Taylor permits for decks, sheds, carports and garages
Do I need a permit for a deck, shed, carport, or garage in Taylor?
In Taylor, a building or structure of 15 m² or less in building area needs no building permit if it follows all bylaws; a larger one does. Garages, carports and decks are not named in the bylaw, so the same 15 m² rule applies. Zoning limits still apply.
Key facts
| Sheds | No building permit for a building or structure of 15 m² or less in building area, if it follows all bylaws; a larger one needs a permit. Zoning limits (location, size, height) still apply.District of Taylor Building Bylaw No. 391, 1991, s. 5.1.2(a) · Wording matched the official text retrieved 2026-11-08Official wordinga building or structure which does not exceed 15 square metres in building area; |
|---|---|
| Decks | The Building Bylaw does not name decks or give a height threshold. The general rule applies: a permit is needed for a building or structure over 15 m² in building area.District of Taylor Building Bylaw No. 391, 1991, ss. 2.2, 5.1.2(a) · Wording matched the official text retrieved 2026-11-08Official wordingNo person shall construct or authorize the construction of any building or structure or part thereof unless a permit for the work has first been issued by the Building Inspector. a building or structure which does not exceed 15 square metres in building area; |
| Garages and carports | Garages and carports are not named in the Building Bylaw; the general rule applies (permit needed over 15 m² in building area). Under zoning, an accessory building attached to the house is treated as part of the house.District of Taylor Building Bylaw No. 391, 1991, s. 5.1.2(a); Zoning Bylaw No. 898, 2025, Second Reading Version, s. 4.7.9 · Wording matched the official text retrieved 2026-11-08Official wordinga building or structure which does not exceed 15 square metres in building area; Where an accessory building or structure is attached to the principal building, it will be considered part of the principal building |
| Zoning limits | Accessory buildings: not in a front yard; detached ones 1.5 m or more from the house. R-1 to R-4: at most 90 m² and 7.0 m high; side setback 1.5 m (exterior side 3.0 m), rear 2.0 m; site coverage 50% (R-1, R-4), 60% (R-2), 70% (R-3). A-1 and A-2: 20% parcel coverage; accessory height 7.0 m (A-1), 9.0 m (A-2).Zoning Bylaw No. 898, 2025, Second Reading Version, ss. 4.3.1(iv), 4.7, 11.3 (Table 10) · Wording matched the official text retrieved 2026-11-08Official wordingNo accessory building or structure shall be located in the front yard. accessory building or structure must be setback a minimum of 1.5 m from the principal building. Maximum size of accessory buildings or structures 90 m2 Maximum height of accessory buildings and structures 7.0 m d. rear parcel line 2.0 m provided that such projections do not extend more than 1.5 m or 50% of the width of a required front, side or rear yard, whichever is less. Maximum site coverage 70% Maximum parcel coverage 20% |
| Bylaw | Building Bylaw No. 391, 1991; Zoning Bylaw No. 898, 2025District of Taylor Building Bylaw No. 391, 1991, title page; Zoning Bylaw No. 898, 2025, Second Reading Version, title · Wording matched the official text retrieved 2026-11-08Official wordingBUILDING BYLAW NO. 391, 1991 District of Taylor – Zoning Bylaw No. 898, 2025 |
How it works
The Building Bylaw No. 391, 1991 has no separate rule for sheds, decks, garages or carports. The general rule applies: no permit for a building or structure of 15 m² or less in building area, if it complies with all bylaws; a larger one needs a permit from the Building Inspector. The bylaw does not name decks or set a height threshold, so ask the District about a deck under 15 m².
Zoning limits still apply even when no permit is needed. Under the Zoning Bylaw, an accessory building attached to the house is treated as part of the house.
Steps
- Measure the building area and check it against 15 m².
- Check the zoning limits below for your zone.
- If a permit is needed, see the building-permit answer.
Good to know
- Accessory buildings may not be in a front yard. A detached one must be 1.5 m or more from the house.
- In R-1 to R-4 zones: at most 90 m² and 7.0 m high; side setback 1.5 m (3.0 m on the exterior side), rear 2.0 m. Site coverage is 50% in R-1 and R-4, 60% in R-2 and 70% in R-3.
- In A-1 and A-2 zones: 20% parcel coverage; accessory building height 7.0 m (A-1) or 9.0 m (A-2).
- The Zoning Bylaw text we could read is an unsigned draft version. Confirm with the District Office at 250-789-3392.
Official forms and pages
The same question in other places
Fort St. John · Dawson Creek · Pouce Coupe · Chetwynd · Hudson's Hope · Tumbler Ridge
Deck and shed permit thresholds in British Columbia, by municipality →
Sources
- District of Taylor Building Bylaw No. 391, 1991 (PDF) (read 2026-11-08)
- Zoning Bylaw No. 898, 2025, Second Reading Version (PDF), District of Taylor document centre (read 2026-11-08)
- Contact, District of Taylor (read 2026-11-08)
Checked by script, not yet by a person: the official wording behind 5 of 5 facts was matched to the official text. How answers are checked.