M1 zone in Keremeos: General Industrial
In short
Industrial uses and limited retail sales auxiliary to the permitted industrial uses.
Zone rules
| Purpose | Industrial uses and limited retail sales auxiliary to the permitted industrial uses. |
|---|---|
| Main uses |
|
| Also allowed (secondary uses) |
|
| Minimum lot area | 0.1 ha (municipal sewer); 1.0 ha (no municipal sewer) |
| Minimum lot width | 25.0 metres |
| Maximum lot coverage | 60% |
| Maximum density | One dwelling unit per parcel |
| Maximum height | 15.0 m |
| Maximum height, accessory buildings | 5.0 m |
| Front setback | 6.0 m |
| Rear setback | 3.0 m; 7.5 m where adjacent a non-industrial zone |
| Interior side setback | 3.0 m; 7.5 m where adjacent a non-industrial zone |
| Street side setback | 4.5 m |
| Accessory building setbacks | front 6.0 m, rear 3.0 m, interior side 3.0 m (rear and interior side 7.5 m where adjacent a non-industrial zone), exterior side 4.5 m |
| Other rules |
|
Source: Zoning Bylaw No. 851 (revised June 10, 2026; consolidated for convenience with amendment bylaws 851-01 to 851-11), s. 16.1 (read 2026-11-08)
Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. Consolidated for convenience. Section 5.1 also lists RS2, RS3 and RD1 but the consolidation has no section for them. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.
This zone as Markdown · JSON · all Keremeos zones · Report an error