GovHandbook

Ashcroft building permit fees

How much does a building permit cost?

Ashcroft, British ColumbiaChecked against official textSources read 2026-11-08

Short answer

In Ashcroft the building permit fee is $50 for the first $1,000 of construction value, plus $9 for each additional $1,000 up to $400,000, plus $6 for each $1,000 above that. A $500 or $1,500 surcharge is added, and a $200 application fee counts toward the permit fee.

Key facts

Lowest fee$50 for construction value of $1 to $1,000. A non-refundable application fee of $200 (or the calculated permit fee, if less) is paid with the application and counts toward the permit fee. A surcharge of $500 applies where value is under $50,000.Village of Ashcroft Building Regulations Bylaw 793, 2014, Appendix A (PDF, consolidated to May 23, 2023), Appendix A, B, C, E · Wording matched the official text retrieved 2026-11-08
Official wording
(a) $1 to $1,000; $50
A non-refundable permit application fee of $200 or the calculated building permit fee, whichever is less, shall be charged for all permits.
(a) $500 where the construction value is less than $50,000; or
How the fee is worked out$50 for the first $1,000 of construction value, plus $9 for each additional $1,000 (or part) up to $400,000, plus $6 for each $1,000 (or part) above $400,000. A surcharge of $500 (value under $50,000) or $1,500 (over $50,000) is added, rebated if the permit is closed within two years with no damage to Village property.Village of Ashcroft Building Regulations Bylaw 793, 2014, Appendix A (PDF, consolidated to May 23, 2023), Appendix A, A and C · Wording matched the official text retrieved 2026-11-08
Official wording
or the value of construction as determined by the Building Official on the basis of plans, specifications and information available to him or her, whatever value shall be greater.
(a) $1 to $1,000; $50
$50 plus for each $1,000 or part thereof by which the value exceeds $1,000 up to a maximum of $400,000 as additional fees; and $9
each additional $1,000 or part thereof by which the value exceeds $400,000 as additional fees $6
(a) $500 where the construction value is less than $50,000; or
(b) $1500 where the construction value exceeds $50,000; and
Application or plan review fee$200, or the calculated building permit fee if that is less. Non-refundable; it is part of (not on top of) the building permit fee. If the permit is not issued and paid for within six months of notice that it is ready, the application is cancelled and the fee forfeited.Village of Ashcroft Building Regulations Bylaw 793, 2014, Appendix A (PDF, consolidated to May 23, 2023), Appendix A, B; s. 17.2 · Wording matched the official text retrieved 2026-11-08
Official wording
The building permit fee shall include this non-refundable application fee.
application shall be cancelled and the permit application fee forfeited if the permit has not been issued and the permit fee paid within six months
Other feesPlumbing: $75 minimum (or first fixture), $10 each additional fixture. Demolition permit $50. Re-inspection $50. Special inspection $150. Provisional occupancy certificate $100 per 90 days. Permit renewal $200. Temporary building up to 2 years $400. Starting work before a permit: double the fee, up to an additional $2,000.Village of Ashcroft Building Regulations Bylaw 793, 2014, Appendix A (PDF, consolidated to May 23, 2023), Appendix A, D, F, H, I, J, L, M, N, O · Wording matched the official text retrieved 2026-11-08
Official wording
Minimum fee for any plumbing permit or first fixture $75
The fee for a permit to demolish a building. $50
the fee for each subsequent inspection shall be $50.
The fee for a renewal permit shall be $200 each renewal period of one year.
The fee for a provisional occupancy certificate shall be $100 for each issuance period of 90 days.
double the fee prescribed in this Schedule, up to an additional $2,000.
How to payThe application fee is paid with the application; the full permit fee must be paid before the permit is issued. The pages read do not say which payment methods the Village office accepts.Village of Ashcroft Building Regulations Bylaw 793, 2014, Appendix A (PDF, consolidated to May 23, 2023), s. 17.1, 17.2, 6.8(b) · Wording matched the official text retrieved 2026-11-08
Official wording
shall be paid in full prior to issuance of any permit under this bylaw.
The application fee as set out in Appendix "A" shall accompany an application made for a building
the prescribed permit fee as detailed in Appendix "A" attached to this bylaw has been paid;
BylawVillage of Ashcroft Building Regulations Bylaw 793, 2014, Appendix "A": Schedule of Permit Fees.Village of Ashcroft Building Regulations Bylaw 793, 2014, Appendix A (PDF, consolidated to May 23, 2023), title and s. 1.1; Village of Ashcroft Building Regulations Bylaw 793, 2014, Appendix A (PDF, consolidated to May 23, 2023) · Wording matched the official text retrieved 2026-11-08
Official wording
The bylaw may be cited for all purposes as the "Village of Ashcroft Building Regulations Bylaw 793, 2014."
Consolidated to May 23, 2023
APPENDIX "A": SCHEDULE OF PERMIT FEES

How it works

Fees are set in Appendix A of the Village's Building Regulations Bylaw 793. The permit fee is based on the value of construction, or the value the Building Official determines from the plans, whichever is greater.

  • $1 to $1,000: $50.
  • Above $1,000: $50 plus $9 for each $1,000 or part by which the value exceeds $1,000, up to $400,000.
  • Above $400,000: $6 for each additional $1,000 or part.
  • Surcharge: $500 where the construction value is under $50,000, or $1,500 where it is over $50,000. It is rebated if the permit is closed within two years with no damage to Village property.

Steps

  1. Pay the non-refundable application fee of $200 (or the calculated permit fee, if less) with your application. It is part of the permit fee, not an extra charge.
  2. Pay the full permit fee before the permit is issued.
  3. If the permit is not issued and paid for within six months of notice that it is ready, the application is cancelled and the application fee is forfeited.

Good to know

  • Other fees: plumbing $75 minimum (or first fixture) plus $10 for each additional fixture; demolition permit $50; re-inspection $50; special inspection $150; permit renewal $200 a year; provisional occupancy certificate $100 per 90 days; temporary building up to 2 years $400.
  • Starting work before a permit costs double the fee, up to an additional $2,000.
  • The pages read do not say which payment methods the Village accepts. Ask the office.
  • The bylaw is posted as consolidated to May 23, 2023. Confirm with the Village that the schedule is current.

Official forms and pages

The same question in other places

Cache Creek · Logan Lake · Lillooet · Lytton · Kamloops · Merritt

Building permit fees in British Columbia, by municipality →

Sources

  1. Village of Ashcroft Building Regulations Bylaw 793, 2014, Appendix A (PDF, consolidated to May 23, 2023) (read 2026-11-08)
  2. Fees and Charges Bylaw No. 887, 2026 (PDF) (read 2026-11-08)

Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.