IS4 zone in Whistler: Industrial Service Four
Site-specific zone for light industrial uses, commercial services and certain offices with similar space needs or close ties to industrial activity
Zone rules
| Purpose | Site-specific zone for light industrial uses, commercial services and certain offices with similar space needs or close ties to industrial activity |
|---|---|
| Main uses |
|
| Also allowed (secondary uses) |
|
| Minimum lot area | 930 square metres |
| Minimum lot width | 23 metres |
| Maximum lot coverage | No regulations |
| Maximum density | Floor space ratio 0.75 |
| Maximum height | 12 metres |
| Front setback | 3.0 metres |
| Rear setback | 1.5 metres (5 metres where the rear setback abuts a highway) |
| Interior side setback | 0 metres (5 metres where the side setback abuts a highway or LMS 637, D.L. 4119) |
| Other rules |
|
Source: Zoning and Parking Bylaw No. 303, 2015 (consolidation dated August 8, 2026), s. Part 10, item 9 (read 2026-11-07)
Rules in the bylaw's general sections (parking, fences, suites, home businesses) also apply, and a lot can have site-specific rules. The consolidation is printed by authority of the Corporate Officer under section 139 of the Community Charter. Zones marked deleted in the bylaw (RM8, RM32, RR3, TP1 to TP3, CR3, CR5, CR6, LNP, LNL) are not listed. Zone pages are taken from the bylaw text by a research agent and have not yet been reviewed by a person: confirm with the bylaw before you rely on them. How answers are checked.
This zone as Markdown · JSON · all Whistler zones · Report an error