Tumbler Ridge building permit fees
How much does a building permit cost in Tumbler Ridge?
In Tumbler Ridge the building permit fee depends on the value of the work. The minimum is $75 for work valued up to $1,000, plus $6 per $1,000 (or part) over that, up to $200,000. Each application also pays a plan-processing fee and a security deposit (minimum $100).
Key facts
| Lowest fee | $75 building permit fee for work valued $0 to $1,000. Each application also pays a non-refundable plan-processing fee ($50 for work of $10,000 or less; Schedule A also lists $150 for single and two-family dwellings and their accessory structures, dollar sign garbled) and a security/damage deposit (minimum $100).Building and Plumbing Bylaw No. 600, 2013, Schedule A, items 1 and 2 · Wording matched the official text retrieved 2026-11-08Official wordingFor all construction having a market value of $10,000 or less $50.00 $0 - $1,000 $75.00 all building permits For all single and two-family dwelling unit construction and related accessory structures For all construction having a market value of |
|---|---|
| How the fee is worked out | Based on the estimated construction value. $75 plus $6 per $1,000 (or part) over $1,000, up to $200,000; $1,269 plus $4.50 per $1,000 over $200,000, up to $300,000; $1,719 plus $4 per $1,000 over $300,000.Building and Plumbing Bylaw No. 600, 2013, Schedule A, item 2; Building and Plumbing Bylaw No. 600, 2013, s. 1.1 definition; Building & Utilities Permit Applications, FAQ, 'How much are building permit fees?' · Wording matched the official text retrieved 2026-11-08Official wording$75.00 plus $6.00 for each additional $1,000 or part thereof over $1,000 $1269.00 plus $4.50 for each additional $1,000 or part thereof over $200,000 $1719.00 plus $4.00 for each additional $1,000 or part thereof over $300,000 means the estimated market value which is subject to a permit as Building Permit Fees are calculated on a project-to-project basis based on Market Value and labour cost of the project. |
| Application or plan review fee | Yes. A non-refundable plan-processing fee is paid with the application and credited to the building permit fee at issuance: $50 for work of $10,000 or less, $100 for more than $10,000 and under $150,000, $1,000 for non-residential work of $150,000 or more. Schedule A also lists $150 for single and two-family dwellings and accessory structures.Building and Plumbing Bylaw No. 600, 2013, s. 11.1, Schedule A item 1 · Wording matched the official text retrieved 2026-11-08Official wordingEvery permit application shall include a non-refundable plan-processing fee in accordance with Schedule will be applied to the Building Permit fee at issuance For all construction otherthan single or two- family dwelling units having a market value of $150,000.00 or more will be applied to the Building Permit fee at issuance). For all single and two-family dwelling unit construction and related accessory structures |
| Other fees | Plumbing permit: $75 minimum plus $17 per fixture. Demolition: $200 plus a $10,000 security damage deposit. Re-inspection: $50. Wood stove or fireplace permit: $50. Occupancy permit where no building permit is needed: $200. Starting work without a permit, if a stop-work order is issued, adds 100% of the permit fee.Building & Utilities Permit Applications, FAQ, fees; Building and Plumbing Bylaw No. 600, 2013, Schedule A item 3(h), (i); s. 22.6 · Wording matched the official text retrieved 2026-11-08Official wordingPlumbing Permit Fees $ 75.00 minimum plus $17.00 per fixture Building demolition permit plus Security Damage Deposit of $10,000 For occupancy permit where no Building Permit is required Permit for wood burning stove or fireplace pay an additional charge equal to 100% of the permit fee prior to obtaining the required permit |
| How to pay | The permit fee must be paid in full before the permit is issued. The security/damage deposit is posted when applying (s. 26.1; s. 11.8 says in advance of inspection) as a certified bank draft, cash or irrevocable letter of credit. Inspection charges are paid in advance of inspection.Building and Plumbing Bylaw No. 600, 2013, s. 11.2, 11.8, 26.1 · Wording matched the official text retrieved 2026-11-08Official wordingA permit fee calculated in accordance with the Schedules to this Bylaw shall be paid in full prior to issuance of the relevant permit under this Bylaw. inspection charges and Security/Damage deposit shall be paid in accordance with Schedule post a damage deposit by way of a certified bank draft, cash or an irrevocable result of the work covered by the permit and shall at the time of the application for a permit post a damage deposit by way of a certified bank draft, cash or an irrevocable |
| Bylaw | Building and Plumbing Bylaw No. 600, 2013, Schedule A (Building Permit Fees)Building and Plumbing Bylaw No. 600, 2013, Schedule A · Wording matched the official text retrieved 2026-11-08Official wordingBUILDING PERMIT FEES Building Permit Fee Payable Plus Security (see 3(k)) |
How it works
The District of Tumbler Ridge sets building permit fees in Schedule A of the Building and Plumbing Bylaw No. 600. The fee is based on the estimated construction value, which the Building Inspector sets from cost data.
The rates are:
- $75 plus $6 per $1,000 (or part) over $1,000, up to $200,000.
- $1,269 plus $4.50 per $1,000 over $200,000, up to $300,000.
- $1,719 plus $4 per $1,000 over $300,000.
Steps
- Pay a non-refundable plan-processing fee with your application. It is credited to the permit fee when the permit is issued: $50 for work of $10,000 or less, $100 for more than $10,000 and under $150,000, and $1,000 for non-residential work of $150,000 or more. Schedule A also lists $150 for single and two-family dwellings and their accessory buildings.
- Post the security or damage deposit when you apply. The minimum is $100 and the maximum is $35,000. It is paid by certified bank draft, cash or irrevocable letter of credit, and returned after the occupancy inspection less a $50 administration fee.
- Pay the permit fee in full before the permit is issued. Inspection charges are paid in advance.
Good to know
- Other Schedule A fees: plumbing permit $75 minimum plus $17 per fixture; demolition $200 plus a $10,000 security deposit; re-inspection $50; wood stove or fireplace permit $50; occupancy permit where no building permit is needed $200; mover application $100.
- Starting work without a permit, if a stop-work order is issued, adds 100% of the permit fee.
- The bylaw does not say whether cards or online payment are accepted. Ask Town Hall at 250-242-4242.
- The bylaw posted is the 2013 original. No later change to Schedule A was found, so confirm current fees with the Building Official.
Official forms and pages
The same question in other places
Chetwynd · Dawson Creek · Pouce Coupe · Mackenzie · Taylor · Fort St. John
Sources
- Building and Plumbing Bylaw No. 600, 2013 (PDF), District of Tumbler Ridge (read 2026-11-08)
- Building & Utilities Permit Applications, District of Tumbler Ridge (read 2026-11-08)
Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.