Esquimalt building permit fees
How much does a building permit cost in Esquimalt?
In Esquimalt a building permit costs $100 for work valued at $1,000 or less, plus $13 per $1,000 for the next $99,000, $11 per $1,000 for the next $400,000 and $9 per $1,000 above $500,000, under the Building Regulation Bylaw. Taxes apply.
Key facts
| Lowest fee | $100 for work valued at $1,000 or less (Schedule A, s. 3(1)(a)). Fees are subject to applicable taxes and rounded up to the nearest dollar.Sources differ: Conflict: the Fees PDF on the Application & Permits page shows $50 (first $1,000 also $50, so every fee $50 lower: $100,000 job = $1,337), the consolidated bylaw (Nov. 2023) shows $100 ($1,387). Bylaw followed. The PDF may reflect a later amendment not in the consolidation.Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Schedule A, s. 3(1)(a); Building and plumbing fees, Schedule A, s. 3(1)(a) (website copy) · Wording matched the official text retrieved 2026-11-06Official wording(a) value of construction of $1,000.00 or less: $100 Fees under this Schedule are subject to applicable Taxes (a) value of construction of $1,000.00 or less: $50 |
|---|---|
| How the fee is worked out | Based on the value of construction: $100 for the first $1,000, plus $13 per $1,000 (or part) for the next $99,000, plus $11 per $1,000 for the next $400,000, plus $9 per $1,000 over $500,000. Example in the bylaw: $100,000 job = $1,387. Value is the contract cost, or the applicant's estimate; a Building Official sets the final value.Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Schedule A, s. 3 · Wording matched the official text retrieved 2026-11-06Official wordingfor next $99,000 plus $13 per $1,000 for next $400,000 plus $11 per $1,000 over $500,000 plus $9 per $1,000 The final value of construction shall be established by a Building Official. 100,000 - 1,387.00 |
| Application or plan review fee | A plan-processing fee of 25% of the permit fee (minimum $50, maximum $2,000) is collected if a Building Official considers it advisable. It is non-refundable and credited against the permit fee when the permit is issued.Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Schedule A s. 1; s. 14.2 · Wording matched the official text retrieved 2026-11-06Official wordingPlan-processing fee for any application for Permit: 25% of Permit Fee Maximum plan-processing fee: $2,000 Minimum plan-processing fee: $50 the plan-processing fee is non-refundable and shall be credited against the |
| Other fees | Demolition permit $200. Plumbing permit minimum $50 (fixtures $15 each for 1 to 10). Sign permit $50. Re-inspection $50 for each inspection after the second. After-hours inspection $90 an hour (1 hour minimum). Permit renewal 20% of the permit fee (min $50, max $500). Starting work without a permit adds a fee of 100% of the permit fee (150% if a stop-work order was issued). A $2,500 damage deposit is required when a building or demolition permit is issued (refundable; may be waived).Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Schedule A; s. 21.7 · Wording matched the official text retrieved 2026-11-06Official wordingFee for Permit to demolish, deconstruct or remove building or structure: $200 The minimum fee for a plumbing permit shall be $50 Sign Permit: $50 the fee for each inspection after the second inspection shall be: $50 shall be charged at: $90/hour Permit renewal fee: 20% of Permit fee shall pay an additional fee equal to 100% of the fee a deposit of $2,500.00 is required for restoration of damage to any Township property or works |
| How to pay | The permit fee must be paid in full before the permit is issued. If a Building Official considers it advisable, a plan-processing fee accompanies the application.Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), s. 14.1, 14.2.1 · Wording matched the official text retrieved 2026-11-06Official wordinga Permit fee, calculated in accordance with Schedule A, shall be paid in full prior to issuance of any Permit shall accompany an application for a Permit If in the opinion of a Building Official it is advisable for the Township to collect a 14.2.1 the appropriate plan-processing fee as set out in Schedule A shall |
| Bylaw | Building Regulation Bylaw, 2017, No. 2899, Schedule A (Fees)Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Schedule A · Wording matched the official text retrieved 2026-11-06Official wordingBUILDING REGULATION BYLAW, 2017, NO. 2899 SCHEDULE A |
How it works
Esquimalt sets building permit fees in Schedule A of the Building Regulation Bylaw, 2017, No. 2899. The fee is based on the value of the construction: the contract cost, or your estimate. A Building Official sets the final value. Fees are subject to applicable taxes and rounded up to the nearest dollar.
- $100 for the first $1,000 of value.
- Plus $13 per $1,000 (or part) for the next $99,000.
- Plus $11 per $1,000 for the next $400,000.
- Plus $9 per $1,000 over $500,000.
Steps
- Ask Building Inspection for your project's estimated value and fee.
- If a Building Official considers it advisable, a plan-processing fee comes with the application (see below).
- Pay the permit fee in full before the permit is issued. The bylaw and web pages read do not say how to pay (cash, card or online); ask when you call.
Good to know
- Plan-processing fee: 25% of the permit fee (minimum $50, maximum $2,000). It is non-refundable and credited against the permit fee when the permit is issued.
- Other fees: demolition permit $200; plumbing permit minimum $50 (fixtures $15 each for 1 to 10); sign permit $50; re-inspection $50 for each inspection after the second; after-hours inspection $90 an hour (1 hour minimum); permit renewal 20% of the permit fee (minimum $50, maximum $500).
- Starting work without a permit adds a fee of 100% of the permit fee (150% if a stop-work order was issued).
- A $2,500 damage deposit is required when a building or demolition permit is issued. It is refundable and may be waived if damage is unlikely.
- The Township's separate Fees PDF shows $50 where the bylaw shows $100 for the first $1,000. This page follows the bylaw; confirm the current fee with Building Inspection.
Official forms and pages
The same question in other places
View Royal · Victoria · Colwood · Saanich · Oak Bay · Langford
Sources
- Building Regulation Bylaw, 2017, No. 2899 (PDF, consolidated Nov. 6, 2023), Township of Esquimalt (read 2026-11-06)
- Building and plumbing fees (PDF), Township of Esquimalt (read 2026-11-06)
Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.