West Kelowna building permits: when you need one and how to apply

Do I need a building permit, and how do I apply?

West Kelowna, British ColumbiaChecked against official textSources read 2026-11-05

Short answer

In West Kelowna, most projects on private property need a building permit from the City's Building Department before work starts. Apply in person at City Hall with the documents on the checklist for your project type. Call 778-797-8820 if you are unsure.

Key facts

Needed forMost projects on private property: new buildings, additions, interior and exterior alterations involving Building Code materials or systems, plumbing, chimneys and solid fuel appliances, retaining walls over 1.2 m, swimming pool fences, moved or temporary buildings, change of occupancy, and demolition.Sources differ: City page says retaining walls 'that are 1.2 meters or higher' need a permit; the bylaw (s. 8.1.13) says 'over 1.2 m'. Bylaw followed. Bylaw 0086 is the 2009 bylaw consolidated to Bylaw 0086.07 (July 25, 2023).Building Regulations Bylaw No. 0086, s. 8.1; Building permits and inspections · Wording matched the official text retrieved 2026-11-06
Official wording
Projects regulated by this bylaw include, but are not limited to:
Construction of new buildings;
Construction of retaining walls over 1.2 m (3.9 ft) in height
Construction of swimming pool fences;
Demolition of buildings or structures.
Permits must be obtained for most projects on private properties in the City of West Kelowna.
A building permit is required for retaining walls that are 1.2 meters or higher.
Not needed forBylaw 0086 does not apply to what the BC Building Code exempts, or to landscaping or surfacing of land (except retaining walls), decks or patios less than 0.6 m from the ground, docks or wharves (unless a building is on them), or site services in a bare land strata. A temporary construction site office needs no permit. The City says solar panels no longer need a permit unless structural upgrades need an engineer.Building Regulations Bylaw No. 0086, s. 5.1; Building permits and inspections, Solar Panel · Wording matched the official text retrieved 2026-11-06
Official wording
this bylaw does not apply to:
Landscaping or other surfacing of land, except retaining walls;
Decks or patios which are less than 0.6 metre from the ground
In addition to the exemptions specified in the Code, this bylaw does not apply to:
A permit is not required for a temporary construction site office or temporary
Building Permits are no longer required for Solar Panel Projects within the City of West Kelowna
a building permit from the City of West Kelowna is still required
How to applyIn person at City Hall, 3731 Old Okanagan Highway. Each permit type has a required-documents checklist; a City plan checker reviews the complete package and the permit is issued once approved.Building permits and inspections, Application Process · Wording matched the official text retrieved 2026-11-06
Official wording
Building Permit Applications must be submitted in person at City Hall.
Each permit type has a required documents checklist to help applicants through the process.
Once submitted, a city plan checker will review the completed application package.
What to submitCompleted application plus the checklist documents: site plan (BC Land Surveyor site plan if new construction is within 2 m of a property line, covenant or right of way), detailed digital drawings, state of title (no older than 3 months) in some cases, and sealed professional drawings where applicable. New homes, suites, pools and demolition have extra items.Building Permit Checklist, Standard application documents; Building permits and inspections, New Construction · Wording matched the official text retrieved 2026-11-06
Official wording
Current State of Title (no older than 3 months)
Required for new construction of any kind where parcel coverage is within 2 m of the property lines, covenants, easements, or statutory right of ways.
Digital Detailed Drawings Including:
BC Housing Warranty Registration or Owner Declaration
Septic design accepted by Interior Health and Registered Onsite Wastewater Practitioner (ROWP) Drawings
Processing timeTargets for a complete application, in business days: small residential projects (decks, pools, retaining walls) 10 days; single-family dwelling or duplex 15 days; multifamily 1 month; small commercial projects 15 days; new commercial or industrial 1 month; Housing Incentive Program projects 5 days.Building permits and inspections, Target Permitting Timelines · Wording matched the official text retrieved 2026-11-06
Official wording
Housing Incentive Program projects | 5 days
Residential small project (decks, pools, retaining walls, etc.) | 10 days
Residential Single-Family Dwelling or Duplex | 15 days
Residential Multifamily | 1 month
Commercial or Industrial New Projects | 1 month
Suggested timelines are based on standard business days and do not include weekends or statutory holidays.
InspectionsCall 778-797-8820 or email building@westkelownacity.ca with site address, permit number, contact name and number, type of inspection and access instructions. Next-day requests must be received before 3 p.m. the day prior; a.m./p.m. cannot be guaranteed. No weekend or statutory holiday inspections and no call-backs.Building permits and inspections, Building Inspections · Wording matched the official text retrieved 2026-11-06
Official wording
Inspections can be booked by calling 778-797-8820, or emailing building@westkelownacity.ca
Next day inspection requests must be received before 3 p.m. the day prior
Please note we do not provide inspections on weekends or statutory holidays.
Due to the volume of requests, we do not provide call backs to schedule.
ContactBuilding Department, Development Services, City Hall, 3731 Old Okanagan Highway, West Kelowna, B.C. V4T 0G7; 778-797-8820; building@westkelownacity.ca.Sources differ: The Business Licences page lists the Building Department at 778-797-8811; the building permit page, checklist and inspection guide all give 778-797-8820.Building permits and inspections, Contact us · Wording matched the official text retrieved 2026-11-06
Official wording
Building Department West Kelowna City Hall 3731 Old Okanagan Highway West Kelowna, B.C. V4T 0G7 778-797-8820 building@westkelownacity.ca
BylawCity of West Kelowna Building Regulation Bylaw No. 0086, 2009Building Regulations Bylaw No. 0086, s. 1 Title · Wording matched the official text retrieved 2026-11-06
Official wording
CITY OF WEST KELOWNA BUILDING REGULATION BYLAW NO. 0086, 2009

How it works

The City's Building Regulations Bylaw 0086 requires a permit for most projects on private property. It names new buildings, additions, interior and exterior alterations involving Building Code materials or systems, plumbing, chimneys and solid fuel appliances, retaining walls over 1.2 m, swimming pool fences, moved or temporary buildings, change of occupancy, and demolition.

The bylaw does not apply to what the BC Building Code exempts, landscaping or surfacing of land (except retaining walls), decks or patios less than 0.6 m from the ground, docks or wharves (unless a building is on them), or site services in a bare land strata. A temporary construction site office needs no permit. Solar panels no longer need a City permit unless structural upgrades need an engineer; an electrical permit from Technical Safety BC is still required.

Steps

  1. Pick your project type on the City's page and get its checklist of required documents.
  2. Check your zone on WestMap, or call Development Services at 778-797-8830.
  3. Gather the documents and apply in person at City Hall.
  4. A City plan checker reviews the complete package and the permit is issued once approved.
  5. Book inspections with 778-797-8820 or building@westkelownacity.ca. Give the site address, permit number, contact name and number, type of inspection and access instructions. A next-day request must arrive before 3 p.m. the day before; morning or afternoon times cannot be guaranteed.

Good to know

  • Inspections are not done on weekends or statutory holidays, and the Building Department does not call back.
  • The timelines above are targets, not guarantees. Missing documents, referrals to other departments or a Development Permit can lengthen them.
  • The City page says retaining walls "1.2 meters or higher" need a permit, while the bylaw says "over 1.2 m". Confirm with the Building Department if yours is close.
  • The CityView Portal is a tracking and information tool for development applications. No City page says building permits can be submitted through it.

What you'll need

  • Building Permit Application and the checklist for your project type
  • Site plan (a BC Land Surveyor site plan if new construction is within 2 m of a property line, covenant or right of way)
  • State of title no older than 3 months, in some cases
  • Detailed digital drawings, and sealed professional drawings where applicable

Official forms and pages

The same question in other places

Peachland · Kelowna · Lake Country · Summerland · Penticton · Vernon

Building permits in British Columbia: how to apply, by municipality →

Sources

  1. Building permits and inspections, City of West Kelowna (read 2026-11-05)
  2. Building Regulations Bylaw No. 0086 (PDF) (read 2026-11-05)
  3. Building Permit Checklist (PDF) (read 2026-11-05)
  4. Fees and Charges Bylaw No. 0028, Schedule 2 (PDF) (read 2026-11-05)
  5. Zoning Bylaw, City of West Kelowna (read 2026-11-05)

Checked by script, not yet by a person: the official wording behind 8 of 8 facts was matched to the official text. How answers are checked.