I-2 zone in 100 Mile House: Heavy Industrial
Sites for industrial businesses involving manufacturing, primary processing, resource extraction and outside storage that are not generally compatible with non-industrial uses.
Zone rules
| Purpose | Sites for industrial businesses involving manufacturing, primary processing, resource extraction and outside storage that are not generally compatible with non-industrial uses. |
|---|---|
| Main uses |
|
| Also allowed (secondary uses) |
|
| Minimum lot area | 0.8 hectares |
| Minimum lot width | 40 m |
| Maximum lot coverage | 40% of the parcel area (all buildings and structures) |
| Maximum density | Floor area ratio of 0.75 |
| Maximum height | 18 m, not more than 2 storeys (all buildings and structures) |
| Maximum height, accessory buildings | 18 m, not more than 2 storeys (all buildings and structures) |
| Front setback | 7.5 m (all parcel lines) |
| Rear setback | 7.5 m (all parcel lines) |
| Interior side setback | 7.5 m (all parcel lines) |
| Street side setback | 7.5 m (all parcel lines) |
| Accessory building setbacks | 7.5 m from all parcel lines |
| Other rules | One caretaker residence of up to 90 m² is permitted per site; it may be a mobile home or within a principal building. |
Source: Zoning Bylaw No. 1466, 2026 (consolidated version including Bylaws No. 1470 and 1483), s. 12.2 (read 2026-11-08)
Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. The District's consolidation is "for convenience only"; it asks readers to refer to the original bylaws. CD-2 is shown in the bylaw as "Repealed" and is not listed. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.
This zone as Markdown · JSON · all 100 Mile House zones · Report an error