GovHandbook

Lantzville building permits: when you need one and how to apply

Do I need a building permit in Lantzville, and how do I apply?

Lantzville, British ColumbiaChecked against official textSources read 2026-11-08

Short answer

In Lantzville you need a District building permit to construct new buildings and structures, additions and renovations. Apply online through Cloudpermit. Fences, decks under 2 feet high and some small buildings are exempt. The District does not state a processing time.

Key facts

Needed forA building permit is required to construct new buildings and structures, additions and renovations.Building Permit, Building Permit page · Wording matched the official text retrieved 2026-11-08
Official wording
A Building Permit issued by the District is required to construct new buildings and structures, additions and renovations.
Not needed forFences, trellises, arbours, pergolas, retaining walls, swimming pools, playground structures, and pre-manufactured plastic coverall structures and sheds; decks under 2 ft above grade and not structurally attached; one-storey buildings up to 55 m² with no sleeping or dwelling units, not used by the public (owner's Schedule 3 declaration); non-structural alterations; plumbing; fireplaces.Building Bylaw No. 182, 2020 (PDF, consolidated), s. 2.4(a); Building Bylaw No. 182, 2020 (PDF, consolidated), s. 2.4(b); Building Bylaw No. 182, 2020 (PDF, consolidated), s. 2.4(c); Building Bylaw No. 182, 2020 (PDF, consolidated), s. 2.4(g), (h), (i); Building Permit, Building Permit page · Wording matched the official text retrieved 2026-11-08
Official wording
fences, trellises, arbours, pergolas, or other similar landscape structures, retaining walls, swimming pools, playground structures, and pre-manufactured plastic coverall structures and sheds
decks that are less than 2 ft above the average grade of the ground, measured from the top of the deck, and are not structurally attached to the building
a single storey standard building up to 55 m2 gross floor area that does not contain sleeping units or dwelling units and will not be used or occupied by members of the broader public
alterations to a building or structure that are not structural alterations
installation of a fireplace
plumbing systems and fixtures
If your property is located in a development permit area, a Development Permit application will still be required.
How to applyOnline through Cloudpermit, the District's cloud-based permitting software. Register for a Cloudpermit account, request a checklist, then apply online.Building Permit, Building Permit Application Process · Wording matched the official text retrieved 2026-11-08
Official wording
The District of Lantzville uses a cloud-based permitting software called Cloudpermit to issue building permits and other planning applications.
To create a building permit application, you will need to register for a Cloudpermit account.
Request a building permit checklist
What to submitRequirements vary by project. Items that may be required: a District checklist, applicable fees, a signed owner's undertaking, a site plan with zoning summary, Building Code summary, two sets of drawings plus PDFs, and letters of assurance. Other forms depend on the project (driveway, water and sewer connection, plumbing declaration, home warranty).Building Bylaw No. 182, 2020 (PDF, consolidated), Schedule A; Building Bylaw No. 182, 2020 (PDF, consolidated), s. 3.1 · Wording matched the official text retrieved 2026-11-08
Official wording
Building Permit application checklist provided by the District.
A Site Plan that includes a zoning compliance summary.
Two sets of drawings at a suitable scale of design, together with PDF copies of all drawings.
Homeowner Protection Warranty (BC Housing New Home Registration Form)
Building permit application requirements vary based on the type of building or works proposed and other factors including water and sewer connections, land use and land hazards, etc. The following may be required as part of the building permit application
must be made in a form approved by the building official and include a signed owner’s undertaking in accordance with SCHEDULE 1
Processing timeNot confirmed. The official pages do not state this detail.
InspectionsRequest inspections through Cloudpermit. Three stages: forms and radon rough-in before concrete, framing before insulation or finishes, and a final health and safety inspection. Owners must give at least 48 hours' written notice before covering work that must be inspected and when work is complete for final inspection.Building Permit, Building Permit Application Process; Building Bylaw No. 182, 2020 (PDF, consolidated), s. 5.2; Building Bylaw No. 182, 2020 (PDF, consolidated), s. 7.11 · Wording matched the official text retrieved 2026-11-08
Official wording
Request or cancel inspections
The owner must contact the District of Lantzville to request an inspection and receive the building official’s written acceptance
Every owner must give at least 48 hours’ written notice to a building official of intent to do work that is required or ordered to be corrected during construction, to cover work that is required under this bylaw to be, or has been ordered to be, inspected prior to covering, and when work has been completed so that a final inspection can be made.
Every owner must give at least 48 hours’ written notice to a building official of intent to do work that is required or ordered to be corrected during construction
ContactPlanning Department (building permits): planning@lantzville.ca, 250.933.8093. The contact page also lists Building Inspection Services: building@lantzville.ca, 250.933.8091.Building Permit, Building Permit page; Contact Information, Department contact information · Wording matched the official text retrieved 2026-11-08
Official wording
please review the Building Bylaw or contact the Planning Department at planning@lantzville.ca or 250.933.8093
Utilities | 250.933.8086 | finance@lantzville.ca | Building Inspection Services | 250.933.8091 | building@lantzville.ca | Public Works | 250.933.2250
| 250.933.8086 | finance@lantzville.ca | Building Inspection Services | 250.933.8091 | building@lantzville.ca | Public Works | 250.933.2250 | publicworks@lantzville.ca
| finance@lantzville.ca | Building Inspection Services | 250.933.8091 | building@lantzville.ca | Public Works | 250.933.2250 | publicworks@lantzville.ca | Bylaw Enforcement
BylawDistrict of Lantzville Building Bylaw No. 182, 2020 (consolidated to Amendment Bylaw No. 381, 2024)Building Bylaw No. 182, 2020 (PDF, consolidated), Title page · Wording matched the official text retrieved 2026-11-08
Official wording
BUILDING BYLAW NO. 182, 2020
District of Lantzville Building Bylaw No. 182, 2020,

How it works

The District of Lantzville issues building permits under its Building Bylaw No. 182, 2020. Applications are reviewed against the BC Building Code in effect when a complete application is submitted. A permit is required to construct new buildings and structures, additions and renovations, and to site a mobile, manufactured or modular home in the District.

No building permit is needed for fences, trellises, arbours, pergolas, retaining walls, swimming pools, playground structures, and pre-manufactured plastic coverall structures and sheds. Also exempt are decks under 2 ft above grade that are not structurally attached to a building, one-storey buildings up to 55 m² with no sleeping or dwelling units that the public will not use (with the owner's signed Schedule 3 declaration), non-structural alterations, plumbing and fireplaces. The Zoning Bylaw and a development permit may still apply.

Steps

  1. Ask the Planning Department which permits and drawings your project needs.
  2. Register for a Cloudpermit account through the District's Building Permit page and request a building permit checklist.
  3. Apply online with what the checklist asks for. This may include applicable fees, a signed owner's undertaking, a site plan with zoning summary, a Building Code summary, two sets of drawings plus PDFs, and letters of assurance.
  4. Request inspections through Cloudpermit: forms and radon rough-in before concrete, framing before insulation or finishes, and a final health and safety inspection.

Good to know

  • Give at least 48 hours' written notice before covering work that must be inspected and when work is complete for the final inspection.
  • Other forms may apply depending on the project: driveway, water and sewer connection, plumbing declaration and home warranty.
  • If your property is in a development permit area, you still need a development permit.
  • Contact: Planning Department, planning@lantzville.ca, 250-933-8093. Building Inspection Services: building@lantzville.ca, 250-933-8091.

Official forms and pages

The same question in other places

Nanaimo · Parksville · Qualicum Beach · Sechelt · Ladysmith · Gibsons

Building permits in British Columbia: how to apply, by municipality →

Sources

  1. Building Permit, District of Lantzville (read 2026-11-08)
  2. Building Bylaw No. 182, 2020 (PDF, consolidated), District of Lantzville (read 2026-11-08)
  3. Contact Information, District of Lantzville (read 2026-11-08)

Checked by script, not yet by a person: the official wording behind 7 of 8 facts was matched to the official text; 1 could not be confirmed. How answers are checked.