GovHandbook

Mission building permit fees

How much does a building permit cost?

Mission, British ColumbiaChecked against official textSources read 2026-11-05

Short answer

In the City of Mission a building permit costs $177 for work up to $5,000, plus $13.50 per $1,000 of construction value from $5,000 to $50,000, with lower rates above. A non-refundable application fee ($177 to $3,000, depending on the project) is paid on application.

Key facts

Lowest fee$177 for construction value up to $5,000. Non-residential buildings have higher minimums: $590 for an alteration or minor addition, $3,000 for a new building or major addition.Building Bylaw 3590-2003 (PDF, consolidated through Bylaw 6420-2026), Schedule A, Schedule A, s. 1(a), (c), (d) · Wording matched the official text retrieved 2026-11-06
Official wording
where the value of Construction does not exceed $5,000 shall be, $177.00
A minimum of $590.00 for the alteration of, or minor addition
A minimum of $3,000.00 for any new building or major building addition that is
How the fee is worked out$177 up to $5,000 of construction value, plus per $1,000 (or part): $13.50 from $5,000 to $50,000; $11.75 from $50,000 to $150,000; $10.25 from $150,000 to $500,000; $9.00 over $500,000. Fee is increased by 100% (or $250 if greater) when work starts before the permit.Building Bylaw 3590-2003 (PDF, consolidated through Bylaw 6420-2026), Schedule A, Schedule A, s. 1(a) and s. 2 · Wording matched the official text retrieved 2026-11-06
Official wording
over $5,000.00 and $13.50 up to $50,000.00, plus
over $50,000.00 and $11.75 up to $150,000.00, plus
over $150,000.00 $10.25 and up to $500,000.00, plus
over $500,000.00. $9.00
increased by 100 % of the Permit fee or $250.00, whichever is greater
Application or plan review feeNon-refundable, paid with the application: $177 for an alteration or minor addition (under 25% of floor area) to a house or duplex, an accessory building or an agricultural building; $1,200 for a new house or duplex or a major addition; $400 other alterations; $3,000 other new buildings. It is credited against the permit fee when the permit issues.Building Bylaw 3590-2003 (PDF, consolidated through Bylaw 6420-2026), Schedule A, Schedule A, s. 3; Building Bylaw 3590-2003 (PDF, consolidated through Bylaw 6420-2026), Schedule A, s. 7.18(c) · Wording matched the official text retrieved 2026-11-06
Official wording
single family dwelling or duplex building; $177.00
i. a new single family or duplex dwelling; or $1,200.00
3 (c) $400.00
Per Permit for any other new building or major addition not included in clause $3,000.00
Where a Permit is issued, the Permit fee will be reduced by the application fee amount paid.
Other feesPlumbing $16.75 per fixture ($150 minimum if a plumbing-only permit); demolition $250; re-inspection $150; permit renewal $177; secondary suite inspection $350. Security and compliance deposit: $5,000 for a new house or duplex, $1,000 for a major addition.Building Bylaw 3590-2003 (PDF, consolidated through Bylaw 6420-2026), Schedule A, Schedule A, ss. 7, 9, 13, 14, 15(e), 17(a) · Wording matched the official text retrieved 2026-11-06
Official wording
Plumbing, involving the installation of fixtures, for each fixture $16.75
the minimum fee payable for a Plumbing (b) $150.00
The fee for a demolition permit shall be $250.00
Re-inspection Fee $150.00
Building Permit Renewal fee $177.00
Secondary Suite Inspection to determine building upgrade requirements to add $350.00
7 (a) New Single-Family Dwelling or Duplex $5,000.00
Major Additions to a Single-Family Dwelling or Duplex (more than 25% of the $1,000.00
How to payThe application fee is paid on application, and the Schedule A security and compliance deposit is included with the application. The permit fee (less the application fee) is paid before the permit issues, with Development and Amenity Cost Charges at issuance. At 7337 Welton Street: cash, debit or cheque payable to the City of Mission; no credit card or e-transfer currently.Building Permits, Building Permits page; Inspections, Inspections page, payment options; Building Bylaw 3590-2003 (PDF, consolidated through Bylaw 6420-2026), Schedule A, s. 7.18(d) · Wording matched the official text retrieved 2026-11-06
Official wording
Applications are subject to a non-refundable application fee, a building permit fee at issuance based on the value of construction, and refundable deposits (securities).
Cash / Debit / Cheque (payable to the City of Mission)
NO CREDIT CARD or E-TRANSFER payment option available currently
The application fee, as set out in Schedule "A", must be paid upon application for
The following security and compliance deposits shall be included at the time of
must be paid upon application for
BylawBuilding Bylaw 3590-2003, Schedule A (Schedule of Fees and Charges), effective January 1, 2026Sources differ: The Building Permits page twice refers to 'Schedule A of Building Bylaw 3950-2003'; the bylaw itself is 3590-2003 (the page appears to have the digits transposed). Bylaw followed. Last fee amendment 6382-2025 (Dec 15, 2025).Building Bylaw 3590-2003 (PDF, consolidated through Bylaw 6420-2026), Schedule A · Wording matched the official text retrieved 2026-11-06
Official wording
SCHEDULE OF FEES AND CHARGES
Effective January 1, 2026

How it works

Building Bylaw 3590-2003, Schedule A, sets the City of Mission's building charges: a non-refundable application fee, the permit fee, and a security and compliance deposit. The permit fee is based on construction value. Non-residential buildings have higher minimums: $590 for an alteration or minor addition, $3,000 for a new building or major addition.

Good to know

  • Application fee (non-refundable, paid with the application): $177 for an alteration or minor addition (under 25% of floor area) to a house or duplex, an accessory building or an agricultural building; $1,200 for a new house or duplex or a major addition; $400 for other alterations; $3,000 for other new buildings. It is credited against the permit fee when the permit issues.
  • Security and compliance deposit: $5,000 for a new house or duplex, $1,000 for a major addition. It is included with the application.
  • Plumbing: $16.75 per fixture ($150 minimum for a plumbing-only permit). Where a project has fixtures, the building permit fee includes the fixture charges.
  • Other fees: demolition $250; re-inspection $150; permit renewal $177; secondary suite inspection $350.
  • Starting work before the permit issues increases the fee by 100%, or $250 if that is greater.
  • If drawings must be resubmitted a second time, a fee of 25% of the permit fee applies (maximum $3,000).
  • Development Cost Charges, Amenity Cost Charges and School Site Acquisition Charges are payable at permit issuance under separate bylaws.
  • Pay the permit fee (less the application fee) before the permit issues. At 7337 Welton Street the City takes cash, debit or cheque payable to the City of Mission; no credit card or e-transfer currently.
  • The City's page refers to the bylaw as "3950-2003"; the bylaw's actual number is 3590-2003.

Official forms and pages

The same question in other places

Abbotsford · Township of Langley · Maple Ridge · Langley City · Pitt Meadows · Chilliwack

Building permit fees in British Columbia, by municipality →

Sources

  1. Building Bylaw 3590-2003 (PDF, consolidated through Bylaw 6420-2026), Schedule A (read 2026-11-05)
  2. Building Permits, City of Mission (read 2026-11-05)
  3. Inspections, City of Mission (read 2026-11-05)

Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.