GovHandbook

Abbotsford building permits: when you need one and how to apply

Do I need a building permit, and how do I apply?

Abbotsford, British ColumbiaChecked against official textSources read 2026-11-05

Short answer

In the City of Abbotsford, most construction of a building or structure needs a building permit before work starts, and the property owner is responsible for getting it even if a contractor does the work. Apply through the City's online permit portal, or call the Building Permits Division at 604-864-5525.

Key facts

Needed forMost construction of a building or structure. Examples: a sundeck or carport enclosure, a retaining wall 1.2 m or higher, a swimming pool, adding or removing a secondary suite or coach house, any structural change, and any change to a floor or roof plan. Plumbing work needs a separate plumbing permit.Building Bylaw, 2018 (No. 2883-2018), s. 28 and s. 29 · Wording matched the official text retrieved 2026-11-06
Official wording
every person must apply for and obtain a Building Permit before commencing the Construction of any Building or Structure
a retaining wall which is 1.2 m in height or greater
a Sundeck, the enclosure of an area above or below an existing Sundeck, or the enclosure of a carport;
Construction or removal of an additional Suite, including but not limited to a Secondary Suite or Coach House;
any Construction which changes the plan view of any floor of a Building or the roof of the Building
every person must apply for and obtain a Plumbing Permit before commencing the Construction of any Plumbing work
Not needed forA detached building or structure under 10 m² (it must still follow zoning and other bylaws); a tent structure under 100 m² up for less than 15 days in a row; interior alterations to finished space in a single family dwelling with no structural change; replacing windows, siding, gutters or roofs on a single family dwelling, unless the work changes a floor or roof plan, encloses a carport or sundeck, or is structural; structures in the City's right of way or boulevard.Building Bylaw, 2018 (No. 2883-2018), s. 16; Building Permits, When a Permit is Not Required · Wording matched the official text retrieved 2026-11-06
Official wording
A Building Permit is not required for:
a detached Building or Structure having an area, in plan, of less than 10 m2, but such Building or Structure must comply with this Bylaw
a portable or temporary tent structure that is less than 100 m2 in area individually
interior Alterations to existing finished spaces in a single family dwelling where there is no structural Alteration, including partial demolition;
exterior Alteration in a single family dwelling limited to replacement of windows, siding, gutters or roofs
Buildings and Structures that are located in the City's right of way or Boulevard
exterior Alteration in a single family dwelling limited to replacement of windows, siding, gutters or
excluding work described under Section 28 (c), Section 28 (d), and Section 28 (n);
Replacement of sinks, faucets, or toilets (provided their location does not change);
Painting, flooring, and/or installation of cabinetry.
How to applyApply online through the City's building permit portal. Pay the application fee when you apply. City pages for residential and secondary suite permits also say to come to City Hall (1st floor, 32315 South Fraser Way) with the form and fees.Sources differ: City pages disagree: the Residential page says online applications are accepted for all building permits, but the same page and the Secondary Suites page also say 'please come to City Hall to apply for your permit with your application fees'. Portal link on the Building Permits page: services.abbotsford.ca/portal.Building Permits, Building Permits page; Residential building permits, Residential page · Wording matched the official text retrieved 2026-11-06
Official wording
Submit your building permit application online!
online applications are accepted for all building permits
please come to City Hall to apply for your permit with your application fees
What to submitA form with scaled drawings and specifications, a zoning and Building Code analysis, a title search made within 30 days, a site plan, floor plans, and elevations of all sides. The City's submission checklists list exact documents by project type; missing documents can get the application rejected.Building Bylaw, 2018 (No. 2883-2018), s. 35 (Standard Buildings); Residential building permits, Residential page · Wording matched the official text retrieved 2026-11-06
Official wording
copies in scale, size, legibility and format, as specified by the Building Official
zoning and Building Code analysis
a copy of a title search made within 30 days of the date of the application
floor plans showing the dimensions and uses of all areas
elevations of all sides of the Building or Structure
missing the correct documents may result in your application being rejected and application fees being forfeited.
Processing timeNot confirmed. The City's pages do not state how long a permit takes.
InspectionsBook online only, using the 8-digit permit number; bookings are not taken by phone, voicemail or email. At least 24 hours' notice is needed. The City aims to book within 1 to 2 business days; AM or PM only, no set time.Inspections, Inspections page · Wording matched the official text retrieved 2026-11-06
Official wording
All inspections must be scheduled online.
At a minimum, 24-hour notice is needed for an inspection to be scheduled.
every effort is made to ensure inspections can be booked within 1-2 business days
Inspection bookings will not be accepted by phone, voicemail or email.
ContactBuilding Permits & Licences Division, City Hall, 1st floor, 32315 South Fraser Way: 604-864-5525, building-info@abbotsford.ca.Land Use Information Letters, Land Use Information Letters page; Fences in Residential Areas FAQ, footer of Fences FAQ (2021) · Wording matched the official text retrieved 2026-11-06
Official wording
Building Department at building-info@abbotsford.ca or 604-864-5525
Building Permits & Licences
1st Floor, 32315 South Fraser Way, Abbotsford, BC
BylawBuilding Bylaw, 2018 (Bylaw No. 2883-2018)Building Bylaw, 2018 (No. 2883-2018), title · Wording matched the official text retrieved 2026-11-06
Official wording
City of Abbotsford - Building Bylaw, 2018- - - Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc | License Bylaw No. 2883-2018 ## Building Bylaw, 2018 Consolidated and printed by authority of the
TITLE: City of Abbotsford - Building Bylaw, 2018 City of Abbotsford - Building Bylaw, 2018- - - Search Results | Clear Search | Previous (in doc) | Next (in doc) | Prev Doc | Next Doc

How it works

Under the Building Bylaw, you must apply for and get a building permit before you start building any building or structure. Examples include a sundeck or carport enclosure, a retaining wall 1.2 m or higher, a swimming pool, adding or removing a secondary suite or coach house, any structural change, and any change to a floor or roof plan. Plumbing work needs its own plumbing permit.

A permit is not needed for:

  • a detached building or structure under 10 m² (it must still follow zoning and other bylaws)
  • interior alterations to finished space in a single family dwelling with no structural change
  • replacing windows, siding, gutters or roofs on a single family dwelling, unless the work changes a floor or roof plan, encloses a carport or sundeck, or is structural
  • a tent structure under 100 m² up for less than 15 days in a row
  • structures in the City's right of way or boulevard

Steps

  1. Find your project type on the City's Building Permits page and read its application guide and checklists.
  2. Gather what the bylaw asks for: a form, scaled drawings and specifications, a zoning and Building Code analysis, a title search made within 30 days, a site plan, floor plans and elevations of all sides. Missing documents can get the application rejected.
  3. Apply through the online portal and pay the application fee. Staff may ask for more information.
  4. Do not start work until the permit is issued.
  5. Book each inspection online using your 8-digit permit number.

Good to know

  • The City's pages say both that online applications are accepted and to come to City Hall to apply. If the portal does not suit your project, call to confirm.
  • No building permit is issued until any Development Permit required under the Official Community Plan has been issued.
  • Inspections are booked online only (not by phone, voicemail or email), with at least 24 hours' notice. The City aims to book within 1 to 2 business days, morning or afternoon only.
  • Work must begin and be inspected within six months of the permit being issued and must not stop for more than 12 months, or the permit may be cancelled.
  • The City does not state a review time on the pages read.

What you'll need

  • The submission checklist and drawing checklist for your project type (residential new build, addition, alteration, secondary suite, pool and others)
  • Letter of Authorization if an agent applies for you

Official forms and pages

The same question in other places

Mission · Township of Langley · Chilliwack · Langley City · Maple Ridge · Pitt Meadows

Building permits in British Columbia: how to apply, by municipality →

Sources

  1. Building Permits, City of Abbotsford (read 2026-11-05)
  2. Residential building permits, City of Abbotsford (read 2026-11-05)
  3. Building Bylaw, 2018 (No. 2883-2018), City of Abbotsford (read 2026-11-05)
  4. Fees and Charges Bylaw, 2006 (Consolidated), Schedule G Building (read 2026-11-05)
  5. Inspections, City of Abbotsford (read 2026-11-05)
  6. Land Use Information Letters, City of Abbotsford (read 2026-11-05)
  7. Fences in Residential Areas FAQ, City of Abbotsford (read 2026-11-05)

Checked by script, not yet by a person: the official wording behind 7 of 8 facts was matched to the official text; 1 could not be confirmed. How answers are checked.