GovHandbook

INR zone in Mission: Industrial Resource Extraction

Mission, British ColumbiaDraft, not yet reviewedBylaw read 2026-11-07

In short

Provide for resource extraction on land designated Resource Industrial.

Zone rules

PurposeProvide for resource extraction on land designated Resource Industrial.
Main uses
  • Resource Extraction
  • Aggregate Management
Also allowed (secondary uses)
  • Accessory Building
  • Accessory Structure
  • Enclosed Storage (Shipping Container)
  • Office (Administrative Use)
  • One Single Family Dwelling
  • Enclosed Storage
  • Outdoor Storage
Minimum lot area1.8 haApplies to lots created by subdivision.
Maximum densityN/A
Front setback15.0 m
Rear setback15.0 m
Interior side setback15.0 m
Street side setback15.0 m
Accessory building setbacks15.0 m on all sides (front, rear, interior side, exterior side)
Other rulesBuildings must be at least 6.0 m from undevelopable areas

Source: Zoning Bylaw 5949-2020 (City of Mission consolidation, includes amending bylaws adopted through September 21, 2026 (Bylaw 6434-2026)), s. 1601 (read 2026-11-07)

Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. The document says it is reproduced for convenience only and is a consolidation of the bylaw with its amending bylaws. Several sections hold more than one zone (for example Section 901 holds R465, R558, R669 and R930), so those zones share one line range. Zones CD8, CD11, CD13 and CD18 are listed in the contents as rescinded and are left out; CD16 is also rescinded. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.

This zone as Markdown · JSON · all Mission zones · Report an error