GovHandbook

Fruitvale tree removal rules and permits

Do I need permission to cut down a tree on my property in Fruitvale?

Fruitvale, British ColumbiaChecked against official textSources read 2026-11-08

Short answer

Fruitvale has no tree-cutting bylaw. But its Official Community Plan requires a development permit for land alteration or development in its development permit areas, and removing vegetation counts as development. Ask the Village whether your lot is inside one.

Key facts

When a permit is neededNo tree-cutting bylaw found. But the OCP requires a development permit for land alteration or development in its development permit areas (including Hazardous Conditions and Wildfire Interface), and it defines development to include removal or alteration of vegetation. Maps of the areas are in OCP Schedules K and N.Official Community Plan Bylaw No. 835 and development permit areas, OCP s. 17.5 · Wording matched the official text retrieved 2026-11-08
Official wording
Prior to any subdivision, land alteration or development of properties
within a development permit area, a development permit is required.
Means (a) removal, alteration, etc. of
vegetation; (b) disturbance of soils; (c)
ExemptionsIn the Hazardous Conditions and Wildfire Interface development permit areas, no permit is needed to remove diseased, dead or dying trees if the application is accompanied by a report from a qualified professional forester.Official Community Plan Bylaw No. 835 and development permit areas, OCP s. 17.6 and 17.12 exemptions · Wording matched the official text retrieved 2026-11-08
Official wording
An application to remove diseased, dead or dying trees is
accompanied by a report prepared by a qualified
professional forester.
FeeThe development permit application fee is $200 if a development permit is required. A separate tree-cutting charge was not confirmed.Rates, Fees and Charges Bylaw No. 982, 2025, Appendix 8 · Wording matched the official text retrieved 2026-11-08
Official wording
PLANNING, DEVELOPMENT AND BUILDING PERMIT FEES TYPE OF PERMIT FEE Development Permit Application** $200.00 Development Variance Permit Application** $400.00 Official Community Plan Application** $400.00
Replacement treesNot confirmed. Not found in the official sources that were read.
City treesIn Village parks, no one may destroy, damage, climb, break, remove or injure any tree, shrub, plant, turf or flower (Parks Regulation Bylaw 829, item 1; bylaw notice $100 for damaging vegetation). Owners must trim trees and shrubs on the boulevard beside their property (Property Maintenance Bylaw 845, s. 11).Parks Regulation Bylaw No. 829, Part II, item 1 · Wording matched the official text retrieved 2026-11-08
Official wording
destroy, damage, climb, break, remove or injure any tree, shrub, plant, turf or flower;
FineNot confirmed. Not found in the official sources that were read.
BylawNo tree-cutting bylaw. Rules come from Official Community Plan Bylaw No. 835 (2011), development permit areas (ss. 17.5, 17.6 and 17.12), where removing vegetation counts as development.Official Community Plan Bylaw No. 835 and development permit areas, ss. 17.5, 17.6, 17.12 · Wording matched the official text retrieved 2026-11-08
Official wording
A Bylaw to Adopt an Official Community Plan
within a development permit area, a development permit is required.

How it works

The Village has no bylaw that protects trees or requires a permit to cut one on private land. Its Official Community Plan Bylaw No. 835 does require a development permit for land alteration or development in its development permit areas, including Hazardous Conditions and Wildfire Interface. It defines development to include removing or altering vegetation. The area maps are in OCP Schedules K and N. Which lots are inside them is not stated in text, so ask the Village.

In the Hazardous Conditions and Wildfire Interface areas, no permit is needed to remove diseased, dead or dying trees if the application comes with a report from a qualified professional forester.

Steps

  1. Call the Village Office (250-367-7551) with your address and ask whether the lot is in a development permit area.
  2. If it is, ask whether your tree work needs a development permit ($200 to apply, under Rates, Fees and Charges Bylaw 982).
  3. For a dead or dying tree in those areas, get the forester's report first.

Good to know

  • Village parks: no one may destroy, damage, climb, break, remove or injure any tree, shrub, plant, turf or flower (Parks Regulation Bylaw 829). A bylaw notice for damaging vegetation is $100.
  • Owners must trim trees and shrubs on the boulevard beside their property (Property Standards Bylaw 845, s. 11).
  • No replacement-planting rule and no tree-specific fine were found. The zoning and OCP penalty can be up to $10,000 (Zoning Bylaw s. 5.4.1).

Official forms and pages

The same question in other places

Montrose · Trail · Rossland · Castlegar · Nelson · Grand Forks

Tree removal permits in British Columbia, by municipality →

Sources

  1. Official Community Plan Bylaw No. 835 and development permit areas (PDF) (read 2026-11-08)
  2. Rates, Fees and Charges Bylaw No. 982, 2025, Appendix 8 (PDF) (read 2026-11-08)
  3. Parks Regulation Bylaw No. 829 (PDF) (read 2026-11-08)
  4. Property Standards Bylaw No. 845 (PDF) (read 2026-11-08)
  5. Contact, Village of Fruitvale (read 2026-11-08)

Checked by script, not yet by a person: the official wording behind 5 of 7 facts was matched to the official text; 2 could not be confirmed. How answers are checked.