Mission building permits: when you need one and how to apply
Do I need a building permit, and how do I apply?
In the City of Mission you need a building permit for new construction, additions (including decks), renovations such as a secondary suite, detached buildings over 15 m², pool houses, pools, demolition and solar panels. Roofing, painting and flooring do not need one. Call Inspection Services at 604-820-3726 if unsure.
Key facts
| Needed for | New construction, additions (including adding or increasing a deck), alterations and renovations (such as a secondary suite or finishing a basement), plumbing and sprinkler work, detached accessory buildings and structures over 15 m², pool houses (sheds) of any size, retaining structures over 0.6 m, demolition, moving a building, solar panels, swimming pools, change of use and tenant improvements.Building Permits, Building Permits page; Building Bylaw 3590-2003 (PDF, consolidated), s. 5.1 · Wording matched the official text retrieved 2026-11-06Official wordingA building permit is required for all types of buildings for: Detached accessory buildings and structures greater than 15m2 (161.4ft2), such as: Retaining structures greater than 0.6m Installation of solar panels Installation of a swimming pool Demolition of a building Pool houses (sheds) regardless of size No person shall commence or continue any work related to Construction unless that person has a valid Permit authorizing same. |
|---|---|
| Not needed for | Roofing, cladding, painting, flooring and minor plumbing repairs. Bylaw: no permit for a single-storey accessory building or unmodified shipping container serving a one- or two-family home if 15 m² (161.4 ft²) or less. The City page says accessory buildings under 15 m² are exempt unless they create a hazard, but also lists pool houses (sheds) as needing a permit regardless of size.Building Permits, Building Permits page; Building Bylaw 3590-2003 (PDF, consolidated), s. 7.19(a) · Wording matched the official text retrieved 2026-11-06Official wordingA Permit is NOT required for: Minor Plumbing Repairs Accessory buildings less than 15m2 (161.4ft2), unless they create a hazard No Permit is required: does not exceed 15 square meters (161.4 square feet) in |
| How to apply | Start with a Pre-Submission Review: the City checks that planning and engineering matters are settled and the application is complete before accepting it. Application forms are in the City's Form Library; a non-refundable application fee is paid with the application.Pre-Submission Review, Pre-Submission Review page; Building Permit Checklists, Checklists page; Building Bylaw 3590-2003 (PDF, consolidated), s. 7.1(f) · Wording matched the official text retrieved 2026-11-06Official wordingprior to accepting a building permit application incomplete applications cannot be accepted All referenced forms in the checklist can be found in our Form Library be accompanied by payment of the non-refundable Permit application fee |
| What to submit | Application form, owner's undertaking, title search printed within 30 days, registered covenants and easements, and at least 2 sets of scaled plans (site plan, floor plans, elevations, sections, details). Extra items depend on the project, such as sealed engineering, stormwater or sprinkler plans; the City has a checklist for each project type.Accessory Building Submission Checklist, Accessory Building checklist; Building Bylaw 3590-2003 (PDF, consolidated), s. 7.1(e), (j) · Wording matched the official text retrieved 2026-11-06Official wordingTitle Search (Copy of title printed within 30 days of application date) 2 Sets of design plans (Site plan, foundation plan, floor plans, elevations, sections and details) at least 2 copies of the be accompanied by a copy of a title search made within 30 days of the date of the |
| Processing time | No fixed time is stated. After the application is accepted and the application fee paid, it is given a permit number and placed in a queue for detailed code review. The City posts current wait times on its website.Building Permit Wait Times, Wait Times page; Pre-Submission Review, Pre-Submission Review page · Wording matched the official text retrieved 2026-11-06Official wordingconsidered in-queue for detailed code review Once an application is accepted and the non-refundable application fee paid, a building permit number is assigned the application is assigned a building permit number and placed into the queue for review |
| Inspections | Book online with the inspection booking tool, using the 8-digit permit number; each permit number needs its own booking. 24 hours' notice is required; requests after 3:00 p.m. are processed the next business day. To cancel or reschedule, phone 604-820-3726 by 9:00 a.m. on the inspection day.Inspections, Inspections page; Building Bylaw 3590-2003 (PDF, consolidated), s. 6.1(c) · Wording matched the official text retrieved 2026-11-06Official wordingAll inspections must be booked by using the online inspection booking tool. 24 hours notice is required in order for inspections to be properly scheduled after the cut-off time of 3:00 pm will be processed the following business day To cancel or reschedule an inspection please call 604-820-3726 by 9:00 am on the date of the scheduled inspection. give to the Building Official at least 24 |
| Contact | Inspection Services (Building Inspection), Welton Common Building, 7337 Welton Street: 604-820-3726, iservices@mission.ca. Office hours Monday to Friday, 8:00 a.m. to 4:30 p.m.Building Permits, Building Permits page; Inspections, Inspections page · Wording matched the official text retrieved 2026-11-06Official wordingcontact the Building Inspection Division at iservices@mission.ca or (604)820-3726 The Building Inspection Department is located in the Welton Common Building at 7337 Welton Street, Mission, BC. 8:00 am to 4:30 pm |
| Bylaw | Building Bylaw 3590-2003Building Bylaw 3590-2003 (PDF, consolidated), title; Building Permits, Building Permits page · Wording matched the official text retrieved 2026-11-06Official wordingBUILDING BYLAW 3590-2003 This document is a consolidation of "District of Mission Building Bylaw 3590-2003" with the The City of Mission regulates construction under Building Bylaw 3590-2003. |
How it works
The City of Mission regulates construction under Building Bylaw 3590-2003 and the BC Building Code. Inspection Services reviews applications and inspects the work. No one may start construction work without a valid permit.
A permit is needed for new construction, additions (including adding or increasing a deck), alterations and renovations (such as a secondary suite or finishing a basement), plumbing and sprinkler work, detached buildings over 15 m², pool houses of any size, retaining structures over 0.6 m, demolition, moving a building, solar panels, swimming pools, change of use and tenant improvements.
Steps
- Check whether your project needs a permit, or ask Inspection Services.
- Start with a Pre-Submission Review. The City checks that planning and engineering matters are settled and the application is complete before it accepts it.
- Pick the checklist for your project type and gather the forms and plans from the Form Library.
- Pay the non-refundable application fee. The application then gets a permit number and joins the queue for detailed code review.
- Pay the balance of the permit fee before the permit issues, then book inspections online with your 8-digit permit number (each permit number needs its own booking).
Good to know
- No permit is needed for roofing, cladding, painting, flooring or minor plumbing repairs.
- Accessory buildings: the bylaw exempts a single-storey accessory building or unmodified shipping container serving a one- or two-family home if it is 15 m² (161.4 ft²) or less. The City's page also lists pool houses (sheds) as needing a permit regardless of size, so confirm with Inspection Services before building one.
- Inspections need 24 hours' notice; requests after 3:00 p.m. are processed the next business day. To cancel or reschedule, phone 604-820-3726 by 9:00 a.m. on the inspection day.
- All new construction needs an automatic sprinkler system under Fire Sprinkler Bylaw 5679-2017; renovations, additions and accessory buildings may be affected.
- Electrical and gas permits come from Technical Safety BC (1-866-566-7233), not the City.
- Current review wait times are on the City's wait times page; they change, so check before you apply.
What you'll need
- Building Permit Application form and Owner's Undertaking form (from the City's Form Library)
- A title search printed within 30 days, plus copies of registered covenants and easements
- At least 2 sets of scaled plans (site plan, floor plans, elevations, sections, details), with sealed engineering, stormwater or sprinkler plans where the checklist for your project asks
Official forms and pages
The same question in other places
Abbotsford · Township of Langley · Maple Ridge · Langley City · Pitt Meadows · Chilliwack
Building permits in British Columbia: how to apply, by municipality →
Sources
- Building Permits, City of Mission (read 2026-11-05)
- Pre-Submission Review, City of Mission (read 2026-11-05)
- Building Permit Checklists, City of Mission (read 2026-11-05)
- Accessory Building Submission Checklist (PDF), City of Mission (read 2026-11-05)
- Building Permit Wait Times, City of Mission (read 2026-11-05)
- Inspections, City of Mission (read 2026-11-05)
- Building Bylaw 3590-2003 (PDF, consolidated), City of Mission (read 2026-11-05)
Checked by script, not yet by a person: the official wording behind 8 of 8 facts was matched to the official text. How answers are checked.