guide's 10 m² line; Building and Development Services can confirm for your project.
- Other zones have their own limits. See the zone sections of the zoning bylaw.
- All Village land is in the wildfire development permit area under the Official Community Plan. Ask whether it affects your build.
Official forms and pages
The same question in other places
Invermere · Canal Flats · Golden · Kaslo · Elkford · Kimberley
Deck and shed permit thresholds in British Columbia, by municipality →
Sources
- Building Permits, Village of Radium Hot Springs (read 2026-11-08)
- Building Permit Guide, Village of Radium Hot Springs (PDF) (read 2026-11-08)
- Fees and Charges Bylaw No. 530, 2026 (PDF) (read 2026-11-08)
- Zoning Bylaw No. 528, 2026 (PDF) (read 2026-11-08)
- Building and Plumbing Bylaw No. 392, 2013 (PDF) (read 2026-11-08)
- Building and Development Services, Village of Radium Hot Springs (read 2026-11-08)
Checked by script, not yet by a person: the official wording behind 5 of 5 facts was matched to the official text. How answers are checked.