Esquimalt building permit fees

How much does a building permit cost in Esquimalt?

Esquimalt, British ColumbiaChecked against official textSources read 2026-11-06

Short answer

In Esquimalt a building permit costs $100 for work valued at $1,000 or less, plus $13 per $1,000 for the next $99,000, $11 per $1,000 for the next $400,000 and $9 per $1,000 above $500,000, under the Building Regulation Bylaw. Taxes apply.

Key facts

Lowest fee$100 for work valued at $1,000 or less (Schedule A, s. 3(1)(a)). Fees are subject to applicable taxes and rounded up to the nearest dollar.Sources differ: Conflict: the Fees PDF on the Application & Permits page shows $50 (first $1,000 also $50, so every fee $50 lower: $100,000 job = $1,337), the consolidated bylaw (Nov. 2023) shows $100 ($1,387). Bylaw followed. The PDF may reflect a later amendment not in the consolidation.Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Schedule A, s. 3(1)(a); Building and plumbing fees, Schedule A, s. 3(1)(a) (website copy) · Wording matched the official text retrieved 2026-11-06
Official wording
(a) value of construction of $1,000.00 or less: $100
Fees under this Schedule are subject to applicable Taxes
(a) value of construction of $1,000.00 or less: $50
How the fee is worked outBased on the value of construction: $100 for the first $1,000, plus $13 per $1,000 (or part) for the next $99,000, plus $11 per $1,000 for the next $400,000, plus $9 per $1,000 over $500,000. Example in the bylaw: $100,000 job = $1,387. Value is the contract cost, or the applicant's estimate; a Building Official sets the final value.Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Schedule A, s. 3 · Wording matched the official text retrieved 2026-11-06
Official wording
for next $99,000 plus $13 per $1,000
for next $400,000 plus $11 per $1,000
over $500,000 plus $9 per $1,000
The final value of construction shall be established by a Building Official.
100,000 - 1,387.00
Application or plan review feeA plan-processing fee of 25% of the permit fee (minimum $50, maximum $2,000) is collected if a Building Official considers it advisable. It is non-refundable and credited against the permit fee when the permit is issued.Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Schedule A s. 1; s. 14.2 · Wording matched the official text retrieved 2026-11-06
Official wording
Plan-processing fee for any application for Permit: 25% of Permit Fee
Maximum plan-processing fee: $2,000
Minimum plan-processing fee: $50
the plan-processing fee is non-refundable and shall be credited against the
Other feesDemolition permit $200. Plumbing permit minimum $50 (fixtures $15 each for 1 to 10). Sign permit $50. Re-inspection $50 for each inspection after the second. After-hours inspection $90 an hour (1 hour minimum). Permit renewal 20% of the permit fee (min $50, max $500). Starting work without a permit adds a fee of 100% of the permit fee (150% if a stop-work order was issued). A $2,500 damage deposit is required when a building or demolition permit is issued (refundable; may be waived).Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Schedule A; s. 21.7 · Wording matched the official text retrieved 2026-11-06
Official wording
Fee for Permit to demolish, deconstruct or remove building or structure: $200
The minimum fee for a plumbing permit shall be $50
Sign Permit: $50
the fee for each inspection after the second inspection shall be: $50
shall be charged at: $90/hour
Permit renewal fee: 20% of Permit fee
shall pay an additional fee equal to 100% of the fee
a deposit of $2,500.00
is required for restoration of damage to any Township property or works
How to payThe permit fee must be paid in full before the permit is issued. If a Building Official considers it advisable, a plan-processing fee accompanies the application.Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), s. 14.1, 14.2.1 · Wording matched the official text retrieved 2026-11-06
Official wording
a Permit fee, calculated in accordance with Schedule A, shall be paid in full prior to issuance of any Permit
shall accompany an application for a Permit
If in the opinion of a Building Official it is advisable for the Township to collect a
14.2.1 the appropriate plan-processing fee as set out in Schedule A shall
BylawBuilding Regulation Bylaw, 2017, No. 2899, Schedule A (Fees)Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Schedule A · Wording matched the official text retrieved 2026-11-06
Official wording
BUILDING REGULATION BYLAW, 2017, NO. 2899 SCHEDULE A

How it works

Esquimalt sets building permit fees in Schedule A of the Building Regulation Bylaw, 2017, No. 2899. The fee is based on the value of the construction: the contract cost, or your estimate. A Building Official sets the final value. Fees are subject to applicable taxes and rounded up to the nearest dollar.

  • $100 for the first $1,000 of value.
  • Plus $13 per $1,000 (or part) for the next $99,000.
  • Plus $11 per $1,000 for the next $400,000.
  • Plus $9 per $1,000 over $500,000.

Steps

  1. Ask Building Inspection for your project's estimated value and fee.
  2. If a Building Official considers it advisable, a plan-processing fee comes with the application (see below).
  3. Pay the permit fee in full before the permit is issued. The bylaw and web pages read do not say how to pay (cash, card or online); ask when you call.

Good to know

  • Plan-processing fee: 25% of the permit fee (minimum $50, maximum $2,000). It is non-refundable and credited against the permit fee when the permit is issued.
  • Other fees: demolition permit $200; plumbing permit minimum $50 (fixtures $15 each for 1 to 10); sign permit $50; re-inspection $50 for each inspection after the second; after-hours inspection $90 an hour (1 hour minimum); permit renewal 20% of the permit fee (minimum $50, maximum $500).
  • Starting work without a permit adds a fee of 100% of the permit fee (150% if a stop-work order was issued).
  • A $2,500 damage deposit is required when a building or demolition permit is issued. It is refundable and may be waived if damage is unlikely.
  • The Township's separate Fees PDF shows $50 where the bylaw shows $100 for the first $1,000. This page follows the bylaw; confirm the current fee with Building Inspection.

Official forms and pages

The same question in other places

View Royal · Victoria · Colwood · Saanich · Oak Bay · Langford

Building permit fees in British Columbia, by municipality →

Sources

  1. Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Township of Esquimalt (read 2026-11-06)
  2. Building and plumbing fees (PDF), Township of Esquimalt (read 2026-11-06)