GovHandbook

Vernon building permits: when you need one and how to apply

Do I need a building permit, and how do I apply?

Vernon, British ColumbiaChecked against official textSources read 2026-11-05

Short answer

Yes, in the City of Vernon you need a building permit to construct, alter, repair, add to, demolish or relocate a building or structure, including renovations and secondary suites. Apply online through the City's portal or on paper at 3001 32 Avenue. Digital PDF plans are required.

Key facts

Needed forA building permit is needed to construct, alter, repair, add to, demolish, remove or relocate a building or structure, or change its use or occupancy. This includes new buildings, renovations, secondary suites and structural changes. Swimming pools and retaining walls (except low ones on single-family lots) also need permits.Building Permit Application, Building Permit Application page; Building Bylaw 5900, s. 4.1; Building Bylaw 5900, s. 11.1 and 14.1; Building Bylaw 5900, s. 3.3(c) · Wording matched the official text retrieved 2026-11-06
Official wording
A Building Permit is required for the construction, alteration, repair, or addition to a building or structure.
This includes new buildings, renovations, secondary suites, and structural changes.
A person must not commence or continue any construction, alteration, excavation, reconstruction, demolition, removal, relocation or change the use or
No person may construct, or structurally repair, a retaining wall without a
structurally repair, a swimming pool without a valid building permit.
a retaining wall supporting soil that is less than 1.2
Not needed forNo permit for: an accessory building under 10 m² that creates no hazard (adding plumbing needs a permit); a fence; like-for-like replacement of roofing, siding, fixtures, cabinetry, flooring, windows or doors in the same opening; a deck within 600 mm of grade all round; trellises and arbours on single-family lots.Building Permit Application, Do I Need a Permit?; Building Bylaw 5900, s. 3.3(a)-(c) · Wording matched the official text retrieved 2026-11-06
Official wording
Accessory buildings with an area less than 10 m² and that does not create a hazard.
Adding plumbing to an accessory building will require a building permit.
Decks that are within 600mm of grade around the entire deck.
Replacing windows or doors in the same rough opening.
Fencing and other landscaping.
an accessory building with a floor area of less than 10 square metres;
a trellis, an arbour, a retaining wall supporting soil that is less than 1.2
How to applyOnline through the City's web portal (MyCity account), or on paper in person at the Community Services Building, 3001 32nd Avenue. Digital copies of all documents and drawings, in PDF, must be provided before an application is accepted.Building Permit Application, How to Apply · Wording matched the official text retrieved 2026-11-06
Official wording
Submit your application through our secure web portal:
Community Services Building 3001 32nd Avenue
All plans and drawings must be submitted in PDF format.
What to submitPer the City checklist: MyCity login, owner details, construction value and floor area, description of work, Damage to Public Works form, title search dated within 30 days, Owner's Undertaking, new home registration (new construction), and design drawings with a site plan. Complex buildings also need drawings sealed by a professional engineer or architect.Building Permit checklist, Building Permit Checklist; Building Bylaw 5900, s. 10.4(c)-(d) · Wording matched the official text retrieved 2026-11-06
Official wording
Title Search dated within 30 days of application (required).
Owner’s Undertaking completed form (required)
Design Drawings including Site Plan (required)
Complete sets of drawings signed, sealed and dated by Professional Engineer or Architect (as required)
include a copy of a title search for the relevant property made within 30
include a copy of a survey plan prepared by a British Columbia land
Processing timeNot confirmed. The published pages do not say how long a permit takes.
InspectionsBook by calling 250-550-3592 or using the online Building Inspection form. For simple buildings the owner must give at least 48 hours' notice when requesting an inspection; for complex buildings, at least 24 hours' online or written notice for the pre-construction and pre-occupancy meetings.Building Permit Application, Application Status & Next Steps; Building Bylaw 5900, s. 10.32 and 10.36 · Wording matched the official text retrieved 2026-11-06
Official wording
Inspections can be scheduled by calling 250-550-3592 or submitting a request using the online Building Inspection form
the owner must give at least 48 hours’ notice to the City when requesting an inspection
give at least 24 hours’ online or written notice to the City when requesting
ContactBuilding Permits (Planning & Community Services), 3001 32 Ave., Vernon BC V1T 2L8; phone 250-550-3634; Monday to Friday, 8:30 a.m. to 4:30 p.m. Email buildingcounter@vernon.ca.Contact Us, Contact Us page; Building Permit checklist, Building Permit Checklist header · Wording matched the official text retrieved 2026-11-06
Official wording
Monday - Friday: 8:30 am - 4:30 pm
3001 32 Ave. Vernon, BC V1T 2L8 250-550-3634
3001 32 Avenue, Vernon BC V1T 2L8 Phone:(250) 550-3634 Email: buildingcounter@vernon.ca www.vernon.ca  MyCity Account Login Credentials (required). If you don't already have an account: register here
BylawCity of Vernon Building Bylaw No. 5900, 2021Building Bylaw 5900, s. 1.1 · Wording matched the official text retrieved 2026-11-06
Official wording
City of Vernon Building Bylaw No. 5900, 2021

How it works

Under Building Bylaw 5900, you need a building permit to construct, alter, repair, add to, demolish, remove or relocate a building or structure, or to change its use or occupancy. That covers new buildings, renovations, secondary suites and structural changes. Swimming pools also need permits, as do retaining walls except low ones on single-family lots.

Steps

  1. Check the list below, or call 250-550-3634 if you are unsure.
  2. Gather the City's checklist items: MyCity login, owner details, construction value and floor area, a description of the work, the Damage to Public Works form, a title search dated within 30 days, the Owner's Undertaking, new home registration (new construction), and design drawings with a site plan. Complex buildings also need drawings sealed by a professional engineer or architect.
  3. Apply online through MyCity, or on paper at the Community Services Building, 3001 32 Avenue. Digital PDF copies of all documents and drawings must be provided before an application is accepted.
  4. Once approved, the City emails the fee and payment instructions. The permit is issued after payment.
  5. Book inspections on 250-550-3592 or with the online Building Inspection form. For a simple building, give at least 48 hours' notice. For a complex building, give at least 24 hours' online or written notice for the pre-construction and pre-occupancy meetings. After the approved inspections, the Occupancy Permit is emailed to you.

Good to know

  • No permit is needed for: an accessory building under 10 m² that creates no hazard (adding plumbing needs a permit); a fence; like-for-like replacement of roofing, siding, fixtures, cabinetry, flooring, windows or doors in the same opening; a deck within 600 mm of grade all round; or trellises and arbours on single-family lots.
  • Replacing a whole deck, changing its size, or fitting a window or door of a different size does need a permit.
  • Retaining walls: the City's page says a permit is required for walls 1.2 m or higher, where there is substantial surcharge, or in a sensitive land area.
  • An application expires 180 days after a complete application is received if no permit has issued, unless the delay is the City's.
  • Re-inspections and after-hours inspections carry extra fees.

What you'll need

  • Building Permit checklist (City PDF)
  • Site plan and design drawings as digital PDF files
  • Title search dated within 30 days

Official forms and pages

The same question in other places

Coldstream · Lake Country · Spallumcheen · Armstrong · Lumby · Enderby

Building permits in British Columbia: how to apply, by municipality →

Sources

  1. Building Permit Application, City of Vernon (read 2026-11-05)
  2. Building Bylaw 5900 (PDF) (read 2026-11-05)
  3. Building Permit checklist (PDF) (read 2026-11-05)
  4. Contact Us, City of Vernon (read 2026-11-05)

Checked by script, not yet by a person: the official wording behind 7 of 8 facts was matched to the official text; 1 could not be confirmed. How answers are checked.