Warfield building permit fees

How much does a building permit cost in Warfield?

Warfield, British ColumbiaChecked against official textSources read 2026-11-08

Short answer

In Warfield a building permit costs $8 per $1,000 of the value of the work, with a $50 minimum, under Appendix A of Building Bylaw No. 988. Every application also pays a non-refundable application fee, which is applied against the permit cost.

Key facts

Lowest fee$50 minimum building permit fee.Building Bylaw No. 988, 2026, Appendix A · Wording matched the official text retrieved 2026-11-08
Official wording
buildings or any other work requiring a permit and not specifically listed here; Minimum fee: $50.00 $8.00 per $1,000.00 of the value of the work or portion thereof.
How the fee is worked out$8 per $1,000 of the value of the work (minimum $50). Plumbing: $10 per fixture with a building permit, or $10 per fixture plus a $75 flat rate if issued separately.Building Bylaw No. 988, 2026, Appendix A · Wording matched the official text retrieved 2026-11-08
Official wording
$8.00 per $1,000.00 of the value of the work or portion thereof. The fee for each plumbing fixture, which includes all traps and hot water tanks, shall be: $10.00
$10.00 per fixture when issued in conjunction with a Building Permit
$10.00 per fixture plus $75.00 flat rate when issued separately from a building permit
Application or plan review feeEvery application pays a non-refundable fee: the actual permit fee for work up to $10,000; $50 for work from $10,000 to $50,000; $150 for work over $50,000. This fee is applied against the permit cost.Building Bylaw No. 988, 2026, Appendix A · Wording matched the official text retrieved 2026-11-08
Official wording
Every permit application shall include a non-refundable application fee:
This fee will be applied against the cost of the permit.
$ 50.00 for each application $10,000.00
$150.00 for each application valued over $50,000.00.
Other feesExtension $100; re-inspection $75; demolition $50; moving permit $75; temporary building $75; mobile or modular home placement $75; minimum inspection fee $50; design change $75 an hour; removing a notice on title $200. Fees double if work starts before a permit (maximum $10,000). 75% refund possible before construction starts.Building Bylaw No. 988, 2026, Appendix A, Appendix A; s. 10.12 · Wording matched the official text retrieved 2026-11-08
Official wording
Building Permit Extension $100.00
Re-inspection Fee $75.00
Demolition Fee $50.00
Design Modification Fee $75.00
permit fee is doubled for every permit application if construction commenced before the building official issued a permit, to a maximum of
may be refunded 75% of a building permit or other permit fee
How to payBefore a building permit is issued, the owner must pay the Appendix A fee and any fees, charges, levies or taxes the Village imposes. Where or how to pay is not stated.Building Bylaw No. 988, 2026, Appendix A, s. 10.7 · Wording matched the official text retrieved 2026-11-08
Official wording
Before receiving a building permit for a building or structure, the owner must first pay to
the building permit fee prescribed in Appendix A
BylawVillage of Warfield Building Bylaw No. 988, 2026, Appendix A (Fees and Security Deposits)Building Bylaw No. 988, 2026, Appendix A · Wording matched the official text retrieved 2026-11-08
Official wording
Appendix A – Fees and Security Deposits

How it works

The fees are in Appendix A of the Village's Building Bylaw No. 988, 2026. The permit fee is $8 for each $1,000 of the value of the work or part of it, with a $50 minimum. Plumbing is charged per fixture: $10 a fixture with a building permit, or $10 a fixture plus a $75 flat rate if issued separately.

Every application must include a non-refundable application fee. It is the actual permit fee for work up to $10,000, $50 for work from $10,000 to $50,000, and $150 for work over $50,000. This fee is applied against the cost of the permit.

Steps

  1. Ask the RDKB Building Department (250-368-9148) for the value of work it will use for your project.
  2. Pay the application fee with your application.
  3. Pay the permit fee in Appendix A, and any other fees, charges, levies or taxes the Village imposes, before the permit is issued.

Good to know

  • Other fees: extension $100; re-inspection $75; demolition $50; moving permit $75; temporary building $75; mobile or modular home placement $75; minimum inspection fee $50; design change $75 an hour; removing a notice on title $200.
  • Fees double if work starts before a permit is issued, to a maximum of $10,000.
  • A 75% refund is possible if you cancel before construction starts.
  • The bylaw does not say where or how to pay; ask the Village Office at 250-368-8202.

Official forms and pages

The same question in other places

Trail · Rossland · Montrose · Fruitvale · Castlegar · Salmo

Building permit fees in British Columbia, by municipality →

Sources

  1. Building Bylaw No. 988, 2026, Appendix A (PDF), Village of Warfield (read 2026-11-08)

Checked by script, not yet by a person: the official wording behind 6 of 6 facts was matched to the official text. How answers are checked.