GovHandbook

M2 zone in Keremeos: Aggregate Extraction

Keremeos, British ColumbiaDraft, not yet reviewedBylaw read 2026-11-08

In short

Extraction of aggregate by the Ministry of Transportation and Infrastructure (MoTI).

Zone rules

PurposeExtraction of aggregate by the Ministry of Transportation and Infrastructure (MoTI).
Main usesAggregate resource extraction
Also allowed (secondary uses)
  • Outdoor storage
  • Accessory buildings or structures
Minimum lot area8.0 ha
Maximum height10.0 m
Maximum height, accessory buildings5.0 m
Front setback30.0 m
Rear setback30.0 m
Interior side setback30.0 m
Street side setback30.0 m
Accessory building setbacksfront 30.0 m, rear 30.0 m, interior side 30.0 m, exterior side 30.0 m

Source: Zoning Bylaw No. 851 (revised June 10, 2026; consolidated for convenience with amendment bylaws 851-01 to 851-11), s. 16.2 (read 2026-11-08)

Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. Consolidated for convenience. Section 5.1 also lists RS2, RS3 and RD1 but the consolidation has no section for them. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.

This zone as Markdown · JSON · all Keremeos zones · Report an error