I.5 zone in Spallumcheen: Soil Removal and Processing Zone
Main uses: Accessory buildings and structures, Manufacturing, processing, finishing, and storage of concrete products or ready mix concrete, rock, sand, and gravel, and stone products (or others of like character or kind), Manufacturing, processing, and storage of asphalt paving and roofing materials, Retail sale of products manufactured or processed on site, Silviculture, and 1 more.
Zone rules
| Main uses |
|
|---|---|
| Minimum lot area | 0.5 ha for manufacturing, processing and storage on parcels connected to a community sewer system; 1.0 ha for the same uses without community sewer; 4 ha for soil extraction |
| Minimum lot width | 45 m for manufacturing, processing, finishing and storage uses; soil extraction uses a frontage set in a general section of the bylaw |
| Maximum lot coverage | 65% of the lot area for all buildings and structures |
| Maximum height | 18 m |
| Front setback | 15 m |
| Rear setback | 8 m |
| Interior side setback | 6 m |
| Street side setback | 15 m where applicable |
| Other rules |
|
Source: Zoning Bylaw No. 1700, 2008 (consolidated with amendments for convenience only, through Bylaw No. 2192, 2026), s. 604 (read 2026-11-07)
Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. The Township marks the consolidation "for convenience only". The table of contents also lists L.H.2 (s. 805) and L.H.3 (s. 806) with broken bookmarks, but the body has no such sections; the body's s. 805 is L.H.4. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.
This zone as Markdown · JSON · all Spallumcheen zones · Report an error