Granisle building permits: when you need one and how to apply

Do I need a building permit in Granisle, and how do I apply?

Granisle, British ColumbiaChecked against official textSources read 2026-11-08

Short answer

In Granisle you need a building permit to build, alter, repair, move or demolish a building, to place a manufactured home, or to install a solid-fuel stove or chimney. Building inspection is provided by the Regional District of Bulkley-Nechako; contact the Village Office to apply.

Key facts

Needed forAny work to construct, erect, replace, rebuild, alter, repair, move or demolish a building, or change its occupancy. Also manufactured or modular homes, and installing or altering a solid-fuel stove or chimney.Building Bylaw No. 412, 2009, s. 6.1, 6.7, 6.8 · Wording matched the official text retrieved 2026-11-08
Official wording
No person shall commence or continue any work related to the construction,
No person shall build, install, place or locate any manufactured home or any
No person shall install or alter a stove or heater that uses solid fuel, including pellet
Not needed forStorage or garden shed up to 10 m² (if it meets other bylaws); decks or patios 600 mm (2 ft) or less above grade; farm buildings on classified farms; maintenance that does not affect structure, safety or health; clearing pipe stoppages or repairing leaks.Building Bylaw No. 412, 2009, s. 5.3 to 5.7 · Wording matched the official text retrieved 2026-11-08
Official wording
ground floor area not exceeding 10 square meters (108 sq. ft.),
No permit is required for decks or patios 600 millimetres (2 ft.) or less from top ofdeck
This bylaw does not apply to farm buildings located on property, which has been
No permit is required for the clearing of stoppages or the repairing of leaks in pipes,
How to applyApply on the form provided by the building official, signed by the owner. Contact the Village Office; building inspection is provided by the RDBN.Building Bylaw No. 412, 2009, s. 8.4; Building Inspection, Building Inspection page · Wording matched the official text retrieved 2026-11-08
Official wording
be made in the form provided by the building official;
be signed by the owner orsigning officer if the owner is a corporation;
Services provided by Regional District of Bulkley-Nechako
Please contact the Village Office for more information.
What to submitThe intended use, and two copies of specifications and scale drawings showing dimensions, use of each room, land dimensions, zoning and legal description. When required: site plan, building drain and sectional drawings, survey, certificate of title, well location, sewage proof, highway access permit.Building Bylaw No. 412, 2009, s. 8.4, 8.5 · Wording matched the official text retrieved 2026-11-08
Official wording
state the intended use oruses of the proposed building orstructure;
be accompanied by two copies of the specifications and scale drawings of the
a certificate of title forthe property on which the building will be constructed.
Processing timeNot confirmed. The bylaw and the Village's pages do not state how long a permit takes.
InspectionsGive the building official at least one week's notice before starting work, and at least 72 hours' notice to book each required inspection (footings, foundation, framing, insulation, final before occupancy).Building Bylaw No. 412, 2009, s. 15.4 · Wording matched the official text retrieved 2026-11-08
Official wording
give at least one week's notice to the building official of an intention to start
give a least seventy-two (72) hours notice to the building official to obtain an
ContactRDBN building inspectors: Richard Wainright, Chief Building Inspector, 250 692 3195 ext. 228; Jason Berlin, Building Inspector, 250 692 3195 ext. 230. Village Office: 250.697.2248.Building Inspection, Building Inspection page; Contact, Contact page · Wording matched the official text retrieved 2026-11-08
Official wording
Richard Wainright, Chief Building Inspector 250 692 3195 ext. 228
Jason Berlin, Building Inspector 250 692 3195 ext. 230
Phone 250.697.2248 Fax 888-335-4682
BylawVillage of Granisle Building Bylaw No. 412, 2009Building Bylaw No. 412, 2009, s. 23.1 · Wording matched the official text retrieved 2026-11-08
Official wording
BUILDING BYLAW NO. 412, 2009

How it works

The Village of Granisle's Building Bylaw No. 412, 2009 requires a permit before any work to construct, erect, replace, rebuild, alter, repair, move or demolish a building, or to change its occupancy. A permit is also needed to place a manufactured home and to install or alter a solid-fuel stove or chimney. The Village's website says building inspection services are provided by the Regional District of Bulkley-Nechako (RDBN).

The bylaw exempts a storage or garden shed up to 10 m² that meets other bylaws, a deck or patio 600 mm (2 ft) or less above grade, farm buildings on classified farms, maintenance that does not affect structure, safety or health, and clearing pipe stoppages or repairing leaks.

Steps

  1. Contact the Village Office (250-697-2248) to confirm what your project needs and get the application form.
  2. Fill in the form provided by the building official. The owner must sign it.
  3. Include the intended use and two copies of the specifications and scale drawings showing dimensions, use of each room, land dimensions, zoning and legal description. When required, add a site plan, survey, certificate of title, well location, proof of sewage disposal and a highway access permit.
  4. Pay the permit fee before the permit is issued.
  5. Give the building official at least one week's notice before starting work, and at least 72 hours' notice to book each required inspection (footings, foundation, framing, insulation and the final inspection before occupancy).

Good to know

  • The bylaw and the Village's pages do not state how long a permit takes. Ask when you apply.
  • RDBN building inspectors can be reached at 250-692-3195 (ext. 228 or 230).
  • No online application was found on the Village's website.

Official forms and pages

The same question in other places

Telkwa · Smithers · Houston · Burns Lake · Hazelton · Fraser Lake

Building permits in British Columbia: how to apply, by municipality →

Sources

  1. Building Inspection, Village of Granisle (read 2026-11-08)
  2. Building Bylaw No. 412, 2009 (PDF), Village of Granisle (read 2026-11-08)
  3. Contact, Village of Granisle (read 2026-11-08)

Checked by script, not yet by a person: the official wording behind 7 of 8 facts was matched to the official text; 1 could not be confirmed. How answers are checked.