---
title: "I.5 zone in Spallumcheen: Soil Removal and Processing Zone"
place: Spallumcheen, British Columbia, Canada
place_path: ca/bc/spallumcheen
zone: I.5
bylaw: Zoning Bylaw No. 1700, 2008 (consolidated with amendments for convenience only, through Bylaw No. 2192, 2026)
bylaw_read: 2026-11-07
review: draft
canonical: "https://govhandbook.com/ca/bc/spallumcheen/zoning/i-5/"
json: "https://govhandbook.com/ca/bc/spallumcheen/zoning/i-5.json"
---

# I.5 zone in Spallumcheen: Soil Removal and Processing Zone

Main uses: Accessory buildings and structures, Manufacturing, processing, finishing, and storage of concrete products or ready mix concrete, rock, sand, and gravel, and stone products (or others of like character or kind), Manufacturing, processing, and storage of asphalt paving and roofing materials, Retail sale of products manufactured or processed on site, Silviculture, and 1 more.

## Zone rules

- **Main uses:** Accessory buildings and structures; Manufacturing, processing, finishing, and storage of concrete products or ready mix concrete, rock, sand, and gravel, and stone products (or others of like character or kind); Manufacturing, processing, and storage of asphalt paving and roofing materials; Retail sale of products manufactured or processed on site; Silviculture; Soil extraction (Only these uses are permitted.)
- **Minimum lot area:** 0.5 ha for manufacturing, processing and storage on parcels connected to a community sewer system; 1.0 ha for the same uses without community sewer; 4 ha for soil extraction
- **Minimum lot width:** 45 m for manufacturing, processing, finishing and storage uses; soil extraction uses a frontage set in a general section of the bylaw
- **Maximum lot coverage:** 65% of the lot area for all buildings and structures
- **Maximum height:** 18 m
- **Front setback:** 15 m
- **Rear setback:** 8 m
- **Interior side setback:** 6 m
- **Street side setback:** 15 m where applicable
- **Other rules:** Depth and horizontal limits of soil extraction areas are set by Council; The minimum lot sizes for manufacturing, processing and storage apply only once all soil has been removed as allowed; Impermeable catch basins required for all fuel and chemical storage and equipment servicing areas; Storage yards or areas not permitted in a front yard

## Source

- [Zoning Bylaw No. 1700, 2008 (consolidated with amendments for convenience only, through Bylaw No. 2192, 2026), s. 604](https://spallumcheen.civicweb.net/document/34972#page=74) (read 2026-11-07)

Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply. All zones in Spallumcheen: https://govhandbook.com/ca/bc/spallumcheen/zoning/index.json

_Draft: taken from the bylaw text by a research agent and not yet reviewed by a person. Gov Handbook is an independent guide. Canonical page: https://govhandbook.com/ca/bc/spallumcheen/zoning/i-5/_
