GovHandbook

North Saanich building permit fees

How much does a building permit cost?

North Saanich, British ColumbiaChecked against official textSources read 2026-11-05

Short answer

In North Saanich the building permit fee is 1¼% of the fair market value of construction. A plan processing fee is paid with the application: $250 for a new one-family dwelling, otherwise 50% of the estimated permit fee (at least $100, at most $2,000). Starting work without a permit doubles the fee.

Key facts

Lowest feeNo minimum building permit fee is stated. The smallest plan processing fee is $100, for work other than a new one-family dwelling; it is credited toward the permit fee.Building and Plumbing Bylaw No. 1150, Schedule A (PDF, consolidated March 18, 2019), Schedule A s. 1.2; Building and Plumbing Bylaw No. 1150, Schedule A (PDF, consolidated March 18, 2019), s. 5.9.2 · Wording matched the official text retrieved 2026-11-06
Official wording
shall be fifty percent (50%) of the
estimated permit fee required pursuant to section 2.1 but shall not exceed
$2,000.00 nor be less than $100.00.
A plan processing fee shall be a credit towards the building permit fee levied
How the fee is worked out1¼% of the fair market value of construction. The District works out the value from the plans using the most current Marshall Swift construction cost manual. The fee is doubled where construction began before a permit was issued.Building and Plumbing Bylaw No. 1150, Schedule A (PDF, consolidated March 18, 2019), Schedule A s. 2.1 · Wording matched the official text retrieved 2026-11-06
Official wording
shall be 1-1/4 percent of the
fair market value of construction covered by the permit.
The value of construction shall be calculated by the authority having jurisdiction using the
The permit fee is doubled where construction was commenced before a permit was
Application or plan review feeA plan processing fee is paid with the application: $250 for a new one-family dwelling; otherwise 50% of the estimated permit fee, at least $100 and at most $2,000. It counts as a credit toward the permit fee but is non-refundable.Building and Plumbing Bylaw No. 1150, Schedule A (PDF, consolidated March 18, 2019), Schedule A s. 1.1, 1.2; Building and Plumbing Bylaw No. 1150, Schedule A (PDF, consolidated March 18, 2019), s. 5.9.1, 5.9.2, 5.9.3 · Wording matched the official text retrieved 2026-11-06
Official wording
For a permit application to construct a new One-Family Dwelling:
$250.00
shall be accompanied by the
appropriate plan processing fee
A plan processing fee is non-refundable, and shall be forfeited and the
Other feesDemolition permit $100 (structure 92.9 m² or less), $200 (larger), $50 deconstruction. Plumbing $15 per fixture. Re-inspection after the second: $50. Temporary building permit $300. Damage surety deposit with the application: $500 (work of $10,000 to under $25,000) or $1,000 ($25,000 or more, and demolition).Building and Plumbing Bylaw No. 1150, Schedule A (PDF, consolidated March 18, 2019), Schedule A s. 2.9; Building and Plumbing Bylaw No. 1150, Schedule A (PDF, consolidated March 18, 2019), Schedule A s. 2.11.1, 2.4, 2.3, 2.8 · Wording matched the official text retrieved 2026-11-06
Official wording
If the structure is 92.9 m2 (1000 ft2) or less in area
$100.00
If the structure is more than 92.9 m2 (1000 ft2) in area
$200.00
Deconstruction
Damage - Surety Deposit
valued at $10,000 or greater, but less than $25,000
Each application for a building or demolition permit shall be accompanied by a surety
For each plumbing fixture
fee for each inspection after the
(for one year or any portion thereof)
ten percent (10%) of the original
How to payThe plan processing fee is paid with the application; the building permit fee is paid before the permit is issued. The District accepts cash, cheque or Interac, not credit cards.Building and Plumbing Bylaw No. 1150, Schedule A (PDF, consolidated March 18, 2019), s. 5.9.1, 5.10.1; Permits, Permit Fees · Wording matched the official text retrieved 2026-11-06
Official wording
An application for a building permit shall be accompanied by the
Before receiving a building permit for any building or structure, the owner or
his agent shall first pay to the Building Official the appropriate building
does not accept credit cards
BylawBuilding and Plumbing Bylaw No. 1150, Schedule A (fees), with ss. 5.9 and 5.10Building and Plumbing Bylaw No. 1150, Schedule A (PDF, consolidated March 18, 2019); Permits, Permit Fees · Wording matched the official text retrieved 2026-11-06
Official wording
SCHEDULE A
1. Plan Processing Fees
For Building Permit and Plumbing Permit fees see Section 5.9 of the Building and Plumbing Bylaw No. 1150

How it works

The District of North Saanich sets building permit fees in Schedule A of Building and Plumbing Bylaw No. 1150. The permit fee is a flat 1¼% of the fair market value of construction. The District works out that value from your plans using the most current Marshall Swift construction cost manual. No minimum permit fee is stated.

Steps

  1. Pay the plan processing fee with your application. It counts as a credit toward the permit fee but is non-refundable.
  2. Pay the permit fee before the permit is issued.
  3. The District accepts cash, cheque or Interac, not credit cards.

Good to know

  • The fee is doubled if construction began before a permit was issued.
  • Other fees: demolition permit $100 (structure 92.9 m² or less) or $200 (larger), plus $50 for deconstruction; plumbing $15 per fixture; temporary building permit $300; re-inspection after the second, $50.
  • A damage surety deposit is paid with the application: $500 for work of $10,000 to under $25,000, or $1,000 for $25,000 or more and for demolition.
  • A registered professional's certification of code compliance can reduce the fee.
  • The Property File Review fee is $75 plus GST from January 1, 2026. Sign permit fees are in Fees and Charges Bylaw No. 1471.
  • The fees are from the 2019 consolidation of the bylaw. Confirm current amounts with the building department at 250-655-5470.

Official forms and pages

The same question in other places

Sidney · Central Saanich · Highlands · Saanich · Langford · View Royal

Building permit fees in British Columbia, by municipality →

Sources

  1. Building and Plumbing Bylaw No. 1150, Schedule A (PDF, consolidated March 18, 2019) (read 2026-11-05)
  2. Permits, District of North Saanich (read 2026-11-05)
  3. Fees and Charges Bylaw No. 1471 (PDF) (read 2026-11-05)
  4. Property Information, District of North Saanich (read 2026-11-05)

Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.