Pitt Meadows building permit fees

How much does a building permit cost?

Pitt Meadows, British ColumbiaChecked against official textSources read 2026-11-05

Short answer

In Pitt Meadows a residential building permit costs 1.0% of the construction value ($10 per $1,000), with a $100 minimum, plus a $100 application fee. Farm buildings with low human occupancy are 0.7%. Fees are set in Building Bylaw 2131, Schedule 1.

Key facts

Lowest fee$100 (minimum building permit fee).Building Bylaw No. 2131, 2003 - Consolidated Version (PDF, Schedule 1 amended to Bylaw 3038, 2025), Schedule 1 (m) · Wording matched the official text retrieved 2026-11-06
Official wording
Minimum Building Permit Fee $100.00
How the fee is worked outResidential (including garages, carports and patios) and commercial, industrial and institutional: 1.0% of construction value ($10 per $1,000). Farm buildings with low human occupancy: 0.7% ($7 per $1,000). If work starts without a permit, the permit fee is doubled, up to $2,500.Building Bylaw No. 2131, 2003 - Consolidated Version (PDF, Schedule 1 amended to Bylaw 3038, 2025), Schedule 1 (a)-(c), (o) · Wording matched the official text retrieved 2026-11-06
Official wording
garages, carports & patios
1.0% of construction value
Farm Buildings defined by the
0.7% of construction value
the permit fee will be doubled up to a maximum of $2,500.00
Application or plan review fee$100 building permit application fee. An additional plan review caused by a design change costs $150 (standard building) or $300 (complex building).Building Bylaw No. 2131, 2003 - Consolidated Version (PDF, Schedule 1 amended to Bylaw 3038, 2025), Schedule 1 (l), (p) · Wording matched the official text retrieved 2026-11-06
Official wording
Building Permit Application Fee $100.00
Additional plan to review due to change in design
Standard Building $150.00
Complex Building $300.00
Other feesSecurity deposit before the permit is issued: $1,500 (standard building) or $3,000 (complex). Third and later inspections, or off-hours inspections: $100 under the bylaw (the City's guide says $100 plus 0.7% of construction value). Move a building: $100. Change of occupancy: $100 plus 0.7% of construction value. Plumbing is included in the building permit.Sources differ: Also in Schedule 1: single-wide mobile home site preparation $100, double-wide $200, temporary building $100, new wood-burning appliance or chimney $100, provisional occupancy processing $250 (standard) / $350 (complex). Section 12.2 refunds 75% of the permit fee if the permit is returned within six months without starting work. Schedule 1 lists no separate demolition fee; the City's page says a demolition permit application is required.Building Bylaw No. 2131, 2003 - Consolidated Version (PDF, Schedule 1 amended to Bylaw 3038, 2025), Schedule 1 (k), (j), (h), (q); s. 12.3 to 12.6; Building and Renovating, When you need a permit?; A Guide to Building Permits, A Guide to Building Permits, p. 4 · Wording matched the official text retrieved 2026-11-06
Official wording
Standard Building $1,500.00
Complex Building $3,000.00
Multiple inspections or off-hour $100.00
Move a Building $100.00
Change of Occupancy $100.00 plus 0.7% of
Plumbing work is included in the building permit.
Multiple inspection or off-hour $100.00 + 0.7% of
How to payThe permit fee must be paid in full before any permit is issued, and the security deposit must be paid before the building permit is issued.Building Bylaw No. 2131, 2003 - Consolidated Version (PDF, Schedule 1 amended to Bylaw 3038, 2025), s. 12.1 and 12.6 · Wording matched the official text retrieved 2026-11-06
Official wording
be paid in full prior to issuance of any permit under this bylaw.
Prior to Staff issuing a building permit, a security deposit must be paid
BylawBuilding Bylaw No. 2131, 2003, Schedule 1 (Building Permit Fees).Building Bylaw No. 2131, 2003 - Consolidated Version (PDF, Schedule 1 amended to Bylaw 3038, 2025); How to Apply for a Building Permit, Step 2: Fees · Wording matched the official text retrieved 2026-11-06
Official wording
The following fees shall be paid by applicants to the City of Pitt Meadows for a Building
Building Permit Fees
Building Permit fees are based on the value of construction according to Building Bylaw No. 2131, 2003 Schedule 1.

How it works

The City of Pitt Meadows charges building permit fees under Schedule 1 of Building Bylaw No. 2131, 2003. Residential work (including garages, carports and patios) and commercial, industrial and institutional work is 1.0% of construction value ($10 per $1,000). Farm buildings with low human occupancy are 0.7% ($7 per $1,000). The minimum permit fee is $100, and there is a separate $100 application fee. The bylaw does not say whether the application fee counts toward the permit fee. The City may set construction value using the Marshall Swift Valuation Service.

Steps

  1. Ask the Building Division what construction value the City will use for your project.
  2. Apply the rate that fits your building type.
  3. Add the $100 application fee and any other fees below.
  4. Pay the permit fee in full before the permit is issued, and the security deposit before the building permit is issued. The documents read do not say which payment methods are accepted.

Good to know

  • Security deposit: $1,500 for a standard building, $3,000 for a complex building.
  • Third and later inspections, and off-hours inspections, are $100 each under the bylaw. The City's guide says $100 plus 0.7% of construction value; the other official source says otherwise, so confirm with the Building Division.
  • Other fees: moving a building $100; change of occupancy $100 plus 0.7% of construction value; extra plan review after a design change $150 (standard) or $300 (complex); single-wide mobile home site preparation $100, double-wide $200; temporary building $100; new wood-burning appliance or chimney $100; provisional occupancy processing $250 (standard) or $350 (complex).
  • If work starts without a permit, the permit fee is doubled, up to $2,500.
  • If you return the permit within six months without starting work, 75% of the permit fee is refunded.
  • When the permit is issued on certification of registered professionals, the fee is reduced by 10% (complex) or 5% (standard).

Official forms and pages

The same question in other places

Maple Ridge · Port Coquitlam · Coquitlam · Anmore · Port Moody · Belcarra

Building permit fees in British Columbia, by municipality →

Sources

  1. Building Bylaw No. 2131, 2003 - Consolidated Version (PDF, Schedule 1 amended to Bylaw 3038, 2025) (read 2026-11-05)
  2. How to Apply for a Building Permit, City of Pitt Meadows (read 2026-11-05)
  3. Building and Renovating, City of Pitt Meadows (read 2026-11-05)
  4. A Guide to Building Permits, City of Pitt Meadows (PDF) (read 2026-11-05)

Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.