Chetwynd building permit fees
How much does a building permit cost in Chetwynd?
In Chetwynd a building permit costs $9 per $1,000 of construction value on the first $10,000, plus $6.50 per $1,000 on the rest, with a $75 minimum. Value is the contract cost or the bylaw's per-square-foot rates, whichever is greater.
Key facts
| Lowest fee | $75 (minimum building permit fee, for retaining walls and similar small jobs).Building Bylaw No. 973, 2012, consolidated to Bylaw 1028, Appendix 1, Building Permit Fees · Wording matched the official text retrieved 2026-11-08Official wordingMinimum Building Permit Fee (retaining walls, etc.) $75.00 |
|---|---|
| How the fee is worked out | $9 per $1,000 of construction value on the first $10,000, plus $6.50 per $1,000 on the remainder over $10,000. Value is the contract cost or the bylaw's per-square-foot rates, whichever is greater. The fee is cut 10% if an engineer provides a sealed design and on-site supervision.Building Bylaw No. 973, 2012, consolidated to Bylaw 1028, Appendix 1; Building Bylaw No. 973, 2012, consolidated to Bylaw 1028, Appendix 2 · Wording matched the official text retrieved 2026-11-08Official wordingFirst $10,000 of construction value $9.00 per $1,000 of value Remainder of construction value over $10,000 $6.50 per $1.000 of value Building Permit cost will be reduced by ten percent (10%). Value of residential construction will be calculated as per the contract cost if whichever is the greater amount. |
| Application or plan review fee | None set. The Building Bylaw lists no separate application or plan review fee.Read: Building Bylaw No. 973, 2012, consolidated to Bylaw 1028 |
| Other fees | Re-inspection $40; inspection outside regular hours $65; starting without a permit $400. If a stop work order is issued, penalty of double the permit fee, up to $1,500 (work under $1 million; 15% up to $15,000 above). Damage deposit $500, $250 or $1,000. Move or demolish: $625 under 200 sq ft, $1,250 over (75% refundable).Sources differ: The $400 charge in Appendix 1 and the 'double the permit fee' penalty in s. 4.15 both address starting without a permit; the bylaw does not say how they fit together. Temporary structure permits have a $250 refundable security deposit and a $200 long-term permit fee (Bylaws 993 and 1010). General bylaw offences carry a fine of $500 to $10,000 (s. 4.11).Building Bylaw No. 973, 2012, consolidated to Bylaw 1028, Appendix 1; Building Bylaw No. 973, 2012, consolidated to Bylaw 1028, s. 4.15 · Wording matched the official text retrieved 2026-11-08Official wordingRe-Inspection Fee $40.00 Inspection outside of regular working hours $65.00 Charge for starting construction without permit $400.00 Single Family Dwellings $500.00 Renovations or buildings valued less than $10,000 $250.00 All other projects $1,000.00 Under 200 square feet $625.00 200 square feet and over $1,250.00 Failure to control debris and rubbish from leaving site pay a penalty equal to double the permit fee for construction valued up to 1,000,000 (one million dollars), such penalty not to exceed $1,500 (one thousand five hundred dollars) such penalty not to exceed $15,000 (fifteen thousand dollars) shall, if a ‘Stop Work Order’ notice is issued, pay a penalty equal to double the permit fee for construction valued up to |
| How to pay | Fees are paid before the permit is issued: once plans are approved a permit is issued subject to receipt of the fees. The method of payment (cash, card, cheque) is not stated for building permits.Building Permit Guide, October 2024, Guide, Step 5; Building Bylaw No. 973, 2012, consolidated to Bylaw 1028, s. 9.2(c) · Wording matched the official text retrieved 2026-11-08Official wordingOnce your plans have been approved, a permit will be issued subject to receipt of applicable fees. the owner or representative has paid all applicable fees as specified in Appendix ‘1’ to this Bylaw |
| Bylaw | Building Bylaw No. 973, 2012, Appendix 1 (Fees and Charges) and Appendix 2 (Formula for Estimating Value of Construction).Building Bylaw No. 973, 2012, consolidated to Bylaw 1028, Appendix 1 and Appendix 2; Appendix 1, Fees, Appendix 1 (stand-alone PDF) · Wording matched the official text retrieved 2026-11-08Official wordingFEES AND CHARGES FORMULA FOR ESTIMATING VALUE OF CONSTRUCTION BUILDING BYLAW NO. 973, 2012 FEES AND CHARGES |
How it works
Fees are set in Appendix 1 of the District of Chetwynd's Building Bylaw No. 973. Appendix 2 sets per-square-foot values used to estimate construction value; the contract cost or those rates, whichever is greater, is the value used. The fee is reduced by 10% if an engineer provides a sealed design and on-site supervision, and by 25% when the permit relies on professional Letters of Assurance.
Steps
- Ask the Building Inspector (250-401-4100) for your fee once you know the value of the work.
- Pay once plans are approved; the permit is issued subject to receipt of the fees. The bylaw and guide do not say which payment methods are accepted.
Good to know
- Minimum permit fee: $75 (for retaining walls and similar small jobs).
- Re-inspection $40; inspection outside regular hours $65.
- Starting work without a permit: $400. If a stop work order is issued, the penalty is double the permit fee, up to $1,500 for work under $1 million.
- Damage deposit: $500, $250 or $1,000. Move or demolish: $625 under 200 sq ft, $1,250 over, with 75% refundable.
- An 85% refund can be requested within one year if construction has not started.
- The bylaw lists no separate application or plan-review fee. Offences under the bylaw can carry a fine of $500 to $10,000.
- These amounts come from a bylaw copy consolidated in 2015. Confirm current fees with the District.
Official forms and pages
The same question in other places
Tumbler Ridge · Fort St. John · Taylor · Dawson Creek · Pouce Coupe · Mackenzie
Sources
- Building Bylaw No. 973, 2012, consolidated to Bylaw 1028 (PDF), District of Chetwynd (read 2026-11-08)
- Appendix 1, Fees (PDF), District of Chetwynd (read 2026-11-08)
- Building Permit Guide, October 2024 (PDF), District of Chetwynd (read 2026-11-08)
Checked by script, not yet by a person: the official wording behind 5 of 6 facts was matched to the official text; 1 is recorded as not set. How answers are checked.