How much does a building permit cost in Gold River?

Gold River, British ColumbiaChecked against official textSources read 2026-11-08

Short answer

In Gold River a building permit costs $8 for each $1,000 of construction value, with a $75 minimum. A separate plan processing fee is paid when you apply: $50 for an accessory building or $100 for two or fewer dwelling units. It is credited against the permit fee.

Key facts

Lowest fee$75 minimum building permit fee.Fees and Charges Bylaw No. 734, 2021, Schedule C · Wording matched the official text retrieved 2026-11-08
Official wording
Fee for each $1,000 of value of construction (minimum $75 permit fee) $8.00 per $1,000
How the fee is worked out$8 for each $1,000 of construction value, with a $75 minimum. The Building Inspector may require an appraisal of the value at the applicant's expense. Plumbing permit: $60 plus $5 per fixture.Fees and Charges Bylaw No. 734, 2021, Schedule C; Application for a Permit to Construct or Demolish, Fee calculation · Wording matched the official text retrieved 2026-11-08
Official wording
Fee for each $1,000 of value of construction (minimum $75 permit fee) $8.00 per $1,000
Prior to issuing a permit, a Building Inspector may require an applicant to provide the
Plumbing Permit
$60.00 plus $5.00 per
Project @$8.00 per $1,000
Application or plan review feeA plan processing fee is paid at application: $50 for an accessory building or structure; $100 for two or fewer self-contained dwelling units; $100 plus $50 per unit for three or more units or commercial/industrial. It is non-refundable and credited against the building permit fee when the permit is issued.Fees and Charges Bylaw No. 734, 2021, Schedule C; Building Bylaw No. 651, 2005, s. 12.2.1 · Wording matched the official text retrieved 2026-11-08
Official wording
Accessory building/structure
$50.00
Two or less self-contained dwelling units
$100.00
The plan-processing fee is non-refundable and shall be credited against the
building permit fee when the building permit is issued.
Other feesDemolition: $100 if under 1,000 sq. ft., or $100 plus $50 per 1,000 sq. ft. (or part) if larger. Permit to move a building: $550. Re-inspection $50. Building file review $50. Plumbing permit $60 plus $5 per fixture. Starting work without a permit: double fee. Refund if no inspection done: 70% of permit fee (excluding plan processing fee).Fees and Charges Bylaw No. 734, 2021, Schedule C · Wording matched the official text retrieved 2026-11-08
Official wording
Permit to move a building
$550.00
Construction without a valid permit
Double Fee
Re-inspection
Building Permit Refund (if no inspection done)
70% of Permit Fee
Less than 1,000 sq. ft. in floor area
How to payFees are paid by cash, cheque or money order payable to the Village of Gold River. The plan review fee is paid when the application is submitted; the permit fee is paid when the permit is picked up.Application for a Permit to Construct or Demolish, Application form · Wording matched the official text retrieved 2026-11-08
Official wording
Permit fees shall be paid by way of cash, cheque or money order, payable to the Village of Gold River.
When you pick up your permit, the fees
will have to be paid.
BylawFees and Charges Bylaw No. 734, 2021, Schedule C (Building Permit Fees and Charges); Building Bylaw No. 651, 2005Fees and Charges Bylaw No. 734, 2021, Schedule C · Wording matched the official text retrieved 2026-11-08
Official wording
BUILDING PERMIT FEES AND CHARGES
Fees and Charges Bylaw No. 734, 2021

How it works

The Village of Gold River sets building permit fees in Schedule C of Fees and Charges Bylaw No. 734, 2021. The permit fee is $8 for each $1,000 of construction value, with a $75 minimum. Before issuing a permit, the Building Inspector may require an appraisal of the value at your expense.

When you apply you pay a plan processing fee: $50 for an accessory building or structure, $100 for two or fewer self-contained dwelling units, or $100 plus $50 per unit for three or more units or commercial and industrial buildings. It is non-refundable but credited against the permit fee when the permit is issued.

Other fees

  • Demolition: $100 if under 1,000 sq. ft., or $100 plus $50 per 1,000 sq. ft. (or part) if larger.
  • Permit to move a building: $550.
  • Plumbing permit: $60 plus $5 per fixture.
  • Re-inspection: $50. Building file review: $50.
  • Work started without a permit: double fee.
  • Refund if no inspection was done: 70% of the permit fee (not the plan processing fee).

Good to know

  • Pay by cash, cheque or money order payable to the Village of Gold River. The permit fee must be paid in full before the permit is issued.
  • An application is cancelled and the plan processing fee forfeited if the permit fee is not paid within 180 days of written notice that the permit is ready.
  • The older fee scale in the Building Bylaw's own schedule differs from Bylaw 734; the bylaw says Bylaw 734 applies. Confirm the current rate with the Village office.

Official forms and pages

The same question in other places

Tahsis · Campbell River · Tofino · Sayward · Cumberland · Courtenay

Building permit fees in British Columbia, by municipality →

Sources

  1. Fees and Charges Bylaw No. 734, 2021 (PDF), Village of Gold River (read 2026-11-08)
  2. Building Bylaw No. 651, 2005 (PDF), Village of Gold River (read 2026-11-08)
  3. Application for a Permit to Construct or Demolish (PDF), Village of Gold River (read 2026-11-08)

Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.